Steam Turbine SST-060 (up to 6 MW)

  LAMPIRAN 1

  LAMPIRAN 2 350kW Caterpillar Diesel Engine Generator Set for sale. Cat XQ 350, 60Hz, 480 Volts, 3 Phase, 7213 Hours. Built in 2000. Just pulled off rental line and is in good running condition. Price $40,000.

STAMFORD 1540 KW

  rp. 233.333.333 Harga: Steam Turbine SST-060 (up to 6 MW) (formerly known as AFA, CFA or CFR series)

   Description Technical Data

   Features Typical Dimensions Service Technical Data Power output up to 6 MW up to 131 bar (a) / 1,900 psi

  Inlet pressure Inlet temperature dry up to 530 °C / 985 °F saturated steam Speed according to driven machine

  Back pressure: up to 29 bar (a) / Exhaust pressure

  420 psi or vacuum BOILER Boiler Type : Water Tube Rated Capacity : 22.700 Kg/Hr from & AT 100 °C Year of Manufacture : 2002 Serial No. : 20410

  2 Design Pressure : 2,5 N/mm

  2 Hydrotest Pressure : 3,75 N/mm Hydrotest No. : KLR 0160571 Model : TW 1G/44 - 5483 Design Code : BS 1113 - 1928

2 Working Pressure : 2,5 N/mm

  Inspection Authority : LLOYDS

  LAMPIRAN 3

Universitas Sumatera Utara

  LAMPIRAN 4 Peta Lokasi SOGE (Sei Ogan Estate) dan SOGM (Sei Ogan Mill) Universitas Sumatera Utara

  

LAMPIRAN 5

OPERASI SISTEM TENAGA LISTRIK DAN ONE LINE DIAGRAM KELISTRIKAN DI PKS SOGM

  

1. TYPICAL ELECTRICAL DISTRIBUTION SYSTEM IN

PALM OIL MILLS

1.1 LAYOUT OF POWER GENERATORS, MAIN SWITCHBOARD, MOTOR CONTROL PANELS AND POWER CABLES Power Supply System In Palm Oil Mill

  BAY Different Parts of Power System (a)

  Generating Sets Comprising Steam, Diesel and Gas Types (Sinar Mas is considering installing Biogas Engine)

  (b) Main Cables

  Linking Generating Sets and Main Switchboard. Commonly used are PVC/PVC Single Core Copper Conductors. Due to flexibility. (c)

  Main Switchboard Comprising Generator Control Boards, Outgoing Distribution Panels, Switching Panels and Capacitor Boards.

  (d) Sub-Main Cables

  Linking Main Switchboards and Sub-Switchboards. Commonly used are 4 Core Armoured Cable or 4 Core Paper Insulated Lead Alloy Sheathed Cable. (e)

  Sub-Switchboard Another name is Motor Control Panel. Starter Boards are located here.

  (f) Loads Comprising Electric Motor, Lighting, Heating, Air-Conditioner, Equipment.

1.2 MAIN SWITCHBOARD

1.2.1 MAIN SWITCHBOARD

  These are attachment of panels to control power intake from generators and power flow to load centres under control conditions. The operations are executed by the use of ACB, MCCB, Protection Equipment, Metering Equipment, Selector Switches, Change-over Switches, P.F. Capacitor Banks, Bus-bars, Cables, etc. The Main Switchboard comprises : (a)

  Generator Control Panel

  (b) Loads Control Panel

  (c) Change-over Panel

  (d) Automatic Power Factor Correction Panel

  (e) Synchronising Panel

  These panels are fabricated from 10 SWG and 12 SWG Sheet Metals for Frame Work and Door/Covers respectively. These sheet metals are first cleansed throughtly, given a phosphate treatment before being painted with two undercoats of zinc chromate. The panels are then painted with two l ayers of enamel orange on the outside and two layers of ‘white’ on the inside.

  1.2.2 GENERATOR CONTROL PANEL

  Each generator control panel comprises : (a)

  1 No. 3 Pole ACB c/w under voltage release and auxiliary contacts (b)

  1 No. 3 Phase Magnetic-Thermal Overload Relays (c)

  1 No. Neutral Knife Switch (d)

  1 No. Earth fault Relay (e)

  1 No. Reverse Power Relay (f)

  1 No. 144 mm Square Voltmeter c/w Voltmeter Selector Switch (g)

  3 Nos. 144 mm Square Ammeter (h)

  1 No. 144 mm Square Kilo-watt (KW) meter (i)

  1 No. Kilo-watt Hour (KWh) meter (j)

  1 No. Hour-run meter (k)

  7 Nos. Measurement Current Transformers (l)

  4 Nos. Protection Current Transformers (m)

  1 No. 1,5 kilo-ohm 3 Watts Voltage Trimmer (n)

  1 No. ‘Raise/Lower’ Governor Control Switch

  (o)

  1 No. 144 mm Square Power Factor Meter (p)

  1 No. Reed Type Frequency Meter (q)

  10 Nos. 20/6A Control Fuse and Fuse Link (r)

  Key Interlock Switch (if required) (s)

  Tinned Copper Bus-bars and cabling

1.2.3 LOADS CONTROL PANEL

  Power flow from these panels are control by : (a)

  Moulded Case Circuit Breaker (MCCB) (b)

  No Fuse Breaker (NFB) (c)

  Fuse Switch (F/S) (d)

  Switch Fuse (S/F) (e)

  Socket Outlet The advantages of MCCB or NFS over F/S and S/F are : (a)

  No change of fuse is necessary (b)

  Re-set when trigger by overload (c)

  Small and compact (d)

  Large ratings can be manufactured Standard Ratings of TPN MCCB are : (a)

30 A

  Overloads are fixed (b)

60 A

  (c) 100 A (d) 225 A (e) 400 A (f) 600 A

  Overloads can be adjusted (g) 800 A

  (h) 1000 A (i) 1250 A

   Power Fuse (to protect capacitor bank)

  6-steps Regulator provide switching up to 6 capacitor banks. 12-step Regulator provide switching up to 12 capacitor banks. (c)

  (b) Electronic Power Factor Regulator is normally available in steps of 6 and 12.

   Indicating Lights (to show no. of steps being switched on)

   Ammeter (measure amperes)

   Measurement Current Transformer (to sense reactive power)

   Electronic Power Factor Regulator (P.F. Controller)

   AC Contractor (to provide switching of capacitor Bank)

  1.2.4 CHANGE-OVER PANEL

   Main Switch (to protect system)

  (a) This comprises :

  1.2.5 AUTOMATIC POWER FACTOR CORRECTION PANEL

  (d) The advantage of this type of design is FLEXIBILITY IN OPERATIONS. (e) At timers KEY INTERLOCK is provided to prevent mal-operation.

  The purpose is to tap power supply from ‘Steam Bus-Bars’ OR ‘Diesel Bus- Bars’.

  This is done by the use of 4 Pole Change-Over Switch and Main Switch (ACB, MCCB, F/S). (c)

  (a) This can also be called Switching Panel. (b)

  Measurement Current Transformer should be installed at location where the total power demand flows through. This is to ensure total correction of all inductive reactive load. (d)

  The time response setting of Power Factor Regulator = (e)

  Example : System has 6 x 65 KVAr Capacitor Banks Measurement Current Transformer use 2000/5A.

  Thus Time Response Setting = = = = 0.1625

  65 2000 / 5 65 x 5 2000

  KVAR CT ratio

  KVAR CT ratio

1.2.6 SYNCHRONISING PANEL

   Selector Switch (to select gen-set to be paralleled)

   Synchronising Light (indicate phase sequence)

   Double Frequency (indicate bus-bar and incoming set frequency)

  (b) Synchronising Panel is require to assist in paralleling of generating sets.

  (c) Paralleling is done at the instance of :

   Equality is voltage

   Equality in frequency

   Equality in phase sequence

   Double Voltmeter (indicate bus-bar and incoming set voltage)

   Synchronoscope (indicate phase sequence)

  (a) This consists of :

   Instrument Fuse (to protect meter and equipment)

  (d) Paralleling of generating sets than the above conditions can cause serious damage to generators, switchgears and meters due to large circulating current.

  11 UVT Under Voltage Trip SACE

  20 OSP Over Speed Protection MULON/OMRON

  19 MCCB Moulded Case Circuit Breaker MITSUBISHI TPN

  18 ACB Air Circuit Breaker SACE TPN Withdrawable Type

  17 KS Knife Switch SOCOMEX

  16 FS Fast/Slow Governor Switch BRETER/BREMAS

  15 VT Voltage Trimmer HERO

  14 VS Volt Selector Switch BRETER/BREMAS

  13 TOR Thermal Overload Relay MITSUBISHI

  12 UVOV Under/Over Voltage Trip ELECTROMATIC SYY 155

  10 OL Overload Relay TAMCO BHI

  Legend and Item Specification

  9 EF Earth Fault Relay ENGLISH ELECTRIC CAG12

  8 HR Hour-run meter BAUSER Hour Counter

  7 KWh Kilowatt-hour meter KRIZIK Unbalance Load

  6 PF Power Factor SACI 144 x 144 mm

  5 RPR Reverse Power Relay CROMPTON Electronic Type

  4 Hz Frequency meter SACI 144 x 144 mm Reed Type

  3 Kw Kilowatt meter SACI 144 x 144 mm Unbalanced Load

  2 V Voltmeter SACI 144 x 144 mm

  

1 A Ammeter SACI 144 x 144 mm & 96 x 96 mm

  Item No. Symbol Description Make/Type

  21 LOP Low Oil Pressure MULON/OMRON

  22 HWT Hot Water Temperature MULON/OMRON

  23 SL Synchronising Light SIEMENS

  24 SYN SCOPE Syncronising Scope SACI

  25 DV Double Voltmeter SACI

  26 DF Double Frequency meter SACI

  27 SS Synchornising Key Switch FANAL

  28 RS Reset Push-button SPRECHER + SHUH (S/S)

  29 PS Parallleling Selector Switch EGA

  30 PFR Power Factor Regulator BELUK

  31 I/L Indicating Light SPRECHER + SCHUH (S/S)

  32 CT Current Transformer NILSEN

  33 FU HRC Fuse NILSEN/FEDERAL

  34 TP Triple Pole -

  35 TPN Triple Pole and Neutral -

  36 Capacitor Bank NOKIA/ESTA