RAB HUTAN KOTA JOMBANG

RENCANA ANGGARAN BIAYA
Nama Pekerjaan

: PEM BANGUNAN HUTAN KOTA JOM BANG

Lokasi Pekerjaan
Pemberi Tugas

: JOM BANG, CIPUTAT, KOTA TANGERANG SELATAN
: BADAN LINGKUNGAN HIDUP DAERAH KOTA TANGERANG SELATAN

NO

ITEM PEKERJAAN

A
1
2
3
4
5

6
7

PEKERJAAN PERSIAPAN
Papan Nam a Proyek ( 90 x 120 )
Direksi Keet
Los Kerja / Gudang
Air kerja dan list rik kerja
Biaya M ob dan Dem ob
As built draw ing dan Shop draw ing
Laporan dan Dokum ent asi

B
1
2

PEKERJAAN STRIPING DAN PENGUKURAN KEM BALI
Perjaan St ripping set inggi 1 m , t enaga orang
Pekerjaan Pengukuran Kem bali Sit e


C
1
2
3
4
5
6
7
8
9
10
11

JOGGING TRACK & PLAZA
Perat aan dan pem adat an t anah
Sirt u dipadat kan t = 15 cm
Paving block K - 350 uk. 21x10.5x6 cm , abu-abu
Paving block K - 350 uk. 21x21x6 cm , ubin set w arna
Paving block K - 350 uk. 21x10.5x6 cm , w arna
Paving Expose K-350 uk. 25x50x5cm , (Pem bat as Pohon)

Paving Expose K-350 uk = 50x25x6 cm , (Ubin panjang)
Pasangan Bat u Refleksi
Kanst een abu-abu uk. 10 x 20 x 40 K-300
Drainage t erbuka 1/ 2Ø 30 cm
Lam pu t am an solar cell

D
1
2
3
4
5
6
7
8
9
10
11
12
13

14
15

TANAM AN/ POHON
Conifer t inggi 2-3 m dia. 8 -10 cm (A)
Beringin, t inggi 2-3 m dia. 8 -10 cm (t it ik B)
Kihujan, t inggi 3 m , dia. 8 -10 cm (t it ik B)
Jat i m as , t inggi 3 m , dia. 8 -10 cm (t it ik C)
Tusam , t inggi 3 m , dia. 8 -10 cm (t it ik D)
M erant , t inggi 3 m , dia. 8 -10 cm (E)
Johar kuning, t inggi 2-3 m , dia. 8 -10 cm (t it ik E)
Bunga m erah , t inggi 0.8 m (t it ik F)
Cem paka, t inggi 2-3 m (t it ik F)
M ahoni Uganda (F)
Soka, t inggi 0,3 m (t it ik G)
Rulelia, t inggi 0,3 m (t it ik G)
Rasam ala, t inggi 1,5 m (t it ik (H)
Sanint en, t inggi 0,6 m (t it ik H)
Rum put Jepang


VOLUM E

1.00
24.00
24.00
1.00
1.00
1.00
1.00

bh
m2
m2
ls
ls
ls
ls
JUM LAH

10,000.00 m 2

10,000.00 m 2
JUM LAH
1,787.42
268.11
768.94
510.22
405.06
1.00
30.00
103.20
2,043.38
1,123.86
15.00

m2
m3
m2
m2
m2
m2

bh
m2
m'
m'
unit
JUM LAH

28.00
4.00
4.00
60.00
6.00
2.00
2.00
10.00
8.00
8.00
66.00
66.00
8.00

8.00
1,100.00

phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
m2
JUM LAH


E
1
2
3
4
5

JALAN M ENUJU HUTAN KOTA
Perat aan dan pem adat an t anah
Sirt u dipadat kan t = 15 cm
Paving Expose t = 5 cm , K-350 (Ubin Classico)
Kanst een
Drainage t erbuka 1/ 2Ø 30 cm

153.00
22.95
153.00
85.00
85.00


m2
m3
m2
m'
m'
JUM LAH

HARGA SATUAN

JUM LAH HARGA

ITEM PEKERJAAN

NO
F
1
2
3
4
5

6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

JEM BATAN
Jem bat an Sem ent ara
Cerucuk baw ah Box Culvert , jarak 50cm
Galian t anah pondasi
Sirt u dipadat kan (di baw ah box culvert )
Sirt u dipadat kan (di abut m ent )
Sirt u dipadat kan (di at as box culvert )
Box Culvert 100 x 100 cm set ara rocla
Lant ai Kerja Bet on Tum buk, Ad. 1Pc : 3Ps : 5Kr t ebal 5 cm
Sloof Bet on 20/ 20 cm ad. 1 Pc : 2 Ps : 3 Split (abut m ent )
Kolom Bet on 20/ 20 cm ad. 1 Pc : 2 Ps : 3 Split (abut m ent )
Balok Bet on 20/ 20 cm ad. 1 Pc : 2 Ps : 3 Split (abut m ent )
Plat Bet on ad. 1 Pc : 2 Ps : 3 Split (penahan t anah)
Balok Bet on m em anjang 20/ 20 cm ad.1Pc:2Ps:3Split (di at as box)
Balok Bet on m elint ang 20/ 20 cm ad.1Pc:2Ps:3Split (di at as box)
Balok Bet on m elengkung 20/ 20 cm ad.1Pc:2Ps:3Split (di at as box)
Kolom Bet on 20/ 20 cm ad. 1 Pc : 2 Ps : 3 Split (abut m ent )
Bet on Plat Injak t = 15 cm ad. 1 Pc : 2 Ps : 3 Split
Railing bet on plat 10/ 20 ad. 1 Pc : 2 Ps : 3 Split (kolom )
Railing bet on plat 10/ 20 ad. 1 Pc : 2 Ps : 3 Split (balok)
Lonengan Pas. Bt . Kali 1:4
Pasangan Bat a 1:3
Plest eran 1 : 3
Pasangan Bat u Tem pel Bulat + siar
Pengecat an Dinding
Paving block

G

TURAP PASANGAN BATU KALI 1:4

VOLUM E

1.00
22.50
5.00
13.28
13.06
9.20
15.00
2.68
0.28
0.51
0.28
1.37
0.55
0.42
0.59
0.15
1.06
0.34
0.29
0.95
4.06
36.38
5.02
82.50
22.88

unit
m2
m3
m3
m3
m3
unit
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
JUM LAH

1

Galian t anah pondasi

30.62 m 3

2

Cerucuk baw ah Pas. Bt . Kali, jarak 50cm

61.33 m 2

3

Urugan Pasir Dibaw ah Pondasi Bat u Kali

4

Pasangan Bat u Kali 1 : 4

5

Pasang Suling-suling Pada Pasangan Bat u kali, PVC 2" , Klas AW, Filt er Ijuk, Unt uk
Turap s/ d 2 m

2.46 m 3
81.45 m 3
300.00 t it ik
JUM LAH

H

1
2
3
4

PEKERJAAN SANITARI
Pengeboran Sum ber Air berikut Cassing
M esin Jet Pum p 225 - 150 W ( 30 m )
Tanki Air Fiber Glass Kap. 1000 Lit er (diat as rum ah pom pa)
M em asang pipa PVC t ipe AW dia.½"

5

Pasang Kran Air Ø ½"

5.00 bh

6

Rum ah Pom pa + inst alasi penerangan. (1.5 m x 1.5 m )

2.25 m 2

1.00
1.00
1.00
250.00

t it ik
unit
bh
m

JUM LAH
I

1
2

PEKERJAAN ELEKTRIKAL
Biaya Penyam bungan baru

Penam bahan Tiang List rik

3,500.00 w at t
2.00 bh
JUM LAH

HARGA SATUAN

JUM LAH HARGA