Outline of Loan Agreement

  

TABLE OF CONTENTS

CHAPTER 1.

  2.4.5 Package 8 (Sentiong Pumping Station) ................................................................................................................................ 26

  

2.3 Major Activities of the Consultant .......................................................................................................................... 14

  2.3.1 Consultant Head Office and Site Offices .............................................................................................................................. 14

  2.3.2 Mobilization of Consultant Personnel ................................................................................................................................... 14

  2.3.3 Reporting .................................................................................................................................................................................. 18

  2.3.4 Cost of Consulting Services ................................................................................................................................................... 18

  

2.4 Construction Supervision Activities ...................................................................................................................... 18

  2.4.1 Quality Assurance/Quality Control ........................................................................................................................................ 19

  2.4.2 Site Activities of Package 6 .................................................................................................................................................... 22

  2.4.3 Dredging Work ......................................................................................................................................................................... 24

  2.4.4 Mechanical / Electrical Works ................................................................................................................................................ 26

  

2.5 Non-construction Supervision Activities .............................................................................................................. 26

  2.2.5 Project Implementation Units (PIUs) ..................................................................................................................................... 13

  2.5.1 Environment Management and Monitoring .......................................................................................................................... 26

  2.5.2 Implementation of Resettlement Plan/ Conflict Resolution ................................................................................................ 28

  2.5.3 Grievance Redness System/Complaint Handling ................................................................................................................ 28

  2.5.4 Procurement............................................................................................................................................................................. 29

  

CHAPTER 3 PROJECT ACTIVITIES AND PROGRESS ....................................................................................................................... 30

  

3.1 General ..................................................................................................................................................................... 30

  

3.2 Main Activities and Progress of Construction Packages .................................................................................... 33

  

3.2.1 Main Activities .......................................................................................................................................................... 33

  

3.2.2 Maintenance Activities in Defects Liability Period (Q4-2017) .............................................................................. 44

  

3.2.3 Physical and Financial Progress ............................................................................................................................ 44

  2.2.6 Construction Supervision Consultant ................................................................................................................................... 13

  2.2.4 Secretariat Central Project Implementation Unit (CPIU)...................................................................................................... 12

   INTRODUCTION ................................................................................................................................................................ 1

  1.5.6 Disposal Sites ............................................................................................................................................................................ 8

  

1.1 Outline of Loan Agreement ....................................................................................................................................... 1

  

1.2 Project Location ......................................................................................................................................................... 2

  

1.3 Background of the Project ........................................................................................................................................ 3

  

1.4 Project Objectives ..................................................................................................................................................... 3

  

1.5 Construction Packages ............................................................................................................................................. 4

  1.5.1 Works of Construction Packages ............................................................................................................................................ 6

  1.5.2 Volume of Works ....................................................................................................................................................................... 7

  1.5.3 Dredging Methods ..................................................................................................................................................................... 7

  1.5.4 Transportation Methods ........................................................................................................................................................... 8

  1.5.5 Sequenced Project Implementation ........................................................................................................................................ 8

  

CHAPTER 2. ACTIVITIES OF CONSULTANTS ...................................................................................................................................... 9

  2.2.3 Central Project Implementation Unit (CPIU) ......................................................................................................................... 12

  

2.1 Summary of Consultants Key Activities .................................................................................................................. 9

  2.1.1 Supervision of Works ................................................................................................................................................................ 9

  2.1.2 General Project Management ................................................................................................................................................... 9

  2.1.3 Environmental Management ................................................................................................................................................... 10

  2.1.4 Resettlement Plans (RPs) ....................................................................................................................................................... 10

  2.1.5 Grievance Redress(GR)/Complaint Handling Mechanism (GRM) ...................................................................................... 10

  2.1.6 Others ....................................................................................................................................................................................... 10

  

2.2 Project Organization ................................................................................................................................................ 10

  2.2.1 Project Implementation Arrangement ................................................................................................................................... 10

  2.2.2 Central Project Management Unit (CPMU) ............................................................................................................................ 12

  

CHAPTER 4. ACTIVITIES PLANNED FOR THE NEXT QUARTER ..................................................................................................... 58

CHAPTER 5. ISSUES AND RECOMMENDATIONS .............................................................................................................................. 59

APPENDIX 1. PROJECT PHOTOS .......................................................................................................................................................... 60

  

TABLES

Table 1. 1 Budget Allocation for Component 1 by Executing Agency and Package (in USD) ............................................................................................ 4

Table 1. 2 Budget Allocation for Component 2 (in USD) ......................................................................................................................................................... 5

Table 1. 3 Contract, Loan and APBN/D Sharing by Packages (in million IDR) ..................................................................................................................... 5

Table 1. 4 Floodways, Canals and Retention Basins of Construction Packages under the Project ................................................................................. 6

Table 1. 5 Dredged Volume and Embankment Rehabilitation ................................................................................................................................................ 7

Table 1. 6 Sequencing of Project Construction Works ........................................................................................................................................................... 8

Table 2. 1 Established Consultant Head Office and Site Offices ......................................................................................................................................... 14

Table 2. 2 Consumed Person-Month (December 2017) ......................................................................................................................................................... 14

Table 2.3 Financial Status of the Consultant ........................................................................................................................................................................ 18Table 2.4 Contractors and Construction Status under JUFMP/JEDI ................................................................................................................................. 19Table 2.5 Dredged Volume at Upper Sunter Floodway ........................................................................................................................................................ 24Table 2.6 Volume of Sludge Disposal of each station at West Banjir Canal ..................................................................................................................... 25Table 3.1 Package under Construction ................................................................................................................................................................................. 30Table 3.2 Packages Completed Defect Liability Period....................................................................................................................................................... 30 Table 3. 3 Contract, Loan, and APBN/D Sharing by Package (in IDR) ................................................................................................................................. 30

  

Table 3. 4 Contract Price and Disbursement by Package and Source of Fund (in IDR).................................................................................................... 31

Table 3. 5 Dredging Work up to Q4-2017 ................................................................................................................................................................................ 31

Table 3. 6 Construction Work and Financial Progress, Q4 2017 .......................................................................................................................................... 31

Table 3. 7 Completion Date and Defects Liability Period ...................................................................................................................................................... 44

  

FIGURES

Figure 1.1

  Loan allocation among Executing Agencies .......................................................................................................................................................... 2

Figure 1.2 Budget Allocation for Component 1 of JUFMP (in million USD) .......................................................................................................................... 5 Figure 2. 1 Overall Implementation Arrangement .....................................................................................................................................................................11Figure 3.1 Financial Progress (Q4 2017, billion IDR) ............................................................................................................................................................. 32Figure 3.2 Dredged Material Disposed at CDF Ancol (in thousand m

  3 ), Q4-2017 ............................................................................................................... 32

CHAPTER 1. INTRODUCTION

1.1 Outline of Loan Agreement The outline of loan agreement of the Project is.

  Executing Agency : Directorate General of Water Resources, Ministry of Public Works and Housing Date of Loan Sign : February 17, 2012 Effective Date : 90 days after Loan Signing Closing Date : March 31, 2017

  • – Original Loan Agreement

  Amendment No. 2 to the Loan Agreement The Project consists of the following parts:

  42,400,000 71,100,000 80% (b) Works under Part 1 of the Project for the DGHS Project Sites

  February 28, 2019 – Amendment No.2 Loan Amount : USD 139,640,000

  Total 139,640,000 139,640,000

  (3) Incremental Operating Cost under Part 2(a) of the Project

  Consultant Services, Goods and Non-Consulting Services under 10,100,000 6,800,000 100%

  69,340,000 40,640,000 67% (2)

  17,800,000 17,800,000 80% (c) Works under Part 1 of the Project for the DKI Project Sites

  (1) Works under Part 1 of the Project (a) Works under Part 1 of the Project for the DGWR Project Sites

  

Part 1. Dredging, rehabilitation and flow capacity improvement of selected key floodways, canals and retention

basins.

  Loan Category becomes Category Amount of the Loan Allocated (USD) Expenditures (%) to be financed (inclusive of Taxes) Original Amendment

  (c) Implementation of Resettlement Plans. (d) Establishment and operation of the Grievance Redress System.

  (a) Supporting contracts management, engineering design reviews, construction supervision and technical assistance for implementing the Project, including the Resettlement Policy Framework, Resettlement Plan and the Grievance Redress System. (b) Improving institutional coordination for operation and maintenance of Jakarta’s flood management system, as well as establishing a Flood Management Information System.

  Part 2. Technical assistance for project management, social safeguards and capacity building.

  (c) Construction of a drainage pumping station of approximately forty (40) cubic meters per second capacity within the DGWR Project Sites.

  (a) Dredging and rehabilitation of the Project sites consisting of eleven (11) floodways, with total length of approximately 67.5 kilometers long, and four (4) retention basins, with a total area of approximately 65.1 hectares, which have been identified as priority sections of the Jakarta flood management system in need of urgent rehabilitation and improvement in flow capacity; and transportation and disposal of materials dredged from the Project Sites in Disposal Sites. (b) Rehabilitation and/or construction of approximately 42.2 kilometers of embankments within the Project Sites and replacement or repair of mechanical equipment as necessary.

  (e) Carrying out technical studies and analytical assessment to review the master plan on flood management in Cisadane – Jakarta – Bekasi area.

  • - 300,000 100% (4) Consultants Services, Goods and Non-Consulting Services under
  • - 3,000,000 100%

Figure 1.1 Loan allocation among Executing Agencies RDA

  DKI

  3.0

  40.6 2% 29% DGHS

17.8 DGWR 13%

  78.2 56%

DGWR DGHS RDA DKI

1.2 Project Location

  1.3 Background of the Project

Jakarta is the preeminent urban center of Indonesia. It is the main commercial hub of Indonesia. Regional urbanization

has contributed to making Jakarta one of the largest metropolitan areas in the world. The Special Capital District of Jakarta

  2

(DKI Jakarta)1 covers an area of approximately 650 km with a population of about 9.6 million in 2010, while the population

  2

  2

  2

of Greater Jakarta (covering about 7,300 km ) stood at 27.9 million . Rapid growth and inadequate development of public

services have contributed to a host of problems the most severe of which are manifested in disastrous perennial flooding.

  

Flood management infrastructures in Jakarta. Greater Jakarta is surrounded by several dormant volcanoes whose

slopes form the upstream catchment areas of the 13 major rivers that flow through Jakarta to the Java Sea. The rainy

season begins in late November and ends in early April. Jakarta sits in the lowest lying areas of the basin. Forty percent of

Jakarta lies below sea level, including most of North Jakarta, which is being severely threatened by acute land subsidence.

The basic principle of flood management in Jakarta is to divert peak flows from upstream areas around the core of the city,

directing flows to the East and West of Jakarta via two major flood canals emptying into Jakarta Bay. Within the city, the

macro drainage system consists of 13 rivers and a large number of drainage channels. The macro drainage system can be

divided into several subsystems that are separated by floodgates. In low-lying areas, there are polders, which are protective

systems that utilize retention reservoirs at the lowest point and regulate excess water levels by pumping out of the system.

Poor condition of the system, under-implementation of operations and maintenance (O&M), and inadequate local drainage

management result in rapidly occurring inundations during rainfall conditions.

  

Causes of flood in Jakarta. The overall urbanization trends are central to the causes of Jakarta flooding. This has led to

the deterioration of several critical factors. The encroachment and/or development of critical catchment areas have resulted

in both increased rainwater runoff and lack of natural stormwater retention areas both within the city and in upstream areas

of the catchment. Increased generation and inadequate management of solid waste have contributed to waste choked

canals and floodways, exacerbated by insufficient maintenance resulting in weakening structures and sediment build-up.

  

Some canals are operating at less than a third of their original capacity. Land subsidence continues at increasingly alarming

rates, principally caused by intensive deep groundwater abstraction. Land subsidence results in increased vulnerability to

flooding due to the reduced gravitational capacity to channel storm flows to the sea and an increased risk of tidal flooding.

  

Flood management institutions in Jakarta. Responsibility for the development and management of flood infrastructure in

Jakarta is shared between two central government agencies and the Provincial Government of DKI Jakarta (DKI) i.e. The

Balai Besar Wilayah Sungai Ciliwung - Cisadane (BBWSCC)3 under the Directorate General of Water Resource (DGWR) of

the Ministry of Public Works and Housing (MoPWH); the Directorate General of Human Settlements (DGCK) of the MoPWH;

and DKI, through its provincial public works office (DTA-DKI)4, is responsible for the remaining drains, floodways and

retention basins.

  1.4 Project Objectives

The Project Development Objective (PDO) of the Jakarta Urgent Flood Mitigation Project/Jakarta Emergency Dredging

Initiative (JUFMP/JEDI) is to contribu te to the improvement of the operation and maintenance of priority sections of Jakarta’s flood management system. The PDO will be achieved through: a) Dredging sections of selected key floodways, canals and retention basins to improve their flow capacities, and disposing the dredge material in proper facilities; b) Rehabilitating and constructing embankment in sections of, and repairing or replacing mechanical equipment in,

the same selected key floodways, canals and retention basins to sustain and improve their operations;

c) Establishing institutional coordination between the three responsible agencies to encourage coordinated development, and operations and maintenance (O&M) of Jakarta's flood management system, and

d) Strengthening the capability of the responsible agencies to improve the operations, maintenance and management of Jakarta's flood management system.

  1 Jakarta is officially designated a province with special status as the capital of Indonesia i.e., DKI Jakarta (or ‘Special Capital City District of Jakarta’).

  2 More than double the population of 11.9 million in 1980.

  3 River basin management agency for the Ciliwung and Cisadane rivers, which is a Central Government institution designed to function as a river basin organization.

  

4 And further supported by its sub-dinases (or sub-departments at the municipal level). Administratively, DKI Jakarta is divided into five municipalities (i.e , North Jakarta, South

.

  Jakarta, West Jakarta, East Jakarta and Central Jakarta municipalities) and one regency (i.e., Kepulauan Seribu, a group of small islands located on the Java Sea).

1.5 Construction Packages

  

The ultimate goal is to improve Jakarta’s flood management system and reduce the time and duration of floods by dredging

selected floodways, channels and retention basins and to dispose of the excavated (or dredged) materials at three managed

facilities each being many kilometers from the proposed construction sites. As discussed in other sections of this Inception

Report, there are 13 (thirteen) rivers flowing northwards through Jakarta. These form its macro drainage system. Overtime,

poor operation and maintenance (O&M) and ineffective solid waste management, has resulted in significant sediment

deposition and solid waste build up. Additionally, uncontrolled (intentional) upstream land development has resulted in both

increased surface runoff and lack of natural storm water retention areas due to the alteration of the surface (less forested

areas, more houses and roads, etc.). Effects of climate change has also changed the hydrology of the region resulting in

intense and longer duration downpours at times and shifting of the timing of wet and dry seasons.

This Project will focus on 11 (eleven) channels and 4 (four) retention basins which have been identified as priorities. The

major scope of works under the Project include the following: (i) dredging of floodways, channels, and retention basins and

disposing the excavated material at three separate disposal facilities; (ii) rehabilitating and constructing embankments and

repairing or replacing mechanical equipment on various structures, and (iii) constructing Sentiong pump station

One management concern with respect to this Project will be the development of effective coordination and cooperation of

three separate government authorities. Under Indonesian law, the Ministry of Public Works and Housing Affair (MoPWH),

[through two departments - DGHS and DGWR], and the provincial government of Jakarta, DKI are responsible for managing

different aspects of Jakarta's flood control system. The MoPWH departments are responsible for floodways that cross

provincial boundaries; while the Jakarta Public Works Department (DTA-DKI) is responsible for drains and retention basins

within its boundaries. For this Project, these are the works that are under the three separate authorities: Under MoPWH-DGHS: (i) Tanjungan drain, (ii) Lower Angke drain, and (iii) Cideng-Thamrin drain;

Under MoPWH-DGWR: (i) Cengkareng floodway, (ii) West Banjir canal/floodway, (iii) Lower Sunter floodway; (iv) Upper

Sunter floodway, and (v) Sentiong Pump Station;

Under DPU-DKI: (i) Ciliwung-Gunung Sahari floodway, (ii) Sentiong-Sunter drain (including Ancol canal), (iii) Grogol-

Sekretaris drain, (iv) Pakin-Kali Besar-Jelakeng drain, (v) Krukut-Cideng drain; and (vi) Krukut Lama drain; and

Under DPU-DKI: (i) North Sunter retention basin, (ii) South Sunter retention basin, (iii) East Sunter III retention basin, and

  (iv) Melati retention basin.

  Table 1. 1 Budget Allocation for Component 1 by Executing Agency and Package (in USD) Executing Budget Loan Allocation APBN/D Share Agency/Package (Loan+APBN/D) DTA - Jakarta 60,656,716 40,640,000 20,016,716 Package 1 21,517,910 14,417,000 7,100,910 Package 4 27,555,224 18,462,000 9,093,224 Package 7 11,583,582 7,761,000 3,822,582 DGWR 88,875,000 71,100,000 17,775,000 Package 2A 31,000,000 24,800,000 6,200,000 Package 2B 8,125,000 6,500,000 1,625,000 Package 6 13,875,000 11,100,000 2,775,000 Package 8 35,875,000 28,700,000 7,175,000 DGHS 22,250,000 17,800,000 4,450,000 Package 3 6,717,421 5,373,937 1,343,484 Package 5 15,532,579 12,426,063 3,106,516 Total 171,781,716 129,540,000 42,241,716

Figure 1.2 Budget Allocation for Component 1 of JUFMP (in million USD) Table 1. 2 Budget Allocation for Component 2 (in USD) Items Total Loan IBRD APBD/N Sharing

  Supervision Consultant* 6,800,000 6,800,000 -

  

Incremental Operating Cost under Part 2(a) of the Project 300,000 300,000 -

  • Total Component 2 10,100,000 10,100,000 - Total Project Cost (Comp 1+2) 181,880,716 139,640,000 42,241,716

  Review the Master Plan on Flood Management in Cisadane-Jakarta-Bekasi area 3,000,000 3,000,000

  • ) Originally budget allocation of Supervision Consultant was 10,100,000 USD but 3,000,000 USD allocated for Review the Master Plan on Flood Management in Cisadane-Jakarta-Bekasi Area under Center for Water Resources of Research Development Agency of MPWH.

  Table 1. 3 Contract, Loan and APBN/D Sharing by Packages (in million IDR) Executing Agency/Package Contract Price Loan APBN/D Sharing Prov Gov of DKI 829,021 555,444 273,557 Package 1 276,443 185,217 91,226 Package 4 315,384 211,308 104,077 Package 7 237,194 158,920 78,274

  DG Cipta Karya 258,074 206,459 51,615 Package 3 67,177 53,742 13,435 Package 5 190,897 152,717 38,179

  DG Water Resources* 534,443 427,555 106,889 Package 2A 261,002 208,802 52,200 Package 2B 80,387 64,310 16,077 Package 6 193,054 154,443 38,611

  T OTAL 1,621,539 1,189,458 432,081

  DGWR

  88.9 52% DGHS

  22.3 13% DKI

  60.7 35% Total Budget Allocation for Component 1 = 171.8 (million USD)

  DGWR (20%) + IBRD (80%) DGHS (20%) + IBRD (80%)

  • ) The last package under DG Water Resources, namely Package 8 – Sentiong-Ancol Pump Station is waiting for Pre-qualification.

1.5.1 Works of Construction Packages

  

Dredging and embankment rehabilitation of selected key floodways, canals and retention basins. This component will

support the dredging and rehabilitation of 11 floodways / canals and four retention basins which have been identified as

priority sections of the Jakarta flood management system in need of urgent rehabilitation and improvement in flow capacities.

The 11 floodways / canals are estimated to have a total length of 67.5 km, while the four retention basins estimated to cover

a total area of 65.1 hectares. The main project activities for the dredging and rehabilitation of selected key floodways,

canals and retention basins have been divided into eight works packages. The detailed description of the selected key

floodways, canals and retention basins are provided in Table 1.4 below.

  Table 1. 4 Floodways, Canals and Retention Basins of Construction Packages under the Project Contract Description of Drains (Estimated)

  

Location Coordinates

Note 3 Works Location Note 4 (WGS 84) Area Length (m) Width (m) Package

  2 (m or ha.)

  from 48M 702 674 m E, 931 7919 m S

  2 Ciliwung-Gunung Sahari Drain

  5,100 21.50 171,870 m

  • – 45.90 to 48M 702 501 m E, 932 2469 m S

  1 (DKI)

  Waduk Melati

  48M 701 173m E, 931 4570 m S (2 ,004)(1,260) 4.90 ha from 48M 693 543 mE, 931 7587 m S

  2

  2A (DGWR) Cengkareng Floodway

  7,840 (540) 38.00 490,000 m

  • – 87.00 to 48M 693 748 m E, 932 5466 m S from 48M 709 909 m E, 931 6807 m S

  Note 1

  2

  2B (DGWR) Lower Sunter Floodway

  9,980 20.20 338,320 m

  • – 47.40 to 48M 711 015 m E, 932 4383 m S from 48M 701 462 m E, 931 5022 m S to 48M

  2 3 (DGHS) Cideng Thamrin Drain (Round Road Drain) 3,840 (1,960)

  10.00 55,680 m

  • – 19.00 700 392 m E, 931 7488 m S from 48M 709 909 m E, 931 7153 m S

  16.10 161,240 m

  2 Sentiong-Sunter Drain (including Ancol Canal) 5,950 (400)

  • – 31.20 to 48m 705 163 m E, 932 2503 m S Waduk Sunter Utara (Outlet drain) 48M 706 757 mE, 932 2450 m S (570) 33.00 ha.

  4 (DKI)

  Waduk Sunter Selatan

  48M 706 552 m E, 932 0062 m S 19.20 ha. - - 48M 709 879 m E, 932 2542 mS 8.00 ha. - - Waduk Sunter Timur III from 48M 690 497 m E, 932 4161 m S to 48M

  2 Tanjungan Drain

  600 9.20 10,560 m

  • – 26.00 691 024 m E, 932 4644 m S

  5 (DGHS)

  from 48M 695 478 mE, 931 8801 m S

  2`

  Lower Angke Drain 4,050 31.00 166,050 m

  • – 51.00 to 48M 696 390m E, 932 2730 m S from 48M 696 390m E, 932 2730 m S

  2`

  West Banjir Canal (sea side) 3,060 (590) 33 .00 266,220 m

  • – 41.00

  6 (DGWR) to 48M 695 518 mE, 932 5394 m S Note 1

  2 Upper Sunter Flood way from 48M 709 754 mE, 931 5,150

  15.00 131 ,320 m

  • – 36.00

  21.00 106,920 m

  2 Grogol - Sekretaris Drain from 48M 697 787 m E, 2,970

  • – 51.00

  13.00 108,020 m

  2 Pakin- Kali Besar- Jelakeng from 48M 700 332 m E, 4,910

  • – 31.00

  7 (DKI) Note 2

  2 Krukut Cideng Drain from 48M 700 392 m E, 3,250 15 .00 71,500 m

  • – 29.00

  Note 2

  7.00 62,820 m

  2 Krukut Lama Drain from 48M 701 053 mE, 3,490

  • – 29.00

  8 (DGWR) Sentiong Pumping Station

  48M 705 322 m E, 932 2657 m S

  2 2,140,520 m

  • Total 67,514 65 ha.

  Note 1 For contracting purposes, the Sunter Floodway has been divided into two sub-packages- Upper Sunter Floodway and Lower Sunter Floodway. Note 2 For contracting purposes, the Krukut Drain has been divided into two sub-packages- Krukut Cideng Drain and Krukut Lama Drain. Note 3 Approximate length, width, area and coordinates may vary without an amendment to this Agreement provided that the variance is within and in accordance with the terms of a Works Contract for which the Bank has issued a no objection letter. Note 4 WGS 84 refers to World Geodetic System 84, a reference coordinate system.

  1.5.2 Volume of Works

Surveys of the selected key floodways, canals and retention basins carried out during project preparation estimated the total

volume of dredge material to be dredged to be about 3.4 million m

  Tanjungan Drain 11,210 983.6 82.4 - - 1,066.0 Lower Angke Drain 418,790 1,344.0 65.6 216.5 - 1,626.1 Aladin - 976.5 47.0 - - 1,023.5 Anak Kali Angke - 387.0 81.5 - - 468.5 Kamal Drain - 568.6 -

  

5 The exact methodology and equipment for dredging will be proposed by the works contractor, subject to the approval of the Supervision Consultant. The bidding document specifies the minimum

parameters to be adhered to by the contractor.

  

The dredging considers the removal of under-water obstacles, such as rubble and piles from old structures or old

embankments, especially under bridges. Also, trunks and branches of trees could be found in the water. All sediment from

  6 .

  5 . The

specifications for dredging works under the project have been prepared to improve on and considering the lessons from

practices during project preparation period. The sediment to be dredged consists mainly of soft soils (silt and clay), mixed

with garbage and various solid waste

  1.5.3 Dredging Methods Dredging and disposal of dredged materials includes excavation, transportation, and disposal of all the sediment

  9.1 - - 352.0

Jelakeng 16,293 1,875.0 312.3 - - 2,187.3

Total 3,046,377 43,977.9 7,866.5 1,589.7 346.0 53,780.1

  92.4 - - 2,096.7 Kali Besar 1,986 265.3 17.3 - - 282.6 Pakin 1,952 342.9

  Grogol Sekretaris Drain 99,374 588.5 1,993.9 - 0.0 2,582.4 Krukut Cideng Drain 22,479 2,214.3 132.6 13.9 0.0 2,360.8 Krukut Lama Drain 10,709 2,004.3

  13.9 0.0 9,861.8

  Package 7 152,793 7,290.3 2,557.6

  

West Banjir Canal 266,061 - - - - -

Upper Sunter Floodway 63,305 - - - - -

  Package 6* 289,366 - - - - -

  51.4 - 620.0

  Package 5 430,000 4,259.7 276.5 267.9 - 4,804.1

  3 (of which about 95,000 m

  Sentiong Sunter Drain 272,911 7,992.4 - 96.0 - 8,088.4

Waduk Sunter Utara - 2,414.0 1,426.5 - - 3,840.5

Waduk Sunter Selatan - 3,250.0 - - - 3,250.0

Waduk Sunter Timur III - 1,419.0 - - - 1,419.0

  Package 4 272,911 15,075.4 1,426.5 96.0 - 16,597.9

  

Cideng Drain 74,476 2,174.2 - - 346.0 2,520.2

  Package 3 74,476 2,174.2 - - 346.0 2,520.2

  

Lower Sunter Floodway 598,589 - 2,481.9 1,124.5 - 3,606.4

  Package 2B 598,589 - 2,481.9 1,124.5 - 3,606.4

  Cengkareng Floodway 1,027,149 8,669.3 1,041.0 87.4 - 9,797.7

  Package 2A 1,027,149 8,669.3 1,041.0 87.4 - 9,797.7

  6.0 - - 1,233.0

  83.0 - - 6,592.0 Ciliwung - Gn. Gunung Sahari 159,862 5,282.0 77.0 - - 5,359.0 Waduk Melati 77,082 1,227.0

  Package 1 236,944 6,509.0

  3 ) CCSP(m) Concrete Wall (m) Stone Masonry Wall (m) Pipe Wall (m) Total (m)

  Table 1. 5 Dredged Volume and Embankment Rehabilitation Package/Site Dredged Volume (m

  3 are estimated to be solid

waste). About 42.2 km of embankments are expected to be rehabilitated or constructed within these floodways, canals and

retention basins. Details of the project achievement to this period summarized in Table 1.5 below.

  6 Solid wastes larger than 30 cm x 30 cm will be separated from the dredge material and disposed of separately.

  

under the bridges and other obstacles including sediment on the embankment will be removed as well. All dredging works

will be executed from the water, except some temporary disposal and the truck loading works.

All equipment used for the removal (excavation) of the sediment must be able to position themselves in the water during

dredging operations with spuds. This is to guarantee that each section of the drains, floodways and waduks are dredged.

Damage of embankments, obstacles or any other assets before, during and after the dredging works will be repaired.

  1.5.4 Transportation Methods

  7 All transport of sediment should avoid leakage or spills and dump trucks should be 100% watertight . Any leakage of the

dump trucks on the truck loading location and along the route to the disposal sites will be cleaned immediately. Each truck

movement, limited to 22.00 pm to 05.00 AM, will be registered. In particular, for disposal at Ancol CDF, this will include daily

reports mentioning type of truck, license plate number, time of truck departure from the loading location, and time of arrival at

the deposit area in Ancol CDF.

  1.5.5 Sequenced Project Implementation

A sequenced implementation design has been adopted as a key implementation risk management mechanism for the

project. Table 1.6 summarized the Phase 1 and Phase 2 sites.

  Table 1. 6 Sequencing of Project Construction Works Sequencing Contract Package and Implementation Responsibility

  1 (DKI-Provincial Government of DKI Jakarta)

  2A (DGWR-Directorate General of Water Resource)

  Phase 1

  2B (DGWR) 3 (DGHS - Directorate General of Human Settlement) 4 (DKI) 5 (DGHS)

  Phase 2

  6 (DGWR) 7 (DKI) 8 (DGWR)

  1.5.6 Disposal Sites

The disposal sites are not financed by the project; however, they are considered an integral part of the project. The

  3

  3

approximately 3.4 million m of sediment material and the approximately 95,000 m of solid waste that will be removed from

the floodways, canals and retention basins that are being dredged by this project will be disposed of in the following manner .

  • Non-Hazardous Sediment Material - will be transported and disposed of at the Ancol Sea Reclamation Works, known as the Ancol confined disposal facility (CDF). The project will not incur any charges for disposing the material at the CDF.
  • Hazardous Sediment Material (if any are found) - will be disposed of at the PPLi Hazardous Waste Facility in Bogor,

8 West Java . Disposal at PPLi is subject to a disposal fee, funding for which is included in the JUFMP dredging contract.

  • Solid Waste - will be transported and disposed of at City of Jakarta's landfill in Bekasi, West Java, known as the Bantar Gebang Landfill. Disposal at Bantar Gebang Landfill is subject to a landfill tipping fee, funding for which is included in the JUFMP dredging contract.

  7 The exact methodology and equipment for transportation will be proposed by the works contractor, subject to the approval of the Supervision Consultant. The bidding document specifies the minimum parameters to be adhered to by the contractor.

  

8 Note that specific proposed method to treat/dispose of any hazardous waste will follow national regulations on hazardous waste treatment and disposal and subject to the approval of the Ministry

of Environment (MoE).

CHAPTER 2. ACTIVITIES OF CONSULTANTS

2.1 Summary of Consultants Key Activities The Consultant has undertaken and conducted the following activities to achieve the above objectives.

  2.1.1 Supervision of Works

Review / check detailed engineering designs and drawings, method statements, specifications, and activity schedules, carry

out additional survey and investigation as required, as well as conduct any revisions deemed necessary and to obtain their

approval by the CPIU and concerned PIUs.

Supervise and monitor the testing of all sections of each project site by the works contractors for hazardous material prior to

dredging works.

  Supervise the implementation of the works, including (but not limited to):