DRPLN-JM dan DRPPHLN

REPUBLIC OF INDONESIA

List of Planned Priority External Loans
(DRPPLN)
2012

Ministry of National Development Planning/
National Development Planning Agency
- 2012-

FOREWORD

The List of Planned Priority External Loans (DRPPLN) is compiled on the basis of the
Government Regulation Number 10/2011 on Procedure for the Procurement of External Loans and
Grants, and the Ministerial Decree of National Development Planning/Head of National
Development Planning Agency Number 4/2011 on Procedure of the Planning, Proposing,
Assessing, Monitoring, and Evaluation of Projects Financed by External Loans and Grants. In
accordance with that regulation, the DRPPLN is a document that contains proposals of projects
from Ministries/Agencies, Local Governments and State-Owned Enterprises (SOEs) that are already
stated in the DRPLN-JM (List of Medium-Term Planned External Loans), for which their readiness
has been enhanced and have already met most of the readiness criteria, and have already obtained

the indication of funding source from the prospective lenders.
Compilation of DRPPLN 2012 has been made based on proposed projects that are already
stated in the DRPLN-JM of 2011-2014 and its revision. The proposed projects that have already met
part of the readiness criteria and have had indicative fund from prospective lenders are contained
in DRPPLN 2012. Issuance of DRPPLN 2012 was made through the Ministerial Decree of National
Development Planning/Head of National Development Planning Agency Number
KEP.74A/M.PPN/HK/07/2012. On the basis of this Decree, projects that are contained in DRPPLN
2012 total 41 projects consisting of 29 projects of Ministries/Agencies, 1 project of the Local
Government, and 11 projects of State-Owned Enterprises (SOEs). The total amount of the loans in
the DRPPLN 2012 is USD 4.8 billion, comprising USD 2.4 billion funding of projects of
Ministries/Agencies, USD 0.5 million of Local Governments, and USD 1.9 billion funding of projects
of State-Owned Enterprises (SOEs).
With the issuance of the DRPPLN 2012, it is expected that Ministries/Agencies, Local
Governments, and SOEs, of which their proposed projects are listed in DRPPLN 2012 could
enhance the readiness of those projects and carry out the follow-up steps as basis for compiling
their respective work plans, as executing agencies. For Development Partners, this DRPPLN 2012
can be used as reference in taking follow-up steps in their cooperation plan with the Government of
Indonesia. Thereby, it is expected that the implementation of projects that are funded by external
loans can become more efficient and effective.


Minister for National Development Planning/
Chairman of the National Development Planning Agency,

Armida S. Alisjahbana

i

LIST OF CONTENTS

FOREWORD ..................................................................................................................................... i
LIST OF CONTENTS ....................................................................................................................iii
INTRODUCTION ........................................................................................................................... v
LIST OF PLANNED PRIORITY EXTERNAL LOANS (DRPPLN) OF 2012 ....................... vii
1.

Recapitulation ................................................................................................................ vii

2.

List of Projects in DRPPLN 2012 ................................................................................... ix


PROJECT DIGEST .......................................................................................................................xiii

iii

INTRODUCTION

In order to improve the effectiveness and efficiency of the utilization of external loans and
grants, Government Regulation Number 2/2006 on Procedure for the Procurement of External
Loans and/or Grants and the Forwarding of External Loans and/or Grants has been revised to
become Government Regulation Number 10/2011 on Procedure for the Procurement of External
Loans and Grants. This revision has been followed by amendments to the implementing regulations
with regard on planning, namely the Ministerial Regulation
of National Development
Planning/Head of the National Development Planning Agency Number PER.005/M.PPN/06/2006 on
Planning, Proposing, and Evaluation of Projects Financed by External Loans and/or Grants to
become the Ministerial Regulation of National Development Planning/Head of the National
Development Planning Agency Number 4/2011 on Procedure of Planning, Proposing, Assessing,
Monitoring, and Evaluation of Projects Financed by External Loans and Grants. The basic change of
this regulation is the distinction of regulations of external loans and of receiving grants. In

Government Regulation (PP) Number 10/2011 regulations on external loans and receiving grants
are regulated in different chapters. Such distinction is due to the different characteristics between
External Loans and Grants, so that their processing cannot be the same.
In the management of external loans, in accordance with PP Number 10/2011, the external
loan planning document is the List of External Loans Utilization (RPPLN), the List of MediumTerm Planned External Loans (DRPLN-JM), and the List of Planned Priority External Loans
(DRPPLN). The RPPLN is a document that contains the indicated needs and planned utilization of
external loans in the medium-term. The DRPLN-JM is the list of planned projects which are
appropriate for being funded by external loans for the medium-term period. The DRPPLN is the list
of planned projects that have had a funding indication and have met the readiness criteria of
projects with a yearly effective period. The proposed projects listed in the DRPPLN must have been
stated in the DRPLN-JM. The compilation of all these documents is entrusted to the Ministry of
National Development Planning/Head of National Development Planning Agency (Bappenas).
The compilation of DRPPLN 2012 is implemented in the context of implementing PP No.
10/2011. In accordance with its stipulations, the DRPPLN 2012 contains no projects funded by
external grants, with the exception of grants as counterpart to the funding of projects through
External Loans.

v

LIST OF PLANNED PRIORITY EXTERNAL LOANS

(DRPPLN) OF 2012
1.

Recapitulation
The DRPPLN 2012 consists of 41 proposed projects, in the total loans amount of USD 4,821.6
million, with a counterpart funding of USD 1,015.4 million. The recapitulation of proposed
projects in DRPPLN 2012 on the basis of Executing Agencies is shown in Table 1. The projects
in DRPPLN 2012 can also be categorized by the type of Subsidiary Loan Agreement (SLA) loan
and Non-SLA loans (see diagram A).
Table 1. Recapitulation of DRPPLN 2012 by Executing Agencies
(in US million dollars)

No

Total of
Projects

Agency

Total

Amount of
Loans

Total
Amount of
Counterpart
Funds

1

Government Internal Control Agency

1

57.8

5.8

2


Batam Indonesia Free Zone Authority

1

50.0

5.0

3

Ministry of Religious Affair

1

123.8

20.0

4


Ministry of Home Affairs

2

470.0

3.1

5

Ministry of Marine Affairs and Fisheries

1

32.0

4.0

6


Ministry of Public Works

12

1,081.4

228.1

7

Ministry of Education and Culture

2

284.1

64.7

8


Ministry of Transportation

2

171.0

19.1

9

Ministry of Defense

5

53.6

0,3

10


Ministry of Agriculture

1

80.0

20.0

11

Ministry of Manpower and Transmigration

1

32.5

8.1

12

Local Government of DKI Jakarta Province

1

500.0

75.0

13

Indonesia Infrastructure Guarantee Fund

1

29.6

-

14

PT. Pertamina

1

303.5

209.1

15

State Electricity Company

9

1,552.3

353.1

41

4,821.6

1,015.4

Total

vii

Table 2. Recapitulation of Proposed Projects in DRPPLN 2012 (in US million dollars)

No

Total of
Proposals

Agency

Total Amount
of Loans

Total Amount of
Counterpart Funds

1

Ministries/Agencies

29

2,436.1

378.2

2

Local Governments

1

500.0

75.0

3

State-Owned Enterprises (SOEs)

11

1,885.5

562.2

41

4,821.6

1,015.4

Total

Diagram A. Proportion of SLA and Non-SLA

NonSLA
50,5%

SLA
49,5%

Category

Total of Projects

Total of Loans (in million dollars)

Non-SLA

29

2,436.1

SLA

12

2,385.5

41

4,821.6

Total

viii

2.

List of Projects in DRPPLN 2012
On July 31, 2012, the Minister for National Development Planning/Head of Bappenas had
issued the DRPPLN 2012 through Decree Number KEP.74A/M.PPN/HK/07/2012. The following
is the list of projects in DRPPLN 2012, in accordance with that Decree. The digest for the
respective projects as stated in that decree is contained in the appendix.
US$’000

No

Title

Loan

Counterpart
Fund

Lender

Government Internal Control Agency
1

State Accountability Revitalization (STAR)

57,756

2,630

ADB

50,000

5,000

Korea
(EDCF)

123,800

20,000

IDB

IDB

Batam Indonesia Free Zone Authority
2

The Development of Sewerage System in
Batam Island

Ministry of Religious Affair
3

The Development of Four State Institute of
Islamic Studies (IAIN) Project

Ministry of Home Affairs
4

Simeuleu Physical Infrastructure - Phase II

5

National Program for Self Reliant Rural
Community Empowerment

20,000

3,071

450,000

-

32,000

4,000

IFAD

150,000

15,000

Japan
(JICA)

45,000

4,500

Spain

100,000

10,000

China

87,800

8,700

China

138,000

13,800

China

World
Bank

Ministry of Marine Affairs and Fisheries
6

Coastal Community Empowerment Project

Ministry of Public Works
Directorate General of Highways
7

Bandung Intra Urban Toll Road Project
(BIUTR) Development Project Phase 1

8

Bridge Material Supply for Bridge
Replacement Program (Phase-II)

9

Development of Cileunyi-SumedangDawuan Toll Road Phase I

10

Tayan Bridge Construction

11

Toll Road Development of MedanKualanamu

ix

US$’000

No

Title

Loan

Counterpart
Fund

Lender

Directorate General of Human Settlement
12

Ibukota Kecamatan (IKK) Water Supply
Program and Small Water Treatment Plant
for Water Scarcity Area

80,000

120,000

Hungary

13

Small Scale Water Treatment Plants for
Emergency Relief

25,000

800

14

Community Based Water Supply and
Sanitation Project Phase I (SANIMAS)

100,000

15,000

15

National Community Empowerment
Program-Urban Areas Nationwide

166,000

-

16

Emission Reduction in Cities - Solid Waste
Management

100,000

19,264

Germany

Spain
IDB
World
Bank

Directorate General of Water Resources
17

Upper Citarum Basin Flood Management
Sector

36,425

13,102

Japan
(JICA)

18

Urgent Disaster Reduction for Mt. Merapi
and Lower Progo River Area (Phase II)

53,160

7,900

Japan
(JICA)

75,000

17,600

ADB,

209,100

47,122

IDB, and
SFD

14,048

1,092

Norway

157,000

18,000

Ministry of Education and Culture
19

Polytechnics Development Project

20

The Development and Upgrading of Seven
Universities in Improving the Quality and
Relevance of Education in Indonesia

Ministry of Transportation
Directorate General of Sea Transportation
21

Vessel Traffic Services (VTS) System for
Northern Part of Malacca Strait

Directorate General of Railways
22

Bandung Urban Railway Transport
Development, Electification Padalarang Cicalengka Line

France

Ministry of Defense
23

Procurement of Maritime Medical
Facilities (Dr. Mintohardjo Hospital)

10,640

-

Austria

24

Procurement of Maritime Medical
Facilities (Dr. Midiyanto Hospital)

10,640

-

Austria

x

US$’000

No

Title

Loan

Counterpart
Fund

Lender

25

Improving Capabilities and Medical
Services at RSAU Dr. Hardjolukito
Hospital Yogyakarta (Phase II of
Improvement of Aeromedical Hospital)

10,640

-

Austria

26

Procurement of Medical Equipment for
Army Hospital (Gatot Subroto Hospital)

10,640

-

Austria

27

Provision of Mobile Clean and Drinking
Water Treatment System for Emergency

11,000

305

Austria

80,000

20,000

32,500

8,125

500,000

75,000

Japan
(JICA)

29,600

-

World
Bank

303,542

209,131

Japan
(JICA)

Ministry of Agriculture
28

Sustainable Agricultural Research and
Technology (SMART-D)

World
Bank

Ministry of Manpower and Transmigration
29

Revitalization of Vocational Training
Center (VTCs) Project

IDB

Local Government of DKI Jakarta Province
30

Construction of Jakarta Mass Rapid Transit
Project

Indonesia Infrastructure Guarantee Fund
31

Indonesia Infrastructure Guarantee Fund

PT. Pertamina
32

Geothermal Total Project Development in
Lumut Balai Unit 3&4 (2x55 MW)

State Electricity Company
33

Engineering Service of Tulehu 1,2
Geothermal Power Plant (2 x 10 MW)

47,921

5,688

Japan
(JICA)

34

Engineering Service of Hululais 1,2
Geothermal Power Plant (2 x 55 MW)

7,227

715

Japan
(JICA)

35

Indramayu Steam Coal Power Plant
2x1,000 MW - Phase I: Engineering
Services

21,000

-

Japan
(JICA)

36

Pangkalan Susu Steam Coal Power Plant
(SCPP) 2x200 MW

383,000

68,000

China

xi

US$’000

No

Title

Loan

Counterpart
Fund

Lender

37

Parit Baru Steam Power Plant (2x50 MW)

132,190

23,328

China

38

Strenghthening West Kalimantan Power
Grid

99,000

18,800

ADB and
AfD

39

Takalar Steam Coal Power Plant (2x100
MW) in South Sulawesi (PLTU Punagaya
2x100 MW)

250,000

44,100

China

40

Scattered Transmission Line and
Substation in Indonesia Phase II (Indonesia
Second Power Transmission
Development/IPTD-2)

325,000

21,430

World
Bank

41

Java-Bali 500 kV Power Transmission
Crossing

287,000

171,000

4,821,628

1,015,348

Total

xii

ADB, IDB,
and AIF

PROJECT DIGEST

Badan Pengawas Keuangan dan Pembangunan (BPKP)/ Government
Internal Control Agency
1.

State Accountability Revitalization (STAR) ................................................................................. 3

Badan Pengusahaan Kawasan Perdagangan Bebas dan Pelabuhan Bebas
Batam/ Batam Indonesia Free Zone Authority
2.

The Development of Sewerage System in Batam Island ............................................................ 7

Kementerian Agama/ Ministry of Religious Affair
3.

The Development of Four State Institute of Islamic Studies (IAIN) Project .......................... 13

Kementerian Dalam Negeri/ Ministry of Home Affairs
4.

Simeuleu Physical Infrastructure - Phase II ............................................................................... 17

5.

National Program for Self Reliant Rural Community Empowerment ................................... 19

Kementerian Kelautan dan Perikanan/ Ministry of Marine Affairs and
Fisheries
6.

Coastal Community Development ............................................................................................. 23

Kementerian Pekerjaan Umum/ Ministry of Public Works
Direktorat Jenderal Bina Marga/ Directorate General of Highways
7.

Bandung Intra Urban Toll Road (BIUTR) Development Project – Phase I ............................ 29

8.

Bridge Material Supply for Bridge Replacement Program - Phase II..................................... 31

9.

Development of Cileunyi – Sumedang - Dawuan Toll Road - Phase I .................................. 33

10. Tayan Bridge Construction .......................................................................................................... 35
11. Toll Road Development of Medan-Kualanamu ........................................................................ 37
Direktorat Jenderal Cipta Karya/ Directorate General of Human Settlement
12. Ibukota Kecamatan (IKK) Water Supply Program and Small Water Treatment Plant for
Water Scarcity Area ...................................................................................................................... 41
13. Small Scale Water Treatment Plants for Emergency Relief ..................................................... 43
14. Community Based Water Supply and Sanitation Project Phase I (SANIMAS) .................... 45
15. National Community Empowerment Program-Urban Areas Nationwide ........................... 47
16. Emission Reduction in Cities - Solid Waste Management ....................................................... 49

xiii

Direktorat Jenderal Sumber Daya Air/ Directorate General of Water Resources
17. Upper Citarum Basin Flood Management Sector Loan ........................................................... 53
18. Urgent Disaster Reduction Project for Mount Merapi and Lower Progo River Area
(Phase II)......................................................................................................................................... 55

Kementerian Pendidikan dan Kebudayaan/ Ministry of Education and
Culture
19. Polytechnic Education Development Project ............................................................................ 59
20. The Development and Upgrading of Seven Universities in Improving the Quality and
Relevance of Education in Indonesia ......................................................................................... 62

Kementerian Perhubungan/ Ministry of Transportation
Direktorat Jenderal Perhubungan Laut/ Directorate General of Sea Transportation
21. Vessel Traffic Service (VTS) System for Northern Part of Malacca Strait .............................. 69
Direktorat Jenderal Perkeretaapian/ Directorate General of Railways
22. Bandung Urban Railway Transport Development, Electrification
Padalarang – Cicalengka Line ..................................................................................................... 73

Kementerian Pertahanan/ Ministry of Defense
23. Procurement of Maritime Medical Facilities (Dr. Mintohardjo Hospital) ............................ 77
24. Procurement of Maritime Medical Facilities (Dr. Midiyanto Hospital) ................................ 79
25. Improving Capabilities and Medical Services at RSAU Dr.Hardjolukito Hospital
Yogyakarta (Phase II of Improvement of Aeromedical Hospital) .......................................... 81
26. Procurement of Medical Equipment for Army Hospital (Gatot Subroto Hospital) ............. 83
27. Provision of Mobile Clean and Drinking Water Treatment System for Emergency ............ 85

Kementerian Pertanian/ Ministry of Agriculture
28. Sustainable Management of Agricultural Research and Technology Dissemination
(SMART-D) .................................................................................................................................... 89

Kementerian Tenaga Kerja dan Transmigrasi/ Ministry of Manpower and
Transmigration
29. Revitalization of Vocational Training Center (VTCs) Project ................................................. 93

Pemerintah Daerah Provinsi DKI Jakarta/ Local Government of DKI Jakarta
Province
30. Construction of Jakarta Mass Rapid Transit Project ................................................................. 99

PT Penjamin Infrastruktur Indonesia/ Indonesia Infrastructure Guarantee
Fund
31. Indonesia Infrastructure Guarantee Fund ............................................................................... 103

xiv

PT. Pertamina
32. Geothermal Total Project Development in Lumut Balai, Unit 3&4 (2x55 MW) .................. 107

PT. Perusahaan Listrik Negara (PT. PLN)/ State Electricity Company
33. Engineering Service of Tulehu 1&2 Geothermal Power Plant (2x10 MW) .......................... 111
34. Engineering Service of Hululais 1&2 Geothermal Power Plant (2x55MW) ........................ 112
35. Indramayu Steam Coal Power Plant 2x1,000 MW - Phase I : Engineering Services........... 113
36. Pangkalan Susu Steam Coal Power Plant (SCPP) 2x200 MW ............................................... 114
37. Parit Baru Steam Power Plant (2x50 MW) ............................................................................... 115
38. Strengthening West Kalimantan Power Grid .......................................................................... 116
39. Takalar Steam Coal Power Plant (2x100 MW) in South Sulawesi (PLTU Punagaya
2x100 MW) ................................................................................................................................... 118
40. Scattered Transmission Line and Substation in Indonesia Phase II (Indonesia Second
Power Transmission Development Project/IPTD-2) ............................................................... 119
41. Java-Bali 500 kV Power Transmission Crossing ..................................................................... 121

xv

Badan Pengawas Keuangan dan Pembangunan
(BPKP)/
Government Internal Control Agency

GB-12-1-001-0-2
1.

Project Title

: State Accountability Revitalization (STAR)

2.

Executing Agency

: Government Internal Control Agency (BPKP)

3.

Implementing Agency : Government Internal Control Agency (BPKP)

4.

Duration

: 60 months

5.

Location

: DKI Jakarta and 50 Inspectorates in Province/ Regency/ City

6.

Objectives

7.

8.

a.

Improved capacity of Government Internal Auditor in carrying out supervision of internal
control implementation;

b.

Availability of adequate number and qualified Accountants majoring in Government Audit
and Accounting that have conceptual understanding;

c.

Availability of professional and competent instructors in the field of management of state
finances to comply with international standard and best practices.

Scope of Projects
a.

Degree scholarship program for government internal auditors, finance officials of central
and local government institutions;

b.

Non degree scholarship program for government internal auditors, finance officials of
central and local government institutions.

Activities
Activities

Implementation Locations

Scholarship program

9.

DKI Jakarta and 50
Inspectorates in Province/
Regency/ City.

Project Implementation Units
Government Internal Control
Agency (BPKP)

Funding Source
Implementing
Agency
Government Internal
Control Agency
(BPKP)
Total

Funding (US $ 000)
Loan

Grant

Local

Source

Total

57,755

5,775

63,530

57,755

5,775

63,530

ADB

10. Disbursement Plan
Disbursement Plan (US $ 000)
1st
3,176.6

2nd
15,882.8

3rd

4th

19,058.8

3

19,058.8

5th
6,353.1

Total
63,530

GB-12-1-001-0-2
11. Funding Allocations
Activities

Categories (US $ 000)
Services

Constructions

Goods

Trainings

a. In-country degree program
for 2,500 internal auditors
and public institutions
budget officers in the area
public of public sector
accounting

19,165

b. JFA certification (persons)

6,720

c. Substance technical training
(persons)

3,938

d. Int. course/overseas
training/Benchmarking
(persons)

6,760

e. Domestic certification non
JFA (persons)

1,890

f. Controlling intern (packet)

500

g. Developing MIS for state
accountability

90

2,725

570

h. PIU Operation (packet)
2,500

3,183

k. Overseas training TOT BPKP
Staff and university lecture
(persons)
Total

615
3,100

i. Development of e-learning
for internal auditors and
budget officers training
(packet)
j. Management consultant

Others

6,000

3,273

5,225

12. Project References
BB-ID: BB-1114-R0-001-0

4

39,543

9,715

Badan Pengusahaan Kawasan Perdagangan
Bebas dan Pelabuhan Bebas Batam/
Batam Indonesia Free Zone Authority

GB-12-1-002-0-1
1.

Project Title

: The Development of Sewerage System in Batam Island

2.

Executing Agency

: Batam Indonesia Free Zone Authority

3.

Implementing Agency : Batam Indonesia Free Zone Authority

4.

Duration

: 60 months

5.

Location

: Batam

6.

Objectives

7.

8.

a.

Reducing the environmental pollution;

b.

Improving public health condition;

c.

Attracting foreign direct investment;

d.

Promoting tourism and other related industries.

Scope of Projects
a.

Updating the existing plan;

b.

Land site preparation and office building construction;

c.

Installation of piping network and pumping stations;

d.

Establishment of centralized sewerage treatment plant;

e.

Procurement of sludge collector vehicles;

f.

Procurement of sludge treatment facility for receiving septic sludge located in centralized
sewage treatment plant;

g.

Provision of sludge disposal facilities (landfill site or other method);

h.

Operations and management of the facilities;

i.

Public education program.

Activities
Activities
a. Procurement and
construction

Implementation Locations
Batam Municipality

 Removal of existing
WWTP
 Construction of
wastewater treatment
plant with the capacity of
20,000 m3/d
 Construction of one
pumping station
 Construction of 63.486
km sanitary sewer lines
 Construction of electric
and control system with
SCADA and PLC system

7

Project Implementation Units
Batam Indonesia Free Zone
Authority

GB-12-1-002-0-1
Activities

Implementation Locations

 Household connections
for 10,989 households

Project Implementation Units

Batam Municipality

Batam Indonesia Free Zone
Authority

Batam Municipality

Batam Indonesia Free Zone
Authority

 Construction of
composting facility
 Commissioning and
training
b. Consulting services
 Detailed design

Jakarta

 Design of house
connections and
composting facility
 Preparing bidding
documents and assisting
technical evaluations for
procurement contract
 Construction supervision
 Monitoring environment
impact
 Reviewing the O&M and
inspection manual
prepared by the
contractor
 Preparing project
completion report
 Assisting public
campaign and
socialization activities of
the PEA
9.

Funding Source
Funding (US $ 000)

Implementing
Agency

Loan

Batam Indonesia
Free Zone Authority
Total

Grant

Local

Total

50,000

5,000

55,000

50,000

5,000

55,000

Source
Korea (EDCF)

10. Disbursement Plan
Disbursement Plan (US $ 000)
1

st

2,437.80

2

nd

17,079.27

3rd

4th

18,298.78

8

17,184.15

5th

Total
55,000

GB-12-1-002-0-1
11. Funding Allocations
Activities

Categories (US $ 000)
Services

Constructions

a. Direct construction cost
b. Consulting services

Trainings

Others

41,799.95
4,869.70

c. Contingencies

7,665.92

d. Project management cost

567.26

e. Service charge
Total

Goods

97.17
4,869.70

41,799.95

12. Project References
BB-ID: BB-1114-R0-003-0

9

8,330.35

Kementerian Agama/
Ministry of Religious Affair

GB-12-2-003-0-1
1.

Project Title

: The Development of Four State Institute of Islamic Studies (IAIN)
Project

2.

Executing Agency

: Ministry of Religious Affairs

3.

Implementing Agency : a.

The State Institute of Islamic Studies (IAIN) North Sumatera

b.

The State Institute of Islamic Studies (IAIN) Raden Fatah

c.

The State Institute of Islamic Studies (IAIN) Semarang

d.

The State Institute of Islamic Studies (IAIN) Mataram

4.

Duration

: 48 months

5.

Location

: Medan, Palembang, Semarang, Mataram

6.

Objectives

7.

8.

a.

To transform four state institutes of Islamic studies (IAIN) into modern Islamic educational
institutions;

b.

To improve academic quality (human resources, teaching learning and research);

c.

To refine existing management into good university leadership and management;

d.

To construct new buildings for existing and new facilities, laboratories, libraries, training
centers, study centers and offices.

Scope of Projects
a.

Institutional development by opening new departments to fulfill the demand of society;

b.

Academic development to improve the quality assurance in education, and finally to reach
ISO accreditation in educational matters;

c.

Capacity building to support high qualified lecturers, administrative staffs, and students
through pursuing their study and trainings;

d.

Community empowerment through education in classes and direct service to society by
means of programs of community service.

Activities
Activities
a. Civil works
b. Procurement of equipment

Implementation Locations
Medan, Palembang,
Semarang, Mataram

c. Procurement of furniture
d. Consulting services
e. PMU

13

Project Implementation Units
IAIN Medan, IAIN Raden
Fatah (Palembang), IAIN
Walisongo (Semarang), IAIN
Mataram

GB-12-2-003-0-1
9.

Funding Source
Implementing Agency
a. The State Institute of Islamic
Studies (IAIN) North
Sumatera,

Funding (US $ 000)
Loan

Grant

Local

Total

123,800

20,000

143,800

123,800

20,000

143,800

Source
IDB

b. The State Institute of Islamic
Studies (IAIN) Raden Fatah,
c. The State Institute of Islamic
Studies (IAIN) Semarang, and
d. The State Institute of Islamic
Studies (IAIN) Mataram
Total
10. Disbursement Plan
Disbursement Plan (US $ 000)
1

2

st

6,220

nd

3rd

34,400

4th

63,550

Total

5th

143,800

39,580

11. Funding Allocations
Activities

Categories (US $ 000)
Services

Constructions

Goods

Trainings

a. Preliminary studies

400

b. Civil works

84,480

c. Furniture & fixtures

2,450

d. Equipment

23,290

e. Consulting services

3,510

f. Project management unit &
Project implementing unit

1,440

g. Training program & experts

10,000

h. Management & curriculum
development

4,610

i. Auditing

420

j. Startup workshop

130

k. Contingency
Total

Others

13.070
5,500

84,480

12. Project References
BB-ID: BB-1114-R0-004-0

14

25,740

14,610

13,470

Kementerian Dalam Negeri/
Ministry of Home Affairs

GB-12-1-004-0-2
1.

Project Title

: Simeulue Physical Infrastructure - Phase II

2.

Executing Agency

: Ministry of Home Affairs

3.

Implementing Agency : Local Government of Simeulue District

4.

Duration

: 48 months

5.

Location

: Simeulue, Nanggroe Aceh Darussalam

6.

Objectives

7.

8.

a.

To increase human resources mastering general knowledge and technology for plantation;

b.

To increase the facilities and infrastructure to support the growth of agriculture and
trading sectors;

c.

To strengthen the structure of agriculture and trading sectors in order to boost the
economic growth;

d.

To create a conducive business atmosphere in the development of agriculture and trading
sector to face the global market.

Scope of Projects
a.

Establishment of infrastructure for Palm Plantation and Palm Oil Factory;

b.

Procurement of equipment for palm oil factory;

c.

Provision of consultancy.

Activities
Activities

Implementation Locations

a. Civil works

Simeulue District

Project Implementation Units
Local Government of Simeulue
District

b. Procurement of equipment
c. Procurement of furniture
d. Consulting services
e. PMU
9.

Funding Source
Funding (US $ 000)

Implementing Agency

Loan

Local Government of
Simeulue District
Total

Grant

Local

Total

20,000

3,071

23,071

20,000

3,071

23,071

Source
IDB

10. Disbursement Plan
Disbursement Plan (US $ 000)
1st
2,600

2nd
6,000

3rd

4th

6,600

17

7,871

5th

Total
23,071

GB-12-1-004-0-2
11. Funding Allocations
Activities

Categories (US $ 000)
Services

Constructions

Goods

Trainings

Others

a. Civil works:
- palm plantation

9,437.34

- palm oil factory

1,793.10

b. Procurement of equipment

5,836.21

c. Furniture

50.00

d. Capacity building and
training
e. Consulting services

123.43
916.73

f. Project management unit

25.00

g. Contingency
Total

4,889.19
916.73

11,230.44

12. Project References
BB-ID: BB-1114-R0-006-0

18

5,886,21

123.43

4,914.19

GB-12-1-005-0-2
1.

Project Title

: National Program for Self Reliant Rural Community Empowerment

2.

Executing Agency

: Ministry of Home Affairs

3.

Implementing Agency : Directorate General of Community and Village Development,
Ministry of Home Affairs

4.

Duration

: 36 months

5.

Location

: Nationwide

6.

Objectives

7.

8.

a.

To improve under-developed rural community welfare;

b.

To create employment opportunities;

c.

To improve the community participatory for more sustainable local community welfare
program.

Scope of Projects
a.

Strengthened the capacity of community and local government in participatory
development;

b.

Providing basic production infrastructure and social infrastructure;

c.

Providing grants for sub district community.

Activities
Activities

9.

Implementation Locations

Project Implementation Units

a. Provision of block grant to
the community

All kecamatans

Central and districts level

b. Community empowerment
and provision of facilitators

All kecamatans

Central and districts level

c. Local government capacity
building

All level (central, province,
districts, sub districts

Central level

Funding Source
Implementing Agency
Directorate General of
Human Settlements,
Ministry of Public
Works
Total

Funding (US $ 000)
Loan

Grant

Local

Total

450,000

450,000

450,000

450,000

19

Source
World
Bank

GB-12-1-005-0-2
10. Disbursement Plan
Disbursement Plan (US $ 000)
1

2

st

10,800

nd

219,600

3rd

4th

Total

5th

450,000

219,600

11. Funding Allocations
Activities

Categories (US $ 000)
Services

Constructions

Goods

Trainings

a. Provision of block grant to
the community
b. Community empowerment 360,000
and provision of facilitators
c. Local government capacity
building
Total

90,000
360,000

90,000

12. Project References
BB-ID: BB-1114-R0-005-0

20

Others

Kementerian Kelautan dan Perikanan/
Ministry of Marine Affairs and Fisheries

GB-12-1-006-0-2
1.

Project Title

: Coastal Community Development

2.

Executing Agency

: Ministry of Marine Affairs and Fisheries

3.

Implementing Agency : Ministry of Marine Affairs and Fisheries

4.

Duration

: 60 months

5.

Location

: 13 Districts : Merauke District, Yapen District, Southeast Maluku
District, Ambon City, Ternate City, Kupang City, West Lombok
District, Bitung City, North Gorontalo District, Makassar City, ParePare City, Kubu Raya District, and Badung District.

6.

Objectives

7.

8.

a.

To reduce poverty and enhance sustainable economic growth in poor and potentially active
coastal and small island communities;

b.

To increase household incomes for families involved in fisheries and marine activities in
coastal and small island communities.

Scope of Projects
a.

Community empowerment, development and resource management;

b.

District support for marine-based economic development;

c.

Project Management.

Activities
Activities

Implementation Locations

Project Implementation Units

a. Community
13 Districts : Merauke District, Ministry of Marine Affairs
empowerment,
Yapen District, Southeast
and Fisheries
development and resource Maluku District, Ambon City,
management;
Ternate City, Kupang City,
b. District support for marine- West Lombok District, Bitung
based
economic City, North Gorontalo District,
Makassar City, Pare-Pare City,
development;
Kubu Raya District, and
c. Project management.
Badung District.
9.

Funding Source
Implementing
Agency
Ministry of
Marine Affairs
and Fisheries
Total

Funding (US $ 000)
Loan

Grant

Local

Total

32,000

2,000

4,000

38,000

32,000

2,000

4,000

38,000

23

Source
IFAD

GB-12-1-006-0-2
10. Disbursement Plan
Disbursement Plan (US $ 000)
1st

2nd

300

9,000

3rd

4th

10,000

Total

5th
6,700

38,000

Trainings

Others

12,000

11. Funding Allocations
Activities

Categories (US $ 000)
Services

Constructions

Goods

a. Community empowerment,
development and resource
management:


Community facilitation,
planning and
monitoring

3,000



Resource assessment,
planning and comanagement

2,500



Market focused village
development

3,000

1,000

3,500

1,500

25

4,500

5,000

155

2,000

2,400

b. District support for marinebased economic
development:


District Investment in
Small-Scale Fisheries



Market/Value Chain
Support

c. Project Management
Total

320

500

3,500
12,320

8,000

12. Project References
BB-ID: BB-1114-R0-007-0

24

1,500
600

1,000

9,500

6,180

Kementerian Pekerjaan Umum/
Ministry of Public Works

Direktorat Jenderal Bina Marga/
Directorate General of Highways

GB-12-1-007-0-2
: Bandung Intra Urban Toll Road (BIUTR) Development Project –
Phase I
: Ministry of Public Works

1.

Project Title

2.

Executing Agency

3.

Implementing Agency : Directorate General of Highways, Ministry of Public Works

4.

Duration

: 48 months

5.

Location

: Bandung, West Java

6.

Objectives

7.

8.

a.

To improve access and capacity of road networks and goods distribution leading to
improve Bandung Metropolitan Area;

b.

To enhance city development and its suburb areas to enhance the economic development;

c.

To accelerate the development of eastern Bandung area and its surrounding within
Bandung Metropolitan Area through the improvement of accessibility directly toward the
city by developing toll road network.

Scope of Projects
a.

Project pre-development (detailed engineering design, tender assistance);

b.

Construction of 54.6 km toll road;

c.

Construction supervision.

Activities
Activities

Implementation Locations

Construction and supervision

9.

Bandung

Project Implementation Units
Directorate General of Highways,
Ministry of Public Works

Funding Source
Funding (US $ 000)

Implementing
Agency

Loan

Directorate
General of
Highways,
Ministry of Public
Works
Total

Grant

Local

Total

150,000

15,000

165,000

150,000

15,000

165,000

Source
Japan (JICA)

10. Disbursement Plan
Disbursement Plan (US $ 000)
1st

2nd

16,500

49,500

3rd

4th

66,000

29

33,000

5th

Total
165,000

GB-12-1-007-0-2
11. Funding Allocations
Activities

Categories (US $ 000)
Services

Constructions

a. Civil works

148,500

b. Consultancy services

16,500

Total

16,500

148,500

12. Project References
BB-ID: BB-1114-R0-014-0

30

Goods

Trainings

Others

GB-12-1-008-0-1
1.

Project Title

: Bridge Material Supply for Bridge Replacement Program - Phase II

2.

Executing Agency

: Ministry of Public Works

3.

Implementing Agency : Directorate General of Highways, Ministry of Public Works

4.

Duration

: 24 months

5.

Location

: Sumatera

6.

Objectives

7.

a.

To replace and upgrade the bridges in Sumatera to support the development of the area
and social economy activities;

b.

To provide basic transport facilities and support the regional development.

Scope of Projects
Construction and rehabilitation of bridges in Sumatera island.

8.

Activities
Activities

Implementation Locations

a. Consulting services

Sumatera island

Directorate General of
Highways, Ministry of Public
Works

b. Construction

9.

Project Implementation Units

Funding Source
Funding (US $ 000)

Implementing
Agency

Loan

Directorate
General of
Highways,
Ministry of Public
Works
Total

Grant

Local

Source

Total

45,000

4,500

49,500

45,000

4,500

49,500

Spain

10. Disbursement Plan
Disbursement Plan (US $ 000)
1

2

st

20,000

nd

3rd

4th

5th

Total
49,500

29,500

11. Funding Allocations
Activities
a. Consulting services

Categories (US $ 000)
Services

Constructions

4,500

b. Construction
Total

45,000
4,500

45,000
31

Goods

Trainings

Others

GB-12-1-008-0-1
12. Project References
BB- ID: BB-1114-R0-015-0

32

GB-12-1-009-0-1
1.

Project Title

: Development of Cileunyi - Sumedang - Dawuan Toll Road Phase I

2.

Executing Agency

: Ministry of Public Works

3.

Implementing Agency : Directorate General of Highways, Ministry of Public Works

4.

Duration

: 36 months

5.

Location

: West Java

6.

Objectives

7.

8.

a.

To improve accessibility and capacity of road networks connecting Bandung and Cirebon
and the proposed new airport and seaport;

b.

To promote national and regional development in corridor impacted areas and cities along
the road in the eastern part of West Java;

c.

To increase productivity of the area and improve access to regional and international
market.

Scope of Projects
a.

Civil works for 58.5 km toll road;

b.

Consulting services for Detailed Engineering Design and construction supervision.

Activities
Activities

Implementation Locations

a. Consulting services

West Java

Directorate General of
Highways, Ministry of Public
Works

b. Civil work

9.

Project Implementation Units

Funding Source
Funding (US $ 000)

Implementing
Agency

Loan

Directorate
General of
Highways,
Ministry of Public
Works
Total

Grant

Local

Total

100,000

10,000

110,000

100,000

10,000

110,000

Source
China

10. Disbursement Plan
Disbursement Plan (US $ 000)
1

st

35,151.28

2

nd

52,287.58

3rd

4th

22,561.4

33

5th

Total
110,000

GB-12-1-009-0-1
11. Funding Allocations
Activities

Categories (US $ 000)
Services

Constructions

Civil work

110,000
Total

110,000

12. Project References
BB-ID: BB-1114-R0-020-0

34

Goods

Trainings

Others

GB-12-1-010-0-1
1.

Project Title

: Tayan Bridge Construction

2.

Executing Agency

: Ministry of Public Works

3.

Implementing Agency : Directorate General of Highways, Ministry of Public Works

4.

Duration

: 30 months

5.

Location

: West Kalimantan

6.

Objectives

7.

a.

To improve the accessibility and connectivity from Pontianak to Palangkaraya;

b.

To promote regional development along south corridor.

Scope of Projects
Construction and supervision of Tayan bridges at 112 km away from Pontianak in the South
corridor of Kalimantan which connects West Kalimantan and Central Kalimantan. The bridge is
designed to a single 2-landed carriageway structure with description as follows: toll bridge,
main bridge, approach road, and access road.

8.

Activities
Activities

Implementation Locations

Development (Construction and Pontianak, West
Supervision) of a single 2 lane
Kalimantan
carriageway bridge, with
description as follows:

9.



Total bridge length =
1.420m



Length of main bridge =
350 m



Length of approach road =
1.070 m



Length of access road = 3,7
km

Project Implementation Units
Directorate General of
Highways, Ministry of Public
Works

Funding Source
Implementing
Agency
Directorate
General of
Highways,
Ministry of Public
Works
Total

Funding (US $ 000)
Loan

Grant

Local

Total

87,000

8,700

95,700

87,000

8,700

95,700

35

Source
China

GB-12-1-010-0-1
10. Disbursement Plan
Disbursement Plan (US $ 000)
1st

2nd

4,406.59

30,501.09

3rd

4th

5th

Total
95,700

60,792.32

11. Funding Allocations
Activities

Categories (US $ 000)
Services

Constructions

Civil work

95,700
Total

95,700

12. Project References
BB-ID: BB-1114-R0-025-0

36

Goods

Trainings

Others

GB-12-1-011-0-1
1.

Project Title

: Toll Road Development of Medan-Kualanamu

2.

Executing Agency

: Ministry of Public Works

3.

Implementing Agency : Directorate General of Highways, Ministry of Public Works

4.

Duration

: 30 months

5.

Location

: North Sumatera

6.

Objectives

7.

a.

To improve the accessibility and capacity of road network for the movement of people and
freight to/from Medan/Tebing Tinggi as well as to/from new airport;

b.

To promote national and regional socioeconomic development in corridor-impact areas
and cities along the road in the northern part of Sumatera;

c.

To increase the productivity of the community in the area.

Scope of Projects
Development (detailed engineering design, tender, contruction, and supervision) of toll road
section that is estimated to become Government undertaking (17.8 km instead of 60 km).

8.

Activities
Activities

Implementation Locations

Civil work

9.

Medan, North Sumatera

Project Implementation Units
Directorate General of
Highways, Ministry of Public
Works

Funding Source
Funding (US $ 000)

Implementing
Agency
Directorate
General of
Highways,
Ministry of Public
Works
Total

Loan

Grant

Local

Total

138,000

13,800

151,800

138,000

13,800

151,800

Source
China

10. Disbursement Plan
Disbursement Plan (US $ 000)
1

st

36,142.37

2

nd

77,105.09

3rd

4th

38,552.54

37

5th

Total
151,800

GB-12-1-011-0-1
11. Funding Allocations
Activities

Categories (US $ 000)
Services

Constructions

Civil work

151,800
Total

151,800

12. Project References
BB-ID: BB-1114-R0-026-0

38

Goods

Trainings

Others

Direktorat Jenderal Cipta Karya/
Directorate General of Human Settlement

GB-12-1-012-0-1
1.

Project Title

: Ibukota Kecamatan (IKK) Water Supply Program and Small Water
Treatment Plant for Water Scarcity Area

2.

Executing Agency

: Ministry of Public Works

3.

Implementing Agency : Directorate General of Human Settlements, Ministry of Public Works

4.

Duration

:

5.

Location

: Nationwide

6.

Objectives

36 months

To increase access for water supply development for communities in water scarcity area.
7.

Scope of Projects
Construction water supply systems for communities in water scarcity area:

8.

a.

Construction of water treatment plant;

b.

Construction of raw water transmission pipeline;

c.

Construction of distribution pipeline.

Activities
Activities

Implementation Locations

a. Construction of water
treatment plant

Nationwide

Project Implementation Units
Directorate General of Human
Settlements, Ministry of Public
Works

b. Construction of raw water
transmission pipeline
c. Construction of distribution
pipeline

13. Funding Source
Funding (US $ 000)

Implementing
Agency

Loan

Ministry of Public
Works

Grant

80,000

Local Government
Total

80,000

Local

Total

40,000

120,000

80,000

80,000

120,000

200,000

Source
Hungary

14. Disbursement Plan
Disbursement Plan (US $ 000)
1

st

937.17

2

nd

4,444.44

3rd

4th

194,618.39

41

5th

Total
200,000

GB-12-1-012-0-1
15. Funding Allocations
Activities

Categories (US $ 000)
Services

Constructions

Construction of water
treatment plant, raw water
transmission pipeline, and
distribution pipeline

200.000

Total

200,000

16. Project References
BB-ID : BB-1114-R0-035-0

42

Goods

Trainings

Others

GB-12-1-013-0-1
1.

Project Title

: Small Scale Water Treatment Plants for Emergency Relief

2.

Executing Agency

: Ministry of Public Works

3.

Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works

4.

Duration

:

5.

Location

: Medan City, Bekasi City, Surabaya City, and Makassar City

6.

Objectives
a.

24 months

Output
Availability of small scale water treatment plant that can used effectively in case of
emergency.

b.

Outcome
Overcome the difficulties to get save drinking water in emergency situation.

7.

8.

Scope of Projects
a.

Provide small scale water treatment plants, along with its supporting equipments, truck,
and communication system for emergency relief (including operational vehicle) in four
locations (Medan, Bekasi, Makassar, and Surabaya);

b.

Construction of Location Open Storage in four locations (Medan, Bekasi, Makassar, dan
Surabaya).

Activities
Activities
a. Construction of location
open storage

Implementation Locations

 Medan (North Sumatera) Directorate General of
Human Settlements, Ministry
 Bekasi (West Java)
of Public Works
 Surabaya (East Java)
 Makassar (South
Sulawesi)

b. Provide small scale water
treatment plants, along with
its supporting equipments,
truck, and communication
system for emergency relief

Project Implementation Units

 Medan (North Sumatera)
 Bekasi (West Java)
 Surabaya (East Java)
 Makassar (South
Sulawesi)

43

GB-12-1-013-0-1
9.

Funding Source
Funding (US $ 000)

Implementing
Agency

Loan

Directorate
General of Human
Settlements,
Ministry of Public
Works

Grant

Local

25,000

25,000

Local Government
Total

Source

Total

25,000

800

800

800

25,800

Spain

10. Disbursement Plan
Disbursement Plan (US $ 000)
1st

2nd

14,361.11

3rd

4th

Total

5th

25,800

11,438.89

11. Funding Allocations
Activities

Categories (US $ 000)
Services

Constructions

Constructions of location open
storage and provide small scale
water treatment plants, along
with its supporting
equipments, truck, and
communication system for
emergency relief
Total
12. Project References
BB-ID : BB-1114-R0-043-0

44

Goods

1,970.98

23,829.02

1,970.98

23,829.02

Trainings

Others

GB-12-1-014-0-1
1.

Project Title

: Community Based Water Supply and Sanitation Project Phase I
(SANIMAS)

2.

Executing Agency

: Ministry of Public Works

3.

Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works

4.

Duration

:

5.

Location

: Nationwide

6.

Objectives

7.

48 months

a.

To increase the community awareness of sanitation;

b.

To increase the ability of local government as a facilitator development, particularly the
environmental health sector.

Scope of Projects
a. Block Grant to the existing PNPM-Urban wards: Community Block Grant (BLM) is a Block
Grant facility which will be channeled directly to communities in the target area. It is
managed and used to finance the construction of sanitation infrastructure by the
communities. The total number of villages targeted for this program is approximately 2,690
Villages scattered in 14 provinces;
b. Institutional enhancement through capacity building:
1) Training of facilitators: Facilitator training held regionally and aims to prepare the
facilitator in assisting the community.
2) Training facilities to the community of potential user : Training at the community level
by facilitators aimed to enhance the ability in development planning, operation and
maintenance of sanitation facilities.
c. Consultant services.

8.

Activities
Activities
a. Community grant;

Implementation Locations
Nationwide

Directorate General of Human
Settlements, Ministry of
Public Works

b. Capacity building; and
c. Consultant services.
9.

Project Implementation Units

Funding Source
Implementing Agency
Directorate General of
Human Settlements,
Ministry of Public
Works
Total

Funding (US $ 000)
Loan

Grant

Local

100,000

15,000

115,000

100,000

15,000

115,000

45

Source

Total
IDB

GB-12-1-014-0-1
10. Disbursement Plan
Disbursement Plan (US $ 000)
1st

2nd

20,360

30,476

3rd

4th

34,943

29,221

Total

5th

115,000

11. Funding Allocations
Activities

Categories (US $ 000)
Services

Constructions

a. Community grant

Total

Trainings

79,995

b. Capacity building
c. Consultant services

Goods

8,474
26,531
26,531

79,995

12. Project References
BB-ID : BB-1114-R0-029-0

46

8,474

Others

GB-12-1-015-0-1
1.

Project Title

: National Community Empowerment Program-Urban Areas
Nationwide

2.

Executing Agency

: Ministry of Public Works

3.

Implementing Agency : Directorate General of Human Settlements, Ministry of Public
Works

4.

Duration

: 36 months

5.

Location

: Nationwide

6.

Objectives

7.

8.

a.

To strengthen the community leadership through community self reliant organization that