Slide INF205 panduan RPL
RPL
REKAYASA PERANGKAT LUNAK
CONTENT OF…
• PERENCANAAN PROYEK PERANGKAT LUNAK
PORTAL AKADEMIK
SUB MODUL :
1. PENDAFTARAN MAHASISWA BARU
2. SELEKSI MASUK UPJ (SM-UPJ)
3. PERWALIAN
4. PENJADWALAN
5. PERKULIAHAN
6. ALUMNI
• KONSEP DAN ANALISIS
1. ANALISIS SISTEM BERJALAN
2. RUANG LINGKUP (DEKOMPOSISI / WORK BREAKDOWN
STRUCTURE (WBS)
3. 3 CONSTRAINTS ESTIMATE (TIME, COST, RESOURCE)
4. REKAYASA DAN PEMODELAN SISTEM (S/W, H/W, USER,
BUSSINESS PROCESS ARCHITECTURE (BPA) / FLOW MAP,
DATABASE, DOCUMENTATION) – SPESIFIKASI KEBUTUHAN
a. Spesifikasi kebutuhan
b. Spesifikai sistem
• METODOLOGI PENGEMBANGAN SISTEM
•
•
•
•
•
•
WATERFALL
INCREMENTAL
PROTOTYPE
SPIRAL
RUP
XP
• PERANCANGAN DATA
• PERANCANGAN PROSES (UML)
1.
2.
3.
4.
Use case diagram
Activity diagram
Class diagram
Sequence diagram
• PERANCANGAN INTERFACE
REKAYASA PERANGKAT LUNAK
CONTENT OF…
• PERENCANAAN PROYEK PERANGKAT LUNAK
PORTAL AKADEMIK
SUB MODUL :
1. PENDAFTARAN MAHASISWA BARU
2. SELEKSI MASUK UPJ (SM-UPJ)
3. PERWALIAN
4. PENJADWALAN
5. PERKULIAHAN
6. ALUMNI
• KONSEP DAN ANALISIS
1. ANALISIS SISTEM BERJALAN
2. RUANG LINGKUP (DEKOMPOSISI / WORK BREAKDOWN
STRUCTURE (WBS)
3. 3 CONSTRAINTS ESTIMATE (TIME, COST, RESOURCE)
4. REKAYASA DAN PEMODELAN SISTEM (S/W, H/W, USER,
BUSSINESS PROCESS ARCHITECTURE (BPA) / FLOW MAP,
DATABASE, DOCUMENTATION) – SPESIFIKASI KEBUTUHAN
a. Spesifikasi kebutuhan
b. Spesifikai sistem
• METODOLOGI PENGEMBANGAN SISTEM
•
•
•
•
•
•
WATERFALL
INCREMENTAL
PROTOTYPE
SPIRAL
RUP
XP
• PERANCANGAN DATA
• PERANCANGAN PROSES (UML)
1.
2.
3.
4.
Use case diagram
Activity diagram
Class diagram
Sequence diagram
• PERANCANGAN INTERFACE