LAMPIRAN EVALUASI AIR MINUM KASIBA

TABEL 8 REKAPITULASI HASIL EVALUASI ADMINISTRASI, TEKNIS, DAN HARGA
PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
THN ANG.
PAGU ANGG.
HPS

:
:
:
:
:
:
:

Pengembangan Utilitas Kasiba
0
Pembangunan Prasarana dan Sarana Air Minum Kasiba
KAB. BONE BOLANGO

2011
1,953,776,814.00
1,953,776,814.00
PENAWARAN

NO

1
1
2
3
4
5

NAMA PERUSAHAAN

2
CV SINAR MULIA UTAMA
CV MATARAM
CV CAHAYA KARTINI

CV UTAMA TEKNIK MANDIRI
CV BUMI BERINGIN JAYA

TOTAL HARGA
PENAWARAN
TERMASUK PPN 10%
(Rp)
3
Rp
1,691,392,000.00
Rp
1,739,103,000.00
Rp
1,767,995,700.00
Rp
1,810,466,000.00
Rp
1,837,006,000.00

KELENGKAPAN

DOKUMEN
PENAWARAN

EVALUASI
ADMINISTRASI

EVALUASI TEKNIS

EVALUASI HARGA

EVALUASI
KUALIFIKASI

4
MS
MS
MS
MS
MS


5
MS
TMS
MS
TMS
MS

6
MS
MS
MS

7
TMS
MS

8
MS

KETERANGA

N
9
GUGUR
GUGUR
GUGUR
GUGUR
LULUS

Bone Bolango, 26 September 2012
DIBUAT OLEH,
POKJA 1 KONSTRUKSI
1 IRWAN KURNIAWAN, ST

KETUA

……………………..

2 RAHMAN HASAN, ST

SEKRETARIS


……………………..

3 RAHMIATY PAKAJA, S.ST

ANGGOTA

……………………..