PROYEK PENGEMBANGAN BANDARA INTERNASIONAL AHMAD YANI SEMARANG JALAN PUAD AHMAD YANI SEMARANG - Unika Repository
Laporan Praktik Kerja
PROYEK PENGEMBANGAN BANDARA INTERNASIONAL
AHMAD YANI SEMARANG JALAN PUAD AHMAD YANI
SEMARANG
Disusun Oleh :
Andhika Suryasin Auditya
12.12.0067
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS KATOLIK SOEGIJAPRANATA
SEMARANG
2016
Laporan Praktik Kerja PROYEK PENGEMBANGAN BANDARA INTERNASIONAL AHMAD YANI SEMARANG JALAN PUAD AHMAD YANI SEMARANG Disusun Oleh : Andhika Suryasin Auditya 12.12.0067 PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS KATOLIK SOEGIJAPRANATA SEMARANG 2016 i Jalan Puad Ahmad Yani Semarang
Lembar Pengesahan Praktik Kerja
PROYEK PENGEMBANGAN BANDARA INTERNASIONAL
AHMAD YANI SEMARANG JALAN PUAD AHMAD YANI
SEMARANG
Disusun Oleh :
Andhika Suryasin Auditya
12.12.0044
Telah diperiksa dan setujui, Semarang,……………………………….
Ketua Program Studi Teknik Sipil Dosen Pembimbing Daniel Hartanto. ST., MT Ir. Widija Suseno, MT
Andhika Suryasin Auditya 12.12.0067 ii Teknik Sipil Universitas Katolik Soegijapranata
Jalan Puad Ahmad Yani Semarang
LAMPIRAN KEPUTUSAN REKTOR
UNIVERSITAS KATOLIK SOEGIJAPRANATA
Nomor : 0047/SK.rek/X/2013 Tanggal : 07 Oktober 2013
Tentang : PERNYATAAN KEASLIAN LAPORAN PRAKTIK KERJA PROYEK
PROYEK PENGEMBANGAN BANDARA INTERNASIONAL
AHMAD YANI SEMARANG JALAN PUAD AHMAD YANI
SEMARANG
PERNYATAAN KEASLIAN PRAKTIK KERJA
Dengan ini kami menyatakan bahwa dalam laporan praktik kerja yang berjudul
“Proyek Pengembangan Bandara Ahmad Yani Semarang (PPSRG) Paket-1” ini
tidak terdapat karya yang pernah diajukan untuk memperoleh nilai mata kuliah praktik kerja, dan sepanjang pengetahuan saya juga tidak terdapat karya atau pendapat yang pernah ditulis atau diterbitkan oleh orang lain kecuali yang tertulis diacu dalam naskah ini dan disebutkan dalam daftar pustaka. Apabila dikemudian hari ternyata terbukti bahwa laporan praktik kerja ini sebagian atau seluruhnya hasil plagiasi, maka saya rela untuk dibatalkan, dengan segera akibat hukumnya sesuai peraturan yang berlaku pada Univesitas Katolik Soegijapranata dan/atau peraturan perundang
- – undangan yang berlaku.
Semarang, Andhika Suryasin Auditya
NIM : 12.12.0067
Andhika Suryasin Auditya 12.12.0067 iii Teknik Sipil Universitas Katolik Soegijapranata
Jalan Puad Ahmad Yani Semarang
KATA PENGANTAR
Puji dan syukur saya ucapkan atas kehadirat Tuhan yang Maha Esa, karena berkat- NYA saya dapat menyelesaikan laporan praktik kerja mengenai Proyek Pengembangan Bandara Internasional Ahmad Yani Semarang Jalan Puad Ahmad Yani Semarang dengan konsentrasi Bahan. Laporan praktik kerja ini saya buat guna melengkapi persyaratan praktek kerja dan mempertanggung jawaban selama 90 (Sembilan Puluh) hari kalender kerja. Selain itu, laporan ini dibuat untuk memenuhi penilaian mata kuliah praktik kerja serta sebagai salah satu syarat mengikuti Tugas Akhir (TA).
Saya juga mengucapkan terima kasih kepada pihak
- – pihak yang telah membantu saya dalam proses praktik kerja serta pembuatan laporan ini.
1. PT. Angkasa Pura 1 selaku owner Proyek pengembangan bandara Ahmad Yani Semarang (PPSRG) yang telah mengijinkan saya untuk praktik kerja di proyek ini.
2. Arif Budi Permono ST, MSc Field Coordinator Manejemen Kontruksi yang
- – membimbing saya selama proses praktik kerja berlangsung, serta pengetahuan pengetahuan dari beliau yang disampaikan secara lisan, baik pengetahuan berupa akademik ataupun non akademik (moral).
3. Ir. Widija Suseno, MT selaku dosen pembimbing praktik kerja yang membimbing saya baik selama proses praktik kerja serta penyusunan laporan, serta banyak memberikan masukkan – masukkan untuk saya ketika berada di lokasi proyek. Tak lupa juga, saya mengucapkan banyak terima kasih kepada teman
- – teman saya dan rekan
- – rekan kerja PT Jaya CM yang telah membantu ketika saya berada di lapangan yang tidak dapat saya sebutkan satu persatu.
Mohon maaf bila ada kata
- – kata yang salah atau keliru di dalam laporan pratik kerja ini. Saya sebagai penyusun menyadari masih banyak kekurangan
- – kekurangan dalam hal penyusunan laporan praktik kerja ini, baik dari segi teori, gambar, ataupun infor
- – informasi mengenai Pelaksanaan Proyek Pengembangan Bandara Ahmad
Andhika Suryasin Auditya 12.12.0067 iv Teknik Sipil Universitas Katolik Soegijapranata
Jalan Puad Ahmad Yani Semarang
Yani Semarang (PPSRG) Paket-1. Maka kritik dan saran saya harapkan agar laporan ini menjadi lebih baik lagi.
Hormat Saya, Andhika Suryasin Auditya
NIM : 12.12.0067
Andhika Suryasin Auditya 12.12.0067 v Teknik Sipil Universitas Katolik Soegijapranata
Jalan Puad Ahmad Yani Semarang Andhika Suryasin Auditya 12.12.0067 vi Teknik Sipil Universitas Katolik Soegijapranata
Jalan Puad Ahmad Yani Semarang Andhika Suryasin Auditya 12.12.0067 vii Teknik Sipil Universitas Katolik Soegijapranata
Jalan Puad Ahmad Yani Semarang Andhika Suryasin Auditya 12.12.0067 viii Teknik Sipil Universitas Katolik Soegijapranata
Jalan Puad Ahmad Yani Semarang Andhika Suryasin Auditya 12.12.0067 ix Teknik Sipil Universitas Katolik Soegijapranata
Jalan Puad Ahmad Yani Semarang Andhika Suryasin Auditya 12.12.0067 x Teknik Sipil Universitas Katolik Soegijapranata
Jalan Puad Ahmad Yani Semarang Andhika Suryasin Auditya 12.12.0067 xi Teknik Sipil Universitas Katolik Soegijapranata
Jalan Puad Ahmad Yani Semarang Andhika Suryasin Auditya 12.12.0067 xii Teknik Sipil Universitas Katolik Soegijapranata
Jalan Puad Ahmad Yani Semarang Andhika Suryasin Auditya 12.12.0067 xiii Teknik Sipil Universitas Katolik Soegijapranata
Jalan Puad Ahmad Yani Semarang
DAFTAR ISI
HALAMAN JUDUL ········································································ iHALAMAN PENGESAHAN ····························································· ii SURAT PERNYATAAN ··································································· iii KATA PENGANTAR ······································································ iv KARTU ASISTENSI ······································································· vi
SURAT PERMOHONAN IJIN KERJA PRAKTEK ································ vii
SURAT PERINTAH KERJA ····························································· viii
SURAT BIMBINGAN KERJA PRAKTEK ··········································· ix SURAT KETERANGAN SELESAI KERJA PRAKTEK ·························· x SURAT UCAPAN TERIMA KASIH ··················································· xiDAFTAR ISI ················································································· xii
DAFTAR TABEL ··········································································· xv
DAFTAR GAMBAR ········································································ xvi
DAFTAR LAMPIRAN ····································································· xviii
1.1 Latar Belakang Proyek ························································ 1
1.2 Lokasi Proyek ·································································· 2
1.3 Fungsi Bangunan ······························································ 3
1.4 Data dan Informasi Proyek ··················································· 3
2.1 Organisasi Proyek ····························································· 6
2.2 Pemilik Proyek (Owner) ······················································ 7
2.2.1 Tugas Pemilik Proyek ·················································· 7
2.3 Konsultan ······································································· 8
2.3.1 Konsultan Perencana ··················································· 8
2.3.2 Konsultan Pengawas ··················································· 10
2.4 Kontraktor Pelaksana ························································· 10
2.5 Sub Kontraktor ································································· 10
2.6 Hubungan Kerja Antar Unsur Pengelola Proyek ·························· 12
3.1 Metode Pelaksanaan ··························································· 17
3.1.1 Pekerjaan Struktur Atas / Upper Struckture ························ 18 1)
Pekerjaan Capping Beam ········································· 18 2)
Pekerjaan Leveling Mortar ······································· 19 3)
Pekerjaan Peletakan Elastomer ·································· 20 4)
Pekerjaan Erection Blok Girder ·································· 21 5)
Pekerjaan Balok Diafragma ······································ 22 6)
Pekerjaan Balok Joint Precast ··································· 23 7)
Pekerjaan Slab Deck ··············································· 24
Andhika Suryasin Auditya 12.12.0067 xiv Teknik Sipil Universitas Katolik Soegijapranata
Jalan Puad Ahmad Yani Semarang Andhika Suryasin Auditya 12.12.0067 Teknik Sipil Universitas Katolik Soegijapranata xv
Elastomer ·································································· 47 h. Agregat halus ······························································ 49 i. Agregat Kasar ······························································ 50 j. Air ··········································································· 51 k.
Pengendalian Mutu Beton ·········································· 59 i.
Pengendalian Mutu ······················································ 59 a.
3.5 Pengendalian Proyek ·························································· 59 A.
Keselamtan Kerja ························································· 56 B. Kesehatan Kerja ··························································· 56 C. Kebijakan K3 ······························································ 57
3.4 Keselamtan, Kesehatan Kerja dan Lingkungan ··························· 56 A.
Kayu Phenophilm ························································· 53 n. Paku ········································································· 53 o. Solar ········································································· 54 p. Sika – Antisol E 125 ······················································ 55 q. Kawat Las ·································································· 56
Tahu Beton / Beton decking ············································· 52 l. Bendrat ······································································ 52 m.
Sikadur®-31 CF Normal ················································· 44 e. Precast Balok Girder ····················································· 45 f. Wiremesh ··································································· 46 g.
8) Pekerjaan Plat Lantai / Plat Slab ································· 26
Beton Ready Mix ·························································· 43 c. Sikagrout®-215(New) ···················································· 44 d.
Besi Baja ··································································· 37 b.
3.3 Bahan – Bahan ································································ 36 a.
Mobil Crane ······························································· 36
Concrete Vibrator ························································· 34 h. Concrete Pump Truck ···················································· 34 i. Truck Mixer ································································ 35 j. Dam Truck ································································· 36 k.
Theodolite ································································· 29 b. Mesin Genset ······························································ 30 c. Cutting Wheel ······························································ 30 d. Bar Cutter ·································································· 31 e. Bar Bender ································································· 32 f. Pompa Air ·································································· 33 g.
3.2 Alat – Alat ····································································· 29 a.
9) Pekerjaan Barrier/Parapet ········································ 27
Slump Test ························································· 59 ii. Uji Kuat Tekan ··················································· 60 Jalan Puad Ahmad Yani Semarang iii.
Pelaksanaan Couring ············································ 61 b. Pengendalian Mutu Tulangan Baja ································ 62 i.
Pelaksanaan Uji Kuat Tarik ····································· 62 ii. Opname Tulangan Baja ············································· 64 B. Pengendalian Waktu ···················································· 65 C. Pengendalian Biaya ····················································· 65
3.6 Permasalahan dan Solusi ····················································· 66
1) Keterlambatan Pekerjaan Pengecoran ·································· 66
2) Pembersihan Lantai Kerja yang Kurang ······························· 67
3) Kesalahan Dalam Pembesian ············································ 67