ANALYST MEETING_11 AUG-2011_final. (3.46 mb)

ANALYST MEETING

Corporate Presentation
AUGUST 11, 2011

AGENDA

I.

1 st Half 2011 Results

II. Product ion Perf ormance
III. Progress of St rat egic Proj ect s
IV. Cost Management & Energy Securit y

FINANCIAL SUMMARY: 1H-2011 RESULTS
Description
(Rpbn)

1H2010


1H2011

Change
(%)

Revenue

6, 661

7. 606

14. 2

Cost of revenue

3, 500

4, 110

17. 4


Gross profit

3, 161

3, 496

10. 6

Operating expenses

1, 111

1, 223

10. 1

Operating income

2, 050


2, 273

10. 8

Ebitda

2, 273

2, 528

11. 2

Net Income

1, 627

1, 873

15. 1


2,750
2,500
2,250
2,000
1,750
1,500
1,250
1,000
750
500
250

2,528
2,129

2,273

1,782
1,159


1H-07

1H-08

1H-09

1H-10

1H-11

EBITDA Margin (%)

274

EPS (full amount)

316

15. 1


SMGR Sales Volume
1H-2011
Domestic

EBITDA (Rp billion)

1H-2010

± (%)

9,171,428

8,360,335

9.7

Export

60,860


69,056

(11.8)

TOTAL

9,232,288

8,429,391

9.5

1H-07

1H-08

1H-09

1H-10


1H-11

26. 16

31. 28

31. 45

34. 13

33. 2

NET INCOME (Rp billion)
2000
1800
1600
1400
1200
1000

800
600
400
200

1873
1627
1514
1136
700

1H-07

1H-08

1H-09

1H-10

1H-11


NET INCOME Margin (%)
1H-07

1H-08

1H-09

1H-10

1H-11

15. 79

19. 94

22. 37

24. 43


24. 60

AGENDA

I.

1st Half 2011 Result s

II. Production Performance
III. Progress of St rat egic Proj ect s
IV. Cost Management & Energy Securit y

PLANTS MAINTENANCE SCHEDULES - 2011
REALIZATION

UNIT

1

SEMEN PADANG
• Indarung II

- 670, 000 t on

(1976)

• Indarung III

- 770, 000 t on

(1981)

• Indarung IV

- 1, 620, 000 t on

(1993)

• Indarung V

- 2, 840, 000 t on

(1998)

SEMEN GRESIK
• Tuban I

- 2, 900, 000 t on

(1994)

• Tuban II

- 3, 000, 000 t on

(1997)

• Tuban III

- 3, 100, 000 t on

(1998)

SEMEN TONASA
• Tonasa II

- 610, 000 t on

(1980)

• Tonasa III

- 610, 000 t on

(1985)

• Tonasa IV

- 2, 880, 000 t on

(1996)

Annual maint enance (realizat ion up t o 7M2011)
Annual maint enance (prognoses)

2

3

4

PROGNOSES
5

6

7

8

9

10

11

12

PRODUCTION PERFORMANCE
7M-2011

Unit
• Semen Gresik
• Semen Padang
• Semen Tonasa
TOTAL

Cement Production

Growth (%)

5, 400, 000

5. 3

3, 250, 000

-

2, 050, 000

(3. 6)

10, 700, 000

1. 9

Prognoses Production

Growth (%)

9, 700, 000

9. 6

6, 050, 000

6. 6

3, 750, 000

2. 7

19, 500, 000

7. 3

PROGNOSES 2011
Unit

• Semen Gresik
• Semen Padang
• Semen Tonasa
TOTAL

TARGET 2012
Unit

Cement Production

• Semen Gresik
• Semen Padang
• Semen Tonasa

11, 700, 000

TOTAL

23, 000, 000

6, 200, 000
5, 100, 000

DE-BOTTLENECKING PROJECTS

UNIT

2010

PLANTS

INITIAL CAPACITY

Cement Mill – Indarung III

110 t ph - cement

Cement Mill – Indarung IV

120 t ph - cement

Kiln – Tuban I

7, 500 t pd - clinker

Kiln – Tuban II

7, 600 t pd - clinker

Kiln – Tuban III

7, 800 t pd - clinker

FEB

APR

2011
MAY

AUG

JAN

APR

MAY

130 t ph
150 t ph
8, 500 t pd
8, 200 t pd
8, 200 t pd

9, 000 t pd

AGENDA

I.

1st Half 2011 Result s

II. Product ion Perf ormance
III. Progress of Strategic Proj ects
IV. Cost Management & Energy Securit y

PROGRESS OF TUBAN IV CEMENT PLANT
• Design Cap
• Investment Cost

: 2.5 million tpa
: US$304 mio
STATUS DATE

YEAR

2008

QUARTER

1

2

2009
3

4

1

2

2010
3

4

PREPARATION

91.14%

93.60%

M ANAGEM ENT

84.87%

96.71%

1

2

2011
3

4

1

2

2012
3

4

1

2

100%

% Progress
ENGINEERING

100.00%

100.00%

PROCUREM ENT

97.01%

CONSTRUCTION

79.00%

91.07%

97.65%

% Plan

71.61%

91.34%
COM M ISSIONING

9.62%

9.56%

0.00%
–Plan

–Real

3

4

PROGRESS OF TONASA V CEMENT PLANT
• Design Cap
• Investment Cost

: 2.5 million tpa
: US$290 mio
STATUS DATE

YEAR

2008

QUARTER

1

2

3

2009
4

1

2

2010

3

4

PREPARATION

96.43%

98.38%

M ANAGEM ENT

88.09%

92.76 %

ENGINEERING
PROCUREM ENT
CONSTRUCTION
COM M ISSIONING

83.86%

2

3

4

1

2

63.37 %
3.52 %

0.00%
–Plan

1

2

3

89.39 %

97.51 %

3.52 %

4

% Progress

% Plan
93.33%

3

2012

100%

100.00 %

100.00%
98.05%

1

2011

–Real

4

PROGRESS OF POWER PLANT
• Design Cap
• Investment Cost

: 2 x 35 M W
: US$114 mio
STATUS DATE

YEAR

2009

QUARTER

1

2

2010
3

4

1

2

PREPARATION

100.00%

M ANAGEM ENT

63.08%

63.09%

ENGINEERING

85.74%

81.15%

PROCUREM ENT

41.48%

44.36%

2011
3

4

1

2

2012
3

4

1

2

3

4
100%

100.00%

% Progress
39.43%

CONSTRUCTION

20.17%

% Plan

18.06%

38.67%
COM M ISSIONING

0.00%

0%
–Plan

–Real

DESIGN CAPACITY (Mio Ton)
28. 7
26. 2

26.9

8. 7

New
Capacity

23. 0

18. 0
17. 1

1. 8

1.0

19. 0

19. 0

0.7

0,3

20. 2
3. 1

Upgrading

16. 9

Based
Capacity

Export
sales ▪
Domest ic
sales ▪

15. 2

16. 7

17. 8

17, 7

2007

2008

2009

2010

2011F 2012F 2013F 2014F 2015F

AGENDA

I.

1st Half 2011 Result s

II. Product ion Perf ormance
III. Progress of St rat egic Proj ect s
IV. Cost Management & Energy Security

COST MANAGEMENT
Domest ic ASP 2009 - 2011

COGS per t on 2009 - 2011

850000

750000

650000

550000

450000

350000
3M2009

6M2009

9M2009

FY2009

3M2010

6M2010

9M2010

FY2010

3M2011

6M2011

ROADMAP OF CDM PROJECT

ENERGY SECURITY
In order to secure energy, the Company is converting coal calorie value from high
rank to medium – low rank coal which requires new coal mill additional facilities, as
follows:
2011

2013

May

4Q

EQUIPMENT
New Coal Mill – Tuban *)

80 tph

New Coal Mill - Indarung

50 tph

New Coal Mill - Tonasa

80 tph

*) The const ruct ion of new Coal Mill at Tuban wit h design
capacit y of 80 t ph, required t o meet pulverized coal at
Tuban 1, 2, 3 which designed t o consume medium – low
calorie value of coal, as t he current exist ing Coal Mill of
3x50 t ph is not adequat e t o meet cement product ion
capacit y.

THANK YOU
IMPORTANT NOTICE
THIS PRESENTATION IS NOT AND DOES NOT CONSTITUTE OR FORM PART OF, AND IS NOT MADE IN CONNECTION WITH, ANY OFFER FOR SALE OR SUBSCRIPTION OF OR SOLICITATION,
RECOMMENDATION OR INVITATION OF ANY OFFER TO BUY OR SUBSCRIBE FOR ANY SECURITIES NOR SHALL IT OR ANY PART OF IT FORM THE BASIS OF OR BE RELIED ON IN
CONNECTION WITH ANY CONTRACT, COMMITMENT OR INVESTMENT DECISION WHATSOEVER.
THE SLIDES USED IN THIS PRESENTATION ARE STRICTLY CONFIDENTIAL AND HAVE BEEN PREPARED AS A SUPPORT FOR ORAL DISCUSSIONS ONLY. THE INFORMATION CONTAINED IN
THIS PRESENTATION IS BEING PRESENTED TO YOU SOLELY FOR YOUR INFORMATION AND MAY NOT BE REPRODUCED OR REDISTRIBUTED TO ANY OTHER PERSON, IN WHOLE OR IN
PART.
This presentation includes forward-looking statements, which are based on current expectations and forecast about future events. Such statements involve known / unknown risks uncertainties
and other factors, which could cause actual results to differ materially from historical results or those anticipated. Such factors include, among others:
● economic, social and political conditions in Indonesia, and the impact such conditions have on construction and infrastructure spending in Indonesia;
● the effects of competition;
● the effects of changes in laws, regulations, taxation or accounting standards or practices;
● acquisitions, divestitures and various business opportunities that we may pursue;
● changes or volatility in inflation, interest rates and foreign exchange rates;
● accidents, natural disasters or outbreaks of infectious diseases, such as avian influenza, in our markets;
● labor unrest or other similar situations; and
● the outcome of pending or threatened litigation.
We can give no assurance that our expectations will be attained.
DISCLAIMER
The information contained in this report has been taken from sources which we deem reliable. However, none of PT Semen Gresik (Persero) Tbk and/or its affiliated companies and/or their
respective employees and/or agents make any representation or warranty (express or implied) or accepts any responsibility or liability as to, or in relation to, the accuracy or completeness of the
information and opinions contained in this report or as to any information contained in this report or any other such information or opinions remaining unchanged after the issue thereof.
We expressly disclaim any responsibility or liability (express or implied) of PT Semen Gresik (Persero) Tbk, its affiliated companies and their respective employees and agents whatsoever and
howsoever arising (including, without limitation for any claim, proceedings, action, suits, losses, expenses, damages or costs) which may be brought against or suffered by any person as a
result of acting in reliance upon the whole or any part of the contents of this report and neither PT Semen Gresik (Persero) Tbk, its affiliated companies or their respective employees or agents
accepts liability for any errors, omission or mis-statements, negligent or otherwise, in the report and any liability in respect of the report or any inaccuracy therein or omission therefrom which
might otherwise arise is hereby expresses disclaimed.

Main Office:
Main Building of Semen Gresik
Jln. Veteran Gresik 61122 –
Indonesia
Phone: (62-31) 3981731 -2, 3981745
Fax: (62-31) 3983209, 3972264

Representative Office:
Gedung The East, 18th Floor,
Jln. Lingkar Mega Kuningan Kav. E3.2 No. 1,
Jakarta 12950 – Indonesia
Phone : (62-21) 5261174 – 5
Fax
: (62-21) 5261176

www.semengresik.com

16