Studi Aliran Daya Pada Jaringan Distribusi 20 KV Yang Terinterkoneksi Dengan Distributed Generation (Studi Kasus: Penyulang PM.6 GI Pematang Siantar)

DAFTAR PUSTAKA
[1] Viawan, F. A., “Steady State Operation and Control of Power Distribution
Systems in the Presence of Distributed Generation,” Thesis for The Degree of
Licentiate Engineering, Chalmers University of Technology, Goteborg, 2006.
[2] Viawan, F. A., “Voltage Control and Voltage Stability of Power Distribution
Systems in the presence of Distributed Generation,” Thesis for Degree of
Doctor of philosophy, Chalmers University Of Technology, goteborg, 2008.
[3] Arulampalam, G. G, A. dan S. I, “Electrical System of a Grid Connected 2
MW Mini Hydro Power Project at Siripagama,” International Conference on
Small Hydropower, Colombo, 2007.
[4] Marsuidi, D., Operasi Sistem Tenaga Listrik, Jakarta: Graha Ilmu, 2006.
[5] Gonen, T., Electrical Power System Engineering, Sacramento: Mc-Graw
Hill, 1986.
[6] Purchala, K., Belmans, R., K. Leuven, U., Exarchakos, L. dan L. H. A,
“Distributed Generation and The Grid,” Imperial College, London.
[7] Ackermann, T., Andersson, G. dan soder, L., “Distributed Generation: a
Definition,” Royal Institute of Technology, Swiss Federal Institute of
Technology, Stockholm, Zurich, 2001.
[8] Kroposki, B., “DG Power Quality, Protection and Reliability Case Studies,”
New York, 2003.


71
Universitas Sumatera Utara

[9] Jr, W. S. D., Power System analysis, New York: McGraw-Hill, Inc, 1984.
[10] Das. D, Electrical Power Systems, New Delhi: New Age International (P)
Limited, 2006.
[11] Saadat, H.,

Power System Analysis, New Delhi, The McGraw-Hill

Companies.Inc, 1999.
[12] Jusmedy, F., “Studi Aliran Daya Pada Sistem 115 kV PT. Chevron Pacific
Indonesia,” Medan, 2007.
[13] Karim, D. S. A., “Analisis Generator dan Motor Sinkron Sebagai Pembangkit
Daya Reaktif Sitem,” Media Elektrik, vol. 2, no. 2, p. 31, 2007.
[14] K. P. B. Transmisi, Tegangan-tegangan Standar, Jakarta: PT. PLN (Persero),
1995.
[15] Sawai, W. S. Y. M., “Studi Aliran Daya Jawa-Bali 500 kV Tahun 20012011,” Tesis Magister Teknik, Universitas Indonesia, Depok, 2007.

72

Universitas Sumatera Utara

Dokumen yang terkait

Optimasi Penentuan Daya Dan Peletakan Distributed Generation Pada Jaringan Distribusi 20 Kv (Studi Kasus: Penyulang Pm6 Pematang Siantar)

0 4 140

Studi Aliran Daya Pada Jaringan Distribusi 20 KV Yang Terinterkoneksi Dengan Distributed Generation (Studi Kasus: Penyulang PM.6 GI Pematang Siantar)

3 65 110

Optimasi Penentuan Daya Dan Peletakan Distributed Generation Pada Jaringan Distribusi 20 Kv (Studi Kasus: Penyulang Pm6 Pematang Siantar)

1 1 10

Optimasi Penentuan Daya Dan Peletakan Distributed Generation Pada Jaringan Distribusi 20 Kv (Studi Kasus: Penyulang Pm6 Pematang Siantar)

0 1 1

Optimasi Penentuan Daya Dan Peletakan Distributed Generation Pada Jaringan Distribusi 20 Kv (Studi Kasus: Penyulang Pm6 Pematang Siantar)

0 0 4

Optimasi Penentuan Daya Dan Peletakan Distributed Generation Pada Jaringan Distribusi 20 Kv (Studi Kasus: Penyulang Pm6 Pematang Siantar)

0 0 65

Studi Aliran Daya Pada Jaringan Distribusi 20 KV Yang Terinterkoneksi Dengan Distributed Generation (Studi Kasus: Penyulang PM.6 GI Pematang Siantar)

0 1 12

Studi Aliran Daya Pada Jaringan Distribusi 20 KV Yang Terinterkoneksi Dengan Distributed Generation (Studi Kasus: Penyulang PM.6 GI Pematang Siantar)

0 0 1

Studi Aliran Daya Pada Jaringan Distribusi 20 KV Yang Terinterkoneksi Dengan Distributed Generation (Studi Kasus: Penyulang PM.6 GI Pematang Siantar)

0 0 3

Studi Aliran Daya Pada Jaringan Distribusi 20 KV Yang Terinterkoneksi Dengan Distributed Generation (Studi Kasus: Penyulang PM.6 GI Pematang Siantar)

0 0 25