LAMPIRAN EVALUASI AIR MINUM KASIBA
TABEL 8 REKAPITULASI HASIL EVALUASI ADMINISTRASI, TEKNIS, DAN HARGA
PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
THN ANG.
PAGU ANGG.
HPS
:
:
:
:
:
:
:
Pengembangan Utilitas Kasiba
0
Pembangunan Prasarana dan Sarana Air Minum Kasiba
KAB. BONE BOLANGO
2011
1,953,776,814.00
1,953,776,814.00
PENAWARAN
NO
1
1
2
3
4
5
NAMA PERUSAHAAN
2
CV SINAR MULIA UTAMA
CV MATARAM
CV CAHAYA KARTINI
CV UTAMA TEKNIK MANDIRI
CV BUMI BERINGIN JAYA
TOTAL HARGA
PENAWARAN
TERMASUK PPN 10%
(Rp)
3
Rp
1,691,392,000.00
Rp
1,739,103,000.00
Rp
1,767,995,700.00
Rp
1,810,466,000.00
Rp
1,837,006,000.00
KELENGKAPAN
DOKUMEN
PENAWARAN
EVALUASI
ADMINISTRASI
EVALUASI TEKNIS
EVALUASI HARGA
EVALUASI
KUALIFIKASI
4
MS
MS
MS
MS
MS
5
MS
TMS
MS
TMS
MS
6
MS
MS
MS
7
TMS
MS
8
MS
KETERANGA
N
9
GUGUR
GUGUR
GUGUR
GUGUR
LULUS
Bone Bolango, 26 September 2012
DIBUAT OLEH,
POKJA 1 KONSTRUKSI
1 IRWAN KURNIAWAN, ST
KETUA
……………………..
2 RAHMAN HASAN, ST
SEKRETARIS
……………………..
3 RAHMIATY PAKAJA, S.ST
ANGGOTA
……………………..
PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
THN ANG.
PAGU ANGG.
HPS
:
:
:
:
:
:
:
Pengembangan Utilitas Kasiba
0
Pembangunan Prasarana dan Sarana Air Minum Kasiba
KAB. BONE BOLANGO
2011
1,953,776,814.00
1,953,776,814.00
PENAWARAN
NO
1
1
2
3
4
5
NAMA PERUSAHAAN
2
CV SINAR MULIA UTAMA
CV MATARAM
CV CAHAYA KARTINI
CV UTAMA TEKNIK MANDIRI
CV BUMI BERINGIN JAYA
TOTAL HARGA
PENAWARAN
TERMASUK PPN 10%
(Rp)
3
Rp
1,691,392,000.00
Rp
1,739,103,000.00
Rp
1,767,995,700.00
Rp
1,810,466,000.00
Rp
1,837,006,000.00
KELENGKAPAN
DOKUMEN
PENAWARAN
EVALUASI
ADMINISTRASI
EVALUASI TEKNIS
EVALUASI HARGA
EVALUASI
KUALIFIKASI
4
MS
MS
MS
MS
MS
5
MS
TMS
MS
TMS
MS
6
MS
MS
MS
7
TMS
MS
8
MS
KETERANGA
N
9
GUGUR
GUGUR
GUGUR
GUGUR
LULUS
Bone Bolango, 26 September 2012
DIBUAT OLEH,
POKJA 1 KONSTRUKSI
1 IRWAN KURNIAWAN, ST
KETUA
……………………..
2 RAHMAN HASAN, ST
SEKRETARIS
……………………..
3 RAHMIATY PAKAJA, S.ST
ANGGOTA
……………………..