PENYUSUNAN SCHEDULE PERAWATAN SEPEDA MOTOR HONDA SUPRA X 125 SUB-ASSEMBLY KOPLING BERBASIS RELIABILITY CENTERED MAINTENANCE (RCM) - Diponegoro University | Institutional Repository (UNDIP-IR)
UNIVERSITAS DIPONEGORO
PENYUSUNAN SCHEDULE PERAWATAN
SEPEDA MOTOR HONDA SUPRA X 125 SUB-ASSEMBLY KOPLING
BERBASIS RELIABILITY CENTERED MAINTENANCE (RCM)
TUGAS AKHIR
DISUSUN OLEH :
DEDY FRIANTO
L2E 605 213
FAKULTAS TEKNIK
JURUSAN TEKNIK MESIN
SEMARANG
SEPTEMBER 2011
i
PENYUSUNAN SCHEDULE PERAWATAN
SEPEDA MOTOR HONDA SUPRA X 125 SUB-ASSEMBLY KOPLING
BERBASIS RELIABILITY CENTERED MAINTENANCE (RCM)
TUGAS AKHIR
DISUSUN OLEH :
DEDY FRIANTO
L2E 605 213
FAKULTAS TEKNIK
JURUSAN TEKNIK MESIN
SEMARANG
SEPTEMBER 2011
i