akt biaya naik pangkat poin A (2)
BIAYA YANG DIBEBANKAN
PDP awal
Cost S pulp
Bi. Bl lalu
Bi di+ kan
Penyesuaian
tambahan produk
produk hilang
bbb
bbp
btk
bop
PERHITUNGAN BIAYA
HPP ditransfer
persd akhir:
dr s pulp
bbb
bbp
btk
bop
2,200,000
2,000,000
360,000
680,000
7,300,000
10,350,000
7,000,000
3,000,000
1,000,000.00
BIAYA TOTAL BIAYA /KG
77,300,000
257.67
150,700,000
274.00
228,000,000
268.24
228,000,000
228,000,000
228.00
240.00
9,500,000
12,350,000
7,360,000
3,680,000
32,890,000
260,890,000
10.00
13.00
8.00
4.00
35.00
275.00
750,000
275.00
200,000
200,000
200,000
170,000
170,000
240.00
10.00
13.00
8.00
4.00
UE
300,000
550,000
850,000
1,000,000
950,000
950,000
950,000
920,000
920,000
206,250,000
48,000,000
2,000,000
2,600,000
1,360,000
680,000
PDP awal
Cost S pulp
Bi. Bl lalu
Bi di+ kan
Penyesuaian
tambahan produk
produk hilang
bbb
bbp
btk
bop
PERHITUNGAN BIAYA
HPP ditransfer
persd akhir:
dr s pulp
bbb
bbp
btk
bop
2,200,000
2,000,000
360,000
680,000
7,300,000
10,350,000
7,000,000
3,000,000
1,000,000.00
BIAYA TOTAL BIAYA /KG
77,300,000
257.67
150,700,000
274.00
228,000,000
268.24
228,000,000
228,000,000
228.00
240.00
9,500,000
12,350,000
7,360,000
3,680,000
32,890,000
260,890,000
10.00
13.00
8.00
4.00
35.00
275.00
750,000
275.00
200,000
200,000
200,000
170,000
170,000
240.00
10.00
13.00
8.00
4.00
UE
300,000
550,000
850,000
1,000,000
950,000
950,000
950,000
920,000
920,000
206,250,000
48,000,000
2,000,000
2,600,000
1,360,000
680,000