PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN BATAS KOTA SEKAYU – MANGUNJAYA STA 31+850– STA 40+250 PROVINSI SUMATERA SELATAN - POLSRI REPOSITORY

  PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN BATAS KOTA SEKAYU – MANGUNJAYA STA 31+850– STA 40+250

  PROVINSI SUMATERA SELATAN TUGAS AKHIR Dibuat Untuk Memenuhi Syarat Dalam Menyelesaikan Pendidikan

  Diploma IV Jurusan Teknik Sipil Program Studi Perancangan Jalan dan Jembatan

  Oleh: HANA AFIFAH 0610 4011 1343 RIZKY MUZDALIFAH 0610 4011 1355 LEMBAR PENGESAHAN JUDUL PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN BATAS KOTA SEKAYU – MANGUNJAYA STA 31+850 – STA 40+250

  PROVINSI SUMATERA SELATAN Dibuat Untuk Memenuhi Syarat Dalam Menyelesaikan Pendidikan

  Diploma IV Jurusan Teknik Sipil Program Studi Perancangan Jalan dan Jembatan

  Disetujui dan disahkan oleh: Dosen Pembimbing I, Dosen Pembimbing II, Ir. Kosim, M.T. Ir. Yusri Bermawi, M.T.

  NIP. 196210181989031002 NIP.195812181989031001 Ketua di D-IV PJJ, Drs. Suhadi, S.T., M.T.

  NIP. 195909191986031005 PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN BATAS KOTA SEKAYU – MANGUNJAYA

  PROVINSI SUMATERA SELATAN STA 31+850 – STA 40+250

  LAPORAN AKHIR Disetujui oleh Penguji Laporan Akhir

  Jurusan Teknik Sipil Perancangan Jalan dan Jembatan

  Politeknik Negeri Sriwijaya Nama Penguji Tanda Tangan 1. Ir. Yusri Bermawi, M.T.

  NIP.195812181989031001 …………………………..

  2. Ir. Kosim, M.T.

  NIP. 196210181989031002 …………………………..

  PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN BATAS KOTA SEKAYU – MANGUNJAYA

  PROVINSI SUMATERA SELATAN STA 31+850 – STA 40+250

  LAPORAN AKHIR Disetujui oleh Penguji Laporan Akhir

  Jurusan Teknik Sipil Perancangan Jalan dan Jembatan

  Politeknik Negeri Sriwijaya Nama Penguji Tanda Tangan 1. Ir. Yusri Bermawi, M.T.

  NIP.195812181989031001 …………………………..

  2. Ir. Kosim, M.T.

  NIP. 196210181989031002 …………………………..

  “Tinggalkan apa yang menjadi pengganjal di hati, lakukan apa yang kau yakini, sebab semakin kau menjalani, maka akan semakin mengerti bahwa yang paling diyakini adalah yang terbaik buat diri.” Tugas akhir ini dipersembahkan untuk:

  ♪ Allah SWT yang Maha Penyayang, yang selalu memberikanku kesempatan untuk menjadi orang yang lebih baik lagi. ♪ Kedua Orang Tuaku, Abi dan Umi, yang selalu memberikan perhatian, nasihat, dan dukungannya. Adik-adikku, Bia, Ica, Aman, & Dedek. Untuk Bia & Ica, yang udah mau gantiin tugas rumah Unimu ini dan celotehan yang ringan kalian yang bikin fresh lagi. Untuk Aman, udah mau direpotin nganter & jemput ke kampus. Untuk Dedek kecil aku, yang memberikan keceriaan di rumah. Kalian sumber motivasi dan penyemangatku. ♪ Tebong (Tante ku), terima kasih buat dukungan moril dan finansialnya. Kak Aang dan Kak Andra yang selalu bersemangat sehingga memotivasiku untuk lebih baik lagi. ♪ Rizky Muzdalifah, my besties and amazing partner. Terima kasih udah mau partner-an dengan orang yang sering ceroboh, bikin kesel, dan konyol yang gak jelas seperti aku. Alhamdulillah ya kik TA kita selesai, udah selesaaiiii. Anyway hijaunya rumput tetangga itu rumput imitasi sist, haha. ♪ Bapak dan Mamanya Kiki. Mekaseh mama lawan bapak kiki untok doa dukongannye untok Kiki lawan Hana. Mekaseh juge untok cangkang sawitnyo.

  Maaf kalau cangkangnya tak jadi dipakai Pak, Ma.

  ♪ Kak Ardi Yosa Putra dan Kak Rico Fadhana, yang telah membantu dalam pengambilan abu vulkanik, dan pada akhirnya digunakan oleh teman kami. Terima kasih bantuan dan semangatnya kakak- kakak. ♪ Segenap jajaran engineerwati 8 PJJ A, Kiki (lagi), Mayang, Sina, Mbak Na, El,

  Rani, Indah, beserta engineerwan 8 PJJ A, yang telah mewarnai indahnya masa- masa perkuliahan dan perkulian selama 4 tahun ini. Semoga kita semua menjadi orang sukses. Aamiin. ♪ Kak Stephanie (Kak Cece) dan Kak Sabrina, dengan keceriaan dan kelucuan cerita- ceritanya seketika bikin ketawa ngakak. Loyalitas terhadap pimpinan, dedikasi tanpa batas! Haha. Serta Ibu Tika yang membolehkan kami ngerjain TA sambil nonton tv plus ngerumpi di perpus sipil. ♪ Sahabatku, Aan, Suci, Ultri, Nanang & Ganda, para biduan yang gak pernah kehabisan bahan obrolan yang bikin ketawa terus. ♪ My good friend of mine, Michan, Pipit & Nyae, dengan kegajeannya dan hal – hal ajaib yang terjadi setiap meet up. ♪ Kak Fandim, yang udah ngasih inspirasi dan motivasi. Member Trio Topi Kuning

  Musi 2, Chariz & Yuda. Aku hampa tanpa rumpian, martabak alim dan es teh manis di “Rumah Kita”. ♪ Pak Yunus Teknik Mesin dan Pak Agus Teknik Kimia dan Ibu Ana Teknik Kimia

  Polsri. Terima kasih dan Maaf Pak, Bu, kami tak jadi membakar cangkang sawitnya, hehehe. ♪ Tempat ngerjain TA: basecamp Kost-an Kiki, kelas kosong, perpus sipil, perpus pusat, serta tempat nongkrong berkedok ngerjain TA: A&W ps, McD, dan Dunkin

  

“Ya Allah, tidak ada tempat selamat dar i (hukuman-Mu), kecuali dengan ber sandar

kepada-Mu.”

Tugas Akhir ini saya dedikasikan untuk semua yang ter lahir dan ter kasih di

sampingku dan di hadapan Tuhan.

  ® Alhamdulillah, atas izin Allah Tugas Akhir ini dapat selesai. ® Adakalanya ber syukur itu sulit, tapi Mama (Mar yanti) dan Bapak (Gunadi) sangat ber hasil menjadikan ku w anita yang selalu ber syukur ter lahir dar i keduanya. Ter ima kasih. Alhamdulillah. ® Kakak (Roby Hidayat) ter ima kasih untuk setiap r upiah yang kau per juangkan untukku. Adik (Al-Ami Nazelina) ter ima kasih untuk setiap lenjar mie yang kau masakkan didapur . Adik (M. Rafly Pur nomo) ter ima kasih untuk setiap kecupan hangatmu di pagi har i. Alhamdulillah.

  ® Hana Afifah, my best iest par t ner ever , makasih! Walau ser ing mar ahan dan r umput tetangga selalu kelihatan lebih hijau, tapi Tugas Akhir kita tetap jalan sampai akhir mameeen. Alhamdulillah. ® “Seper ti menjadikannya nomor satu sementar a kamu bahkan tak menduduki posisi kedua, ketiga atau bahkan kelima dalam hidupnya.”

  But over all Tugas Akhir ini benar -benar menjadi saksi. , ter ima kasih telah membagi dunia mu dalam degup jantung (tugas akhir ) ku, M. Elbet Soehar to. You ar e gor geous . Alhamdulillah.

  

® Umi dan Abi dar i Hana Afifah (lagi lagi), tar imo kasih nasiaik umi jo abi

selalu baguno buek hana jo kiki. Alhamdulillah.

® Kak Rico Fadhana, maap nian kak e abunyo idak tepakek di aku, tapi tetep

tepakek ole sina samo mayang kok kak w kkw kw . Kak Ikr ima Sabr i, yg ngasih segalo info ttg TA. Mokaseh banyak kak. Kak Stephanie dan kak Shabr ina teman anti per galauan w ahaha. Zenteno, mokaseh dek buku per ker asan nyo. Kak Fandim nasihat dan motivasinya, skalian makasih gambar box culver t nya kak. Alhamdulillah.

® Pak Yunus Teknik Mesin dan Pak Agus Teknik Kimia, mokaseh pak yoh

w alaupun dak jadi galo bahaahah. Alhamdulillah.

® Tempat nongkr ong sekaligus tempat cur i-cur i w aktu tidur selama

penyusunan TA ini, r uang kelas, per pus pusat, per pus sipil, kosan ku sayang

kosan ku usang, McD, Dunkin Donut, A&W. ((((t er har u)))). Alhamdulillah.

® Almamater ku -yang insya Allah selalu dalam l indungan dan ber kah Allah-

yang ku cintai.

  ® Rizky Muzdalifah ®

  

ABSTRAK

  PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA RUAS JALAN BATAS KOTA SEKAYU-MANGUNJAYA

  SUMATERA SELATAN STA 31+850 – 40+250

  Jalan batas Kota Sekayu – Mangunjaya merupakan ruas jalan yang terletak pada Kabupaten Musi Banyuasin Provinsi Sumatera Selatan. Didalam penulisan tugas akhir ini, penulis melakukan perencanaan ulang bagaimana yang baik dalam merencanakan desain geometrik, konstruksi perkerasan lentur, kelas jalan, dan perhitungan anggaran biaya pada ruas jalan Batas Kota Sekayu – Mangunjaya sehingga jalan yang akan dilalui dapat memberikan kenyamanan dan keamanan serta ekonomis bagi pengguna jalan.

  Didalam merencakan desain geometrik jalan raya, hal-hal yang menjadi acuan dalam perencanaan meliputi perhitungan alinyemen horizontal, alinyemen vertikal, kelas jalan serta menetapkan jenis perkerasan yang digunakan.

  Dari hasil perhitungan maka jalan Batas Kota Sekayu – Mangunjaya ini merupakan jalan kelas I dengan kecepatan rencana 60 km/jam, terdapat 2 jalur 2 lajur dengan lebar jalan 2 x 3,5 m dan lebar bahu jalan 2 m. Ruas jalan ini di desain menggunakan 11 buah tikungan yang terdiri dari 7 buah tikungan Spiral Circle Spiral, 2 buah tinkungan Full Circle dan 2 buah tikungan Spiral Spiral dengan tebal perkerasan masing-masing menggunakan Laston AC-WC dengan tebal 7 cm, Laston AC-BC dengan tebal 8 cm, Laston AC-Base dengan tebal 10 cm, lapis pondasi atas menggunakan Agregat kelas A dengan tebal 25 cm dan lapis pondasi bawah menggunakan agregat kelas B dengan tebal 33 cm. Pembangunan ruas jalan ini dilaksanakan dalam waktu 185 hari kerja dengan total biaya Rp. 106.887.400.000,- (Seratus Enam Miliar Delapan Ratus Delapan Puluh Tujuh Juta Empat Ratus Ribu Rupiah).

  

ABSTRACT

  GEOMETRIC AND PLANNING ON ROAD PAVEMENT THICKNESS CITY LIMITS SEKAYU-MANGUNJAYA

  SOUTH SUMATRA STA 31 + 850-40 + 250

  Road boundary Sekayu City - Mangunjaya a road located in the district of Banyuasin, South Sumatera Province. In this thesis, the authors do a good re-planning how to plan a geometric design, flexible pavement construction, road grade, and the calculation of the budget on roads Sekayu City Limits - Mangunjaya so the road to be traversed can provide comfort and security as well as economical for road users.

  In highway geometric design plan, things become a reference in planning include the calculation of horizontal alignment, vertical alignment, road class and specifies the type of pavement used. From the calculation of the path Sekayu City Limits - Mangunjaya is the class I with a speed plan 60 km/hour, there is a 2 lane road 2 lanes with a width of 2 x 3.5 m and 2 m wide road shoulder. This road section is designed to use 11 pieces bend consisting of 7 pieces bend Spiral Spiral Circle, 2 pieces bend Full Circle and Spiral Spiral 2 corner pieces with each pavement thickness using AC-WC Varley with a 7 cm thick, Varley AC-BC with 8 cm thick, Varley AC-Base with 10 cm thick, layers of foundation on using the aggregate class A with a 25 cm thick layer of aggregate subbase using class B with a thickness of 33 cm. Construction of roads is carried out within 185 days of work at a total cost of Rp. 106 887 400 000, - (Six Hundred Billion Eight Hundred Eighty Seven Million Four Hundred Thousand Rupiah).

  Keywords: Planning geometric, pavement, Box culvert, RAB

  Puji dan syukur ke Hadirat Allah SWT, yang telah memberikan Rahmat serta Hidayah-Nya sehingga penulis dapat menyelesaikan Tugas Akhir ini tepat pada waktunya.

  Dalam penulisan Tugas Akhir ini, penulis banyak menemukan hambatan. Oleh karena itu penulis mengucapkan terima kasih yang sebesar-besarnya kepada:

  1. Bapak Rd.Kusumanto,S.T.,M.M., selaku Direktur Politeknik Negeri Sriwijaya.

  2. Bapak Zainuddin Muchtar,S.T.,M.T., selaku Ketua Jurusan Teknik Sipil.

  3. Bapak Drs. Suhadi, M.T. selaku Ketua Program studi Perancangan Jalan dan Jembatan.

  4. Bapak Ir. Kosim, M.T., selaku dosen pembimbing I, yang telah memberikan bimbingan dan pengarahan.

  5. Bapak Ir. Yusri Bermawi, M.T. selaku dosen pembimbing II yang telah memberikan bimbingan dan pengarahan.

  6. Satuan Non Vertikal Tertentu Perencanaan dan Pengawasan Jalan Nasional ( SNVT P2JN), selaku pihak Dinas PU Bina Marga Provinsi Sumatera Selatan, yang telah membantu dalam pengumpulan data-data yang kami perlukan.

  7. Semua pihak yang telah membantu selama penulisan dan semua informasi dan bimbingannya yang sangat berharga sehingga penyusunan proposal Tugas Akhir ini dapat terselesaikan.

  Semoga segala bentuk kebaikan yang diberikan kepada penulis mendapatkan

  DAFTAR ISI Halaman HALAMAN JUDUL ................................................................................... i HALAMAN PENGESAHAN ..................................................................... ii

KATA PENGANTAR ................................................................................. iii

DAFTAR ISI ............................................................................................... v

DAFTAR TABEL ....................................................................................... vii

DAFTAR GAMBAR ................................................................................... viii

BAB I PENDAHULUAN

  1.1 Latar Belakang .................................................................. 1

  1.2 Maksud dan Tujuan ........................................................... 2

  1.3 Pembatasan Masalah .......................................................... 2

  1.4 Metode Pengumpulan Data ................................................ 3

  1.5 Sistematika Penulisan ........................................................ 3

  BAB II TINJAUAN PUSTAKA

  2.1 Perencanaan Geometrik Jalan ............................................ .5

  2.1.1 Data lalu lintas…………...………..………………...5

  2.3.1 Kendaraan rencana…………………………………12

  2.3.2 Kecepatan rencana………………………………....13

  2.3.3 Volume lalu lintas………………………………….14

  2.4 Karakteristik Geometrik.…………………………………..15

  2.4.1 Trase Jalan………………………………………....16

  2.4.2 Penetapan stasiun (stationing)………………….….16

  2.4.3 Penampang memanjang jalan……………………...16

  2.4.4 Penampang melintang……………………………..17

  2.4.5 Jarak pandang……………………………………...17

  2.5 Bagian-bagian Jalan……………………………………….18

  2.5.1 Tanah dasar………………………………………..18

  2.5.2 Lapis pondasi bawah………………………………19

  2.5.3 Lapis pondasi atas…………………………………19

  2.5.4 Lapis permukaan……………………………….….19

  2.6 Alinyemen Horizontal…………………..…………………20

  2.7 Alinyemen Vertikal………………………………………..25

  2.8 Perencanaan Tebal Perkerasan Lentur…………………….31

  2.8.1 Kriteria perancangan……………………………...31

  2.8.2 Penentuan nilai struktur yang diperlukan…………44

  2.9 Bangunan Pelengkap Jalan………………………………..47

  2.10 Rencana Anggaran Biaya (RAB)………………………….54

  

BAB III PERHITUNGAN GEOMETRIK DAN TEBAL PERKERASAN

  3.2.8 Perhitungan Kontrol Overlapping……………….....83

  4.1 Rencana Kerja dan Syarat-syarat (RKS)……………….....142

  4.3 Produksi Kerja Aktual…………………………………….168

  4.2 Perhitungan Kuantitas Pekerjaan…………………………165

  4.1.6 Pelaksanaan pekerjaan……………………………164

  4.1.5 Peraturan bahan yang dipakai…………………….162

  4.1.4 Syarat-syarat teknis……………………………….157

  4.1.3 Syarat-syarat pelaksanaan…………………………153

  4.1.2 Syarat-syarat administrasi…………………………142

  4.1.1 Syarat umum………………………………………142

  3.6.3 Perhitungan pembebanan Box Culvert……………132

  3.2.9 Perhitungan Pelebaran Perkerasan pada Tikungan…85

  3.6.2 Perencanaan dimensi Box Culvert………………...128

  3.6.1 Perencanaan dimensi drainase saluran samping.…120

  3.6 Perencanaan Bangunan Pelengkap………………………..120

  3.5 Perhitungan Tebal Perkerasan……………………………..113

  3.4 Perhitungan Galian dan Timbunan………………………...108

  3.3 Perhitungan Alinyemen Vertikal……………………………95

  3.2.11 Penentuan Titik Stationing………………………….92

  3.2.10 Perhitungan Nilai Kebebasan Samping Jalan………88

  4.4 Perhitungan Koefisien Kerja Alat dan Koefisien Tenaga

Dokumen yang terkait

PERENCANAAN GEOMETRIK DAN PERKERASAN JALAN TOL PANDAAN-MALANG DENGAN JENIS PERKERASAN LENTUR

2 26 6

PENGGUNAAN INTERBLOCK SEBAGAI LAPISAN ULANGOVERLAY PERKERASAN LENTUR JALAN RAYA (KASUS RUAS JALAN LEGUNDI-BUNDER STA 15+800 – 18+800 KABUPATEN GRESIK)

1 0 8

ANALISA FAKTOR PENYEBAB KECELAKAAN LALU LINTAS DI RUAS JALAN SISINGAMANGARAJA (STA 00+000 – STA 10 + 000 ) KOTA MEDAN

0 0 20

PERENCANAAN PERKERASAN LENTUR PADA RUAS JALAN BLITAR – SRENGAT STA 3+450 SAMPAI STA 10+350 DENGAN METODE AASHTO TUGAS AKHIR Untuk memenuhi persyaratan dalam memperoleh Gelar Sarjana (Strata-1) Program Studi Teknik Sipil

0 0 21

PERENCANAAN PENINGKATAN JALAN SIDOARJO - KRIAN (LINK 172) STA 6+650 – 12+100 DENGAN METODE PERKERASAN LENTUR DAN PERKUATAN GEOTEKSTIL TUGAS AKHIR - PERENCANAAN PENINGKATAN JALAN SIDOARJO -KRIAN (LINK 172) STA 6+650 – 12+100 DENGAN METODE PERKERASAN LENTUR

0 0 23

PERBANDINGAN PERKERASAN LENTUR DAN PERKERASAN KAKU TERHADAP BEBAN OPERASIONAL LALU LINTAS DENGAN METODE AASHTO PADA RUAS JALAN KALIANAK STA 0+000 – 5+350 SURABAYA TUGAS AKHIR - PERBANDINGAN PERKERASAN LENTUR DAN PERKERASAN KAKU TERHADAP BEBAN OPERASIONAL

0 1 13

PERENCANAAN PERKERASAN LENTUR DENGAN METODE KONSTRUKSI BERTAHAP PADA RUAS JALAN DURENAN-BANDUNG-BESUKI PADA STA 171+550 – 182+350 DI KABUPATEN TULUNGAGUNG TUGAS AKHIR - PERENCANAAN PERKERASAN LENTUR DENGAN METODE KONSTRUKSI BERTAHAP PADA RUAS JALAN DURENA

0 0 19

PERBANDINGAN KARAKTERISTIK ARUS LALU LINTAS DI RUAS JALAN GUNUNG SARI (STA 2+100 – STA 2+820) KOTA SURABAYA DENGAN MODEL UNDERWOOD DAN MODEL GREENSHIELD TUGAS AKHIR - PERBANDINGAN KARAKTERISTIK ARUS LALU LINTAS DI RUAS JALAN GUNUNG SARI (STA 2+100 – STA 2

0 0 13

PERENCANAAN PERKERASAN LENTUR PADA RUAS JALAN BLITAR - SRENGAT (STA 3+450 - STA 10+520) DENGAN METODE ANALISA KOMPONEN TUGAS AKHIR Untuk memenuhi persyaratan dalam memperoleh Gelar Sarjana (Strata-1) Program Studi Teknik Sipil

0 0 14

ANALISA KEPADATAN ARUS LALU LINTAS PADA RUAS JALAN RAYA MASTRIP STA 2+600 – 3+800 KOTA SURABAYA DENGAN PENDEKATAN LINIER TUGAS AKHIR - ANALISA KEPADATAN ARUS LALU LINTAS PADA RUAS JALAN RAYA MASTRIP STA 2+600 – 3+800 KOTA SURABAYA DENGAN PENDEKATAN LINIER

0 0 20