KEC. TELLU SIATINGNGE

PEKERJAAN :
BALAI NIKAH DAN MANASIK HAJI

PEMBANGUNAN
GEDUNG DAN FASILITAS
BALAI NIKAH DAN MANASIK HAJI

KANTOR URUSAN AGAMA (KUA)
KECAMATAN TELLU SIATINGNGE KABUPATEN BONE

LOKASI : KECAMATAN TELLU SIATINGNGE

CV. ORIENT ENGINEERING

DAFTAR ISI
NAMA GAMBAR

HALAMAN

NAMA GAMBAR


HALAMAN

PETA LOKASI

1

RECANA ATAP

18

SITE PLAN

2

RENC. INSTALASI LISTRIK

19

DENAH lOKASI


3

RECANA GARIS ATAP

20

DENAH

4

LAYOUT FURNITURE

21

RENC. KABEL LAN DAN TV

22

RENCANA PLAFOND DALAM


23

DETAIL PLAFOND

24

RENCANA PLAFOND LUAR

25
26

TAMPAK DEPAN
5
TAMPAK BELAKSNG
TAMPAK SAMPING KANAN
6
TAMPAK SAMPING KIRI
POTONGAN A - A

7


RENCANA KERAMIK

POTONGAN B - B

8

RENCANA PONDASI

9

DETAIL POT. PLAT TOILET
DETAIL PIPABUANGAN AIR HUJAN
POTONGAN PLAFOND
SEPTIK TANK

DETAIL PONDASI BATU KALI

27
28


10

RESEPSIONIS

DETAIL POER

29

RENCANA RINGBALK

11

PAGAR

30

DETAIL PEMBESIAN

12


POTONGAN PAGAR

31

PERLETAKAN KUSEN

13

DETAIL KUSEN PINTU DAN JENDELA

14

DETAIL KUSEN PINTU DAN JENDELA

15

DETAIL KUSEN PINTU DAN JENDELA

16


RENCANA ATAP

17

U

PETA KABUPATEN BONE
B

T

S

KE

C.
CE

NR


AN

A

KEC.AJANGALE

OE

CC

UA

BO

C.D

KE

E


ING

TT

KEC.AMALI

LU
EL

SIA

C.T

KE

KEC.AWANGP

KA


AK

AL

C.P

KE

KEC.LAMURU

KEC.TA
RIATTA NETE
NG TIM
UR

RIA KEC
TT .TA
AN NE
T
G

BA E
RA
T

KEC.ULAWENG

KEC.TAN
ETE
RIATTANG

ONE

SAHRULI ASMAR, ST, MSi

PO

E

KEC.BAREBBO

KE

C.T

EL

LU

LIM

KEC.BENGO

KEC.PONRE

KEC.SIBULUE

KEC.CINA

SAHRUDIN, S.Ag
KEC.LAPPARIAJA

KEC. MARE

DRS. SUDIRMAN, S.ST, MSI

KEC.LIBURENG

PETA SULAWESI SELATAN
KEC. TONRA

KEC. PATIMPENG

Luwu Utara

Luwu Timur

Drs. H. M. AMIN M., M.HI

Luwu
Tanah Toraja Utara

KEC. KAHU
KEC. SALOMEKKO

CV. ORIENT ENGINEERING

Palopo

Tanah Toraja

KEC. BONTOCANI
Luwu

Pinrang

KEC. KAJUARA

Pinrang

Ir. ABD. BASIT AMIR

Sidrap

Wajo

Parepare

Soppeng

Barru

Bone

Pangkep

Maros
ar

kass

Ma

PETA LOKASI

Sinjai

Gowa
Takalar

Bulukumba

Bantaeng

Jeneponto

PETA LOKASI
INDEX PETA

2300

2600

JALAN

JALAN

LAPANGAN

SAHRULI ASMAR, ST, MSi

SAHRUDIN, S.Ag

JALAN POROS
DRS. SUDIRMAN, S.ST, MSI

KANTOR CAMAT

Drs. H. M. AMIN M., M.HI

CV. ORIENT ENGINEERING

Ir. ABD. BASIT AMIR

SITE PLAN KUA TELLU SIATINGE
SKALA 1:150

SITE PLAN

R. BALAI NIKAH &
MANASAIK HAJI

RUANG
PENYULUH

150
150
TERAS
-0.05

RUANG TAMU

RESEPSIONIS

KORIDOR

MUSOLLAH

RUANG
KEPALA KUA

RUANG STAFF

KM / WC
-0.05

RUANG
KOMPUTER

RUANG
ARSIP

185

R. LAMMING
+0.25

PANTRY

TERAS
-0.05

2300

RUANG
PENGHULU

KM / WC
-0.05

TEMPAT WUDHU

2600

393

493

558

1300
1500

DENAH LOKASI

2000

50

200

100

1600

493
393
DENAH LOKASI

A
1850

350

300

350

150

125

225

350

100

250

125

RUANG
KEPALA KUA

350

RUANG STAFF

RUANG
ARSIP

RUANG
KOMPUTER

200

KM / WC
-0.05

100

450

200

TERAS
-0.05

150

B

RUANG TAMU

1300

RESEPSIONIS

MUSOLLAH

B

250

KORIDOR

RUANG
PENYULUH

SAHRULI ASMAR, ST, MSi

SAHRUDIN, S.Ag

400

1300

50
200

150

DRS. SUDIRMAN, S.ST, MSI

R. LAMMING
+0.00

RUANG
PENGHULU

KM / WC
-0.05

125

100

200

450

250

Drs. H. M. AMIN M., M.HI

450

CV. ORIENT ENGINEERING

Ir. ABD. BASIT AMIR

125

250

350

100

250

1600

A

150

TEMPAT WUDHU

350

R. BALAI NIKAH &
MANASAIK HAJI

PANTRY

350

TERAS
-0.05

100

DENAH
SKALA 1:100

BALAI NIKAH DAN MANASIK HAJI

KANTOR URUSAN AGAMA (KUA)
KECAMATAN TELLU SIATINGNGE KABUPATEN BONE

Tampak Depan
SKALA 1:100

BALAI NIKAH DAN MANASIK HAJI

KANTOR URUSAN AGAMA (KUA)
KECAMATAN TELLU SIATINGNGE KABUPATEN BONE

SAHRULI ASMAR, ST, MSi

Tampak Depan
SKALA 1:100

SAHRUDIN, S.Ag

DRS. SUDIRMAN, S.ST, MSI

Drs. H. M. AMIN M., M.HI

CV. ORIENT ENGINEERING

Ir. ABD. BASIT AMIR

Tampak Belakang
SKALA 1:100

Tampak Depan
Tampak Belakang

SAHRULI ASMAR, ST, MSi

Tampak Samping Kanan
SKALA 1:100

SAHRUDIN, S.Ag

DRS. SUDIRMAN, S.ST, MSI

Drs. H. M. AMIN M., M.HI

CV. ORIENT ENGINEERING

Ir. ABD. BASIT AMIR

Tampak Samping Kanan
Tampak Samping KIRI

Tampak Samping KIRI
SKALA 1:100

Genteng Bubungan Multi Roof
Genteng Multi Roof
Kuda-kuda Baja Ringan
Reng Baja Ringan

Nusaplank
850

390

850

345
208

80

200

Kalsiboard T: 3,5mm

SAHRULI ASMAR, ST, MSi

245
130

250

230
Kalsiboard T: 3,5mm

Kalsiboard T: 3,5mm

80

SAHRUDIN, S.Ag

Dinding Finish Cat
Dinding Finish Cat

50

Dinding Finish Cat

450
350

DRS. SUDIRMAN, S.ST, MSI

RUANG STAFF

RUANG PENGHULU
30

Drs. H. M. AMIN M., M.HI

80

125

125

CV. ORIENT ENGINEERING

1550
Ir. ABD. BASIT AMIR

POTONGAN A - A
SKALA 1:100

POTONGAN A - A

802
100

100

100

100

100

100

100

102

Nusaplank

390
500

80

500

Kalsiboard T: 3,5mm

Kalsiboard T: 3,5mm

Kalsiboard T: 3,5mm

SAHRULI ASMAR, ST, MSi

18

80

60

352
Dinding Finish Cat

Dinding Finish Cat

Dinding Finish Cat

SAHRUDIN, S.Ag

40

Dinding Finish Cat

450
DRS. SUDIRMAN, S.ST, MSI

300
MUSOLLAH

KORIDOR

RUANG TAMU

200
TERAS
-0.05

30

60

80

350

1250

250

Drs. H. M. AMIN M., M.HI

CV. ORIENT ENGINEERING

1600

Ir. ABD. BASIT AMIR

POTONGAN B - B
SKALA 1:100

POTONGAN B - B

1850

100

350

300

350

K1

150

S1

350

100

250

K1

Poer

Poer
K3

S1

K1

K1

350

S1

K1

K3
K3

K1
S1

450
K3
K1

S1

S1

K1

SAHRULI ASMAR, ST, MSi

K1
250
S1

S1

K1

S1

K2
SAHRUDIN, S.Ag

K1
1300

400
K1

200

S1

S1

K1

1300

DRS. SUDIRMAN, S.ST, MSI

K1
K1

K1

S1

K1

K1

K1

S1

K1

S1

K1

K2

350
S1
K1

K3

K1

Drs. H. M. AMIN M., M.HI

450
K3

CV. ORIENT ENGINEERING

S1
S1
150

S1

K1

K1

K1

K1

Poer

Poer
S1

K1

Ir. ABD. BASIT AMIR

K3

100

200

K3

450

250

250

350

100

250

1600

RENCANA PONDASI

RENCANA PONDASI
SKALA 1:100

15
PLIN LANTAI CAT MINYAK
(WARNA HITAM)

30

PASANGAN 1/2 BATU BATA
SLOF 20/30

150

PONDASI BATU KALI
30

30

10

SAHRULI ASMAR, ST, MSi

20

30

20

18

60

11

20

SAHRUDIN, S.Ag
25

80

60

TANAH URUG

DRS. SUDIRMAN, S.ST, MSI

20
5

60

BATU KOSONG
PASIR URUG

Drs. H. M. AMIN M., M.HI

CV. ORIENT ENGINEERING
60

60
Ir. ABD. BASIT AMIR

DETAIL POER

25

SKALA 1:20

60

DETAIL PONDASI BATU KALI 1
SKALA 1:20

DETAIL PONDASI BATU
KALI & DETAIL POER

1850

350

300

350

150

350

100

250

RB 15 X 20
125
RB 15 X 20
RB 15 X 20

RB 15 X 20

RB 15 X 20

RB 15 X 20

RB 15 X 20

RB 15 X 20

RB 15 X 20

400

1300

SAHRUDIN, S.Ag

DRS. SUDIRMAN, S.ST, MSI

RB 15 X 20

RB 15 X 20

RB 15 X 20

RB 15 X 20

RB 15 X 20
RB 15 X 20

350

RB 15 X 20

RB 15 X 20

RB 15 X 20

RB 15 X 20

RB 15 X 20

RB 15 X 20
RB 15 X 20

RB 15 X 20

RB 15 X 20

RB 15 X 20

200

450

SAHRULI ASMAR, ST, MSi

RB 15 X 20

1300

RB 15 X 20

250

RB 15 X 20

RB 15 X 20

RB 15 X 20

RB 15 X 20

350

125

450

CV. ORIENT ENGINEERING

150
RB 15 X 20

450

RB 15 X 20

RB 15 X 20

RB 15 X 20
125

200

Drs. H. M. AMIN M., M.HI

125

RB 15 X 20

250

250

Ir. ABD. BASIT AMIR

350

100

250

1600

RENCANA RINGBALK
SKALA 1:100

RENCANA RINGBALK

15
30
30

15
30

15
SAHRULI ASMAR, ST, MSi

DETAIL (K1)
SKALA 1:20

DETAIL (K2)
SKALA 1:20

DETAIL (K3)
SKALA 1:20
SAHRUDIN, S.Ag

20
15
30

DRS. SUDIRMAN, S.ST, MSI

20

Drs. H. M. AMIN M., M.HI

DETAIL SLOOP
SKALA 1:20

DET. RINGBALK
SKALA 1:20

CV. ORIENT ENGINEERING

Ir. ABD. BASIT AMIR

DETAIL PEMBESIAN

1850

100

350

300

125

J1

350

150

J1

J2

J1

350

100

250

125

J1
P4

J1

350

P3

J1

450

P3
SAHRULI ASMAR, ST, MSi

P3
P3

J1

250

P3
SAHRUDIN, S.Ag

1300

P1

150

J1

200

400

1300

50
200P3

150

P3

P2

DRS. SUDIRMAN, S.ST, MSI

P3

100
350
Drs. H. M. AMIN M., M.HI

J1

450

P4

CV. ORIENT ENGINEERING

150

J2

J1

J1

Ir. ABD. BASIT AMIR

J1

J1
100

200

450

250

250

350

100

250

1600

RENC.PERLETAKAN KUSEN
SKALA 1:100

RENCANA
PERLETAKAN KUSEN

5
30
15

30

385

4
10

Aluminium Composite Panel

Aluminium Composite Panel

300

28

130
SAHRULI ASMAR, ST, MSi

220
SAHRUDIN, S.Ag

30

10
3
19
3
10
3

DRS. SUDIRMAN, S.ST, MSI

19
3
10

10

80
54

10 10

80
54

Drs. H. M. AMIN M., M.HI

CV. ORIENT ENGINEERING
10

385

15

19

PINTU UTAMA (P1)
SKALA 1:50

Ir. ABD. BASIT AMIR

5

158

5

PINTU (P2)
SKALA 1: 20

5

55 65

5
15

61
5

5

5
15

9
71

KACA
5 mm

55

39

5
8

9

5

JALUSI (J2)
SKALA 1:50
SAHRULI ASMAR, ST, MSi

KACA
5 mm

KACA
5 mm

275

215

SAHRUDIN, S.Ag

211

210

5

KACA
5 mm

KACA
5 mm

35

5

214

60

60

5

5

15

5
15

5

CV. ORIENT ENGINEERING

JENDELA (J1)

15
84

73

92

PINTU TOILET (P4)
PINTU (P3)
SKALA 1:50

Drs. H. M. AMIN M., M.HI

135

82
5

DRS. SUDIRMAN, S.ST, MSI

SKALA 1:50
CATATAN: PINTU TOILET
TAHAN AIR

SKALA 1:50
Ir. ABD. BASIT AMIR

SAHRULI ASMAR, ST, MSi

SAHRUDIN, S.Ag

DRS. SUDIRMAN, S.ST, MSI

Drs. H. M. AMIN M., M.HI

CV. ORIENT ENGINEERING

Ir. ABD. BASIT AMIR

TAMPAK ATAS
SKALA 1:100

TAMPAK ATAS

Reng baja ringan jarak 25 cm
Perletakan Kuda-Kuda
100

100

Lisplank

93
93

SAHRULI ASMAR, ST, MSi

SAHRUDIN, S.Ag

DRS. SUDIRMAN, S.ST, MSI

Drs. H. M. AMIN M., M.HI

CV. ORIENT ENGINEERING

Ir. ABD. BASIT AMIR

RENCANA ATAP
SKALA 1:100

RENCANA ATAP

KETERANGAN
SAMBUNGAN
KABEL

1850

100

350

300

LAMPU PIJAR
9 WATT

350

150

350

100

LAMPU SL 20
WATT

250

METERAN
MCB

125

SAKLAR TUNGGAL

125

SAKLAR GANDA
STOP KONTAK

350
450

SAHRULI ASMAR, ST, MSi

250

SAHRUDIN, S.Ag

1300

400

150

200

1300

50
200

150

DRS. SUDIRMAN, S.ST, MSI

100
350

450

CV. ORIENT ENGINEERING

TEMPAT WUDHU

150

125

100

Drs. H. M. AMIN M., M.HI

200

450

Ir. ABD. BASIT AMIR

125

250

250

350

100

250

1600

RENC.INSTALASI LISTRIK
SKALA 1:100

RENCANA
INSTALASI LISTRIK

SAHRULI ASMAR, ST, MSi

SAHRUDIN, S.Ag

DRS. SUDIRMAN, S.ST, MSI

Drs. H. M. AMIN M., M.HI

CV. ORIENT ENGINEERING

Ir. ABD. BASIT AMIR

RENCANA GARIS ATAP
SKALA 1:100

RENCANA GARIS ATAP

1850

100

350

300

350

150

KM / WC
-0.05

100

250

125

RUANG
KEPALA KUA

350

RUANG STAFF

RUANG
ARSIP

RUANG
KOMPUTER

125

350

450

150

TERAS
-0.05

RUANG TAMU

RESEPSIONIS

RUANG
PENYULUH

200

1300

KORIDOR

250

MUSOLLAH

SAHRULI ASMAR, ST, MSi

SAHRUDIN, S.Ag

400

1300

50
200

150

DRS. SUDIRMAN, S.ST, MSI

R. LAMMING
+0.25

RUANG
PENGHULU

R. BALAI NIKAH &
MANASAIK HAJI

PANTRY
KM / WC
-0.05

150

TEMPAT WUDHU

350

TERAS
-0.05

100

125

100

200

450

250

450

Drs. H. M. AMIN M., M.HI

CV. ORIENT ENGINEERING

Ir. ABD. BASIT AMIR

125

250

350

100

250

1600

LAYOUT FURNITURE
SKALA 1:100

RENCANA RINGBALK

1850

350

300

350

150

RUANG
KEPALA KUA

KM / WC
-0.05
RESEPSIONIS

450

150

TERAS
-0.05

RUANG
PENYULUH

200

1300

250

SAHRULI ASMAR, ST, MSi

KORIDOR

250

MUSOLLAH

350

100

125

RUANG STAFF

RUANG
ARSIP

RUANG
KOMPUTER

125

350

RUANG TAMU

100

400

1300

SAHRUDIN, S.Ag

50
200

150

DRS. SUDIRMAN, S.ST, MSI

R. LAMMING
+0.25

RUANG
PENGHULU

R. BALAI NIKAH &
MANASAIK HAJI

PANTRY
KM / WC
-0.05

150

TEMPAT WUDHU

350

TERAS
-0.05

100

125

100

200

450

250

450

CV. ORIENT ENGINEERING

125

250

Drs. H. M. AMIN M., M.HI

Ir. ABD. BASIT AMIR

350

100

250

1600

RENCANA KABEL LAN DAN TV
SKALA 1:100

RENCANA KABEL
LAN DAN TV

1850

100

350

300

350

150

125

Plafond
kalsiboard

350

350

100

250

125

Plafond
kalsiboard
+ 4.00

+ 4.00

Plafond
kalsiboard

450

+ 4.00

SAHRULI ASMAR, ST, MSi

Plafond
kalsiboard

250

+ 4.00

Plafond
kalsiboard

200

Plafond
kalsiboard

+ 4.00

Plafond
kalsiboard

1300

Rangka Plafond
hollow 44 60 -60
SAHRUDIN, S.Ag

400

+ 4.00

1300

+ 4.00

DRS. SUDIRMAN, S.ST, MSI

350

Plafond
kalsiboard

Plafond
kalsiboard

450

Drs. H. M. AMIN M., M.HI

+ 4.00

+ 4.00

CV. ORIENT ENGINEERING
150

125

100

200

450

Ir. ABD. BASIT AMIR

125

250

250

350

100

250

1600

RENCANA PLAFOND DALAM
SKALA 1:100

RENCANA
PLAFOND DALAM

SAHRULI ASMAR, ST, MSi

as
CROSS RUNNER

FURING CHANNEL
as
MAIN RUNNER

SAHRUDIN, S.Ag

DRS. SUDIRMAN, S.ST, MSI

Drs. H. M. AMIN M., M.HI

CV. ORIENT ENGINEERING

Ir. ABD. BASIT AMIR

DETAIL PLAFOND
SKALA 1:100

DETAIL PLAFOND

1850

100

350

300

Plafond kalsiboard

350

125

150

Plafond kalsiboard

350

100

250

125

350
450

SAHRULI ASMAR, ST, MSi

200

Plafond kalsiboard

1300

Plafond kalsiboard

250

SAHRUDIN, S.Ag

400

1300

DRS. SUDIRMAN, S.ST, MSI

350

450

Drs. H. M. AMIN M., M.HI

CV. ORIENT ENGINEERING
150

Plafond kalsiboard

100

200

450

Plafond kalsiboard

125

250

250

Ir. ABD. BASIT AMIR

125

350

100

250

1600

RENCANA PLAFOND LUAR
SKALA 1:100

RENCANA
PLAFOND LUAR

1850

100

350

300

350

150

125

keramik granit
60x60

350

keramik granit
60x60

keramik
40x40

350

100

250

125

keramik granit
60x60

keramik granit
60x60

450

SAHRULI ASMAR, ST, MSi

keramik granit
60x60

250

keramik granit
60x60

SAHRUDIN, S.Ag

keramik granit
60x60

1300

keramik granit
60x60

200

400

1300

350

TERAS
-0.05

DRS. SUDIRMAN, S.ST, MSI

Drs. H. M. AMIN M., M.HI

TEMPAT WUDHU

150

CV. ORIENT ENGINEERING

keramik
40x40
Ir. ABD. BASIT AMIR

125

100

450

keramik granit
60x60

keramik granit
60x60

200

450

125

250

250

350

100

250

1600

RENC. KERAMIK
SKALA 1:100

Tampak Samping Kanan
Tampak Samping KIRI

SAHRULI ASMAR, ST, MSi

40
80

Kalsiboard T: 3,5mm
+4.00

pipa 2''

SAHRUDIN, S.Ag

450
450
230

460

PLIN LANTAI CAT MINYAK
(WARNA HITAM)

PLIN LANTAI CAT MINYAK
(WARNA HITAM)

DRS. SUDIRMAN, S.ST, MSI

MUSOLLAH

30
30

100

80
Drs. H. M. AMIN M., M.HI

200

350
400

DETAIL POT. PLAT TOILET

CV. ORIENT ENGINEERING

DETAIL PIPA
BUANGAN AIR HUJAN

POTONGAN PLAFOND

Ir. ABD. BASIT AMIR

SKALA 1:50
SKALA 1:50

SKALA 1:50

DETAIL
POT. PLAT TOILET
DETAIL PIPA
BUANGAN AIR HUJAN
POTONGAN PLAFOND

SAHRULI ASMAR, ST, MSi

SAHRUDIN, S.Ag

DET.POT A-A

DET.POT B-B

SKALA 1:30

SKALA 1:30

DRS. SUDIRMAN, S.ST, MSI

Drs. H. M. AMIN M., M.HI

CV. ORIENT ENGINEERING

DET.POT C-C

Ir. ABD. BASIT AMIR

SKALA 1:30

SEPTIK TANK
SKALA 1:20

DETAIL SEPTIK TANK

170
20
6
23
6
110
69 81
170

6

40
57

57

70

52

170
SAHRULI ASMAR, ST, MSi

30

TAMPAK S. KANAN

250

SKALA 1:30

DENAH RESEPSIONIS
SKALA 1:30

SAHRUDIN, S.Ag

20

170

DRS. SUDIRMAN, S.ST, MSI

90

90
70
30

29

200
23

23

110
81

69 81

6

CV. ORIENT ENGINEERING

6

6
110

Drs. H. M. AMIN M., M.HI

6

6

110
Ir. ABD. BASIT AMIR

81 69

6
170

55

47

TAMPAK DEPAN
SKALA 1:30

50
250

50

47

TAMPAK S. KIRI
SKALA 1:30

RESEPSIONIS

2000
450

300

500

300

450

KEMENTERIAN AGAMA

KANTOR URUSAN AGAMA (KUA)
KECAMATAN TELLU SIATINGNGE KABUPATEN BONE

A

B

TAMPAK DEPAN
SKALA 1:100

450
60

60

36
SAHRULI ASMAR, ST, MSi

40
150

20
60

50

SAHRUDIN, S.Ag

50

A

DETAIL A

DRS. SUDIRMAN, S.ST, MSI

SKALA
1:50

Drs. H. M. AMIN M., M.HI

CV. ORIENT ENGINEERING
20

500
460

20

KERAMIK 40X40

188
36

KEMENTERIAN AGAMA
40

12

KANTOR URUSAN AGAMA (KUA)

20

Ir. ABD. BASIT AMIR

36

40

15

20

10
KECAMATAN TELLU SIATINGNGE KABUPATEN BONE

60

60
333
364

25

25

565

B

PAGAR DEPAN

DETAIL B
SKALA
1:50

A

B

C

2000
450

300

300

500

450

KEMENTERIAN AGAMA

KANTOR URUSAN AGAMA (KUA)
KECAMATAN TELLU SIATINGNGE KABUPATEN BONE

A

C

B
TAMPAK DEPAN

SAHRULI ASMAR, ST, MSi

SKALA 1:100

SAHRUDIN, S.Ag

55
60

19

25

25

25

15

15

DRS. SUDIRMAN, S.ST, MSI

LOGO KUA

30
150 20
60

30

Pagar Besi

TANAMAN
HIAS

150 20
Pasangan 1/2
Batu Bata

30
SLOF 20/20
Pasangan 1
Batu Bata

60

41
150

Drs. H. M. AMIN M., M.HI

95

CV. ORIENT ENGINEERING
30
80

POTONGAN A-A
SKALA 1:50

POTONGAN B-B
SKALA 1:50

30

Ir. ABD. BASIT AMIR

POTONGAN C-C
SKALA 1:50

DETAIL PAGAR DEPAN

350
112

63

63

112

75
45

45
SAHRULI ASMAR, ST, MSi

70

SAHRUDIN, S.Ag

120

BALAI NIKAH DAN MANASIK HAJI

10

KANTOR URUSAN AGAMA (KUA)

13

KECAMATAN TELLU SIATINGNGE KABUPATEN BONE

10

120

DRS. SUDIRMAN, S.ST, MSI

Drs. H. M. AMIN M., M.HI

187

CV. ORIENT ENGINEERING
236
292
Ir. ABD. BASIT AMIR

DETAIL PAPAN NAMA KANTOR
SKALA 1:100

DETAIL
PAPAN NAMA KANTOR