Welcome to Repositori Universitas Muria Kudus - Repositori Universitas Muria Kudus

  

LAPORAN SKRIPSI

OTOMATISASI METODE MEYERHOF UNTUK MENENTUKAN

DESAIN TIANG PANCANG

Oleh :

JALIL MULYANTO

  

2009-51-028

SKRIPSI DIAJUKAN SEBAGAI SALAH SATU SYARAT UNTUK

MEMPEROLEH GELAR SARJANA KOMPUTER

PROGRAM STUDI TEKNIK INFORMATIKA

FAKULTAS TEKNIK

UNIVERSITAS MURIA KUDUS

  

LAPORAN SKRIPSI

OTOMATISASI METODE MEYERHOF UNTUK MENENTUKAN

DESAIN TIANG PANCANG

Oleh :

JALIL MULYANTO

  

2009-51-028

SKRIPSI DIAJUKAN SEBAGAI SALAH SATU SYARAT UNTUK

MEMPEROLEH GELAR SARJANA KOMPUTER

PROGRAM STUDI TEKNIK INFORMATIKA

FAKULTAS TEKNIK

UNIVERSITAS MURIA KUDUS

  

ABSTRACT

Thesis report entitled "Automated Method for Determining Meyerhoff Piles

Design" has been implemented with the aim to facilitate the civil

engineering consultants in determining the planning and analysis of pile

design or commonly referred to as spikes before the earth is the most

important part of the foundation. The foundation is the lowest part of a

building, which the foundation will sustain the load of the building.

Therefore, to determine the design requires accuracy stake in determining

the inter pole distance and the number of poles in a column that will be

used as the stake will be planted into the soil layer loudest. So that the

foundation will be solid in supporting the existing building thereon.

Application of automation determination the pile design using the

calculation method Mayerhof. This method was chosen because Meyerhoff

method is a method of designing the form of soil bearing capacity of the

pile. This application is designed using Microsoft Visual Studio 2010 and

uses MySQL as the database storage media. The results of the design of

this system is to give the results of calculations to determine the pile design

firm and appropriate to civil engineering consultants.

Keywords: Automation, Mayerhof, Stake, consultants, foundations,

Microsoft Visual Studio, MySQL

  

ABSTRAK

  Laporan skripsi dengan judul “Otomatisasi Metode Meyerhoff Untuk Menentukan

  

Desain Tiang Pancang” telah dilaksanakan dengan tujuan untuk memudahkan

  para konsultan teknik sipil dalam menentukan perencanaan dan analisis desain tiang pancang atau biasa disebut juga dengan paku bumi merupakan bagian terpenting sebelum pondasi. Pondasi adalah bagian terbawah dari sebuah bangunan, dimana pondasi akan menopang beban dari bangunan tersebut. Oleh karena itu untuk menentukan desain tiang pancang memerlukan keakuaratan dalam menentukan jarak atar tiang dan jumlah tiang dalam satu kolom yang akan digunakan karena tiang pancang akan ditanam ke dalam lapisan tanah yang paling keras. Sehingga pondasi tersebut akan kokoh dalam menopang bangunan yang ada diatasnya. Aplikasi otomatisasi penentuan desain tiang pancang ini menggunakan perhitungan dengan metode Mayerhof. Metode ini dipilih karena metode

  

Meyerhoff merupakan suatu bentuk metode yang mendesain daya dukung tanah

  terhadap tiang pancang. Aplikasi ini dirancang dengan menggunakan bahasa pemrograman Microsoft Visual Studio 2010 dan menggunakan MySql sebagai media penyimpanan database. Hasil dari perancangan sistem ini adalah memberikan hasil perhitungan untuk menentukan desain tiang pancang yang kokoh dan sesuai kepada para konsultan teknik sipil.

  Kata Kunci : Otomatisasi, Meyerhoff, Pancang, Konsultan, Pondasi, Microsoft

  Visual Studio, MySql

  Puji syukur kehadirat Allah SWT karena atas Rahmat dan Hidayah-Nya penulis mampu menyelesaikan penyusunan skripsi ini dengan judul “Otomatisasi Metode Meyerhoff Untuk Menentukan Desain Tiang Pancang”.

  Skripsi ini disusun guna melengkapi salah satu persyaratan untuk memperoleh Gelar Kesarjanaan Progam Studi Teknik Informatika Fakultas Teknik Universitas Muria Kudus. Kiranya dalam penyusunan skripsi ini tidak akan terselesaikan dengan baik tanpa bantuan dari berbagai pihak. Untuk itu pada kesempatan ini penulis mengucapkan terima kasih yang sebesar-besarnya, penghargaan yang setinggi-tingginya dan permohonan maaf atas segala kesalahan yang pernah penulis lakukan kepada semua pihak yang telah membantu dalam penyelesaian skripsi ini, terutama kepada :

  1. Bapak Prof. Dr. dr. Sarjadi, Sp. PA (alm) selaku Rektor Universitas Muria Kudus.

  2. Bapak Rochmad Winarso, ST, MT, selaku Dekan Fakultas Teknik Universitas Muria Kudus.

  3. Bapak Ahmad Jazuli, M.Kom, selaku Ketua Program Studi Teknik Informatika Universitas Muria Kudus.

  4. Ibu Endang Supriyati, M.Kom, selaku dosen pembimbing pertama penulis.

  Terima kasih atas waktu, ilmu, saran, semangat, dan nasihat yang ibu berikan selama bimbingan.

  5. Ibu Tutik Khotimah, M.Kom, selaku dosen pembimbing kedua penulis.

  Terima kasih atas waktu, ilmu, saran, semangat, dan nasihat yang ibu berikan selama bimbingan.

  6. Kepada konsutan CV. ERSALAM MAKMUR terima kasih atas waktu, ilmu, saran, semangat, nasihat dan kesabaran yang telah diberikan terima kasih banyak.

  7. Kedua orang tuaku, dan keluarga besarku tercinta Terima kasih atas semangatnya. Do’a restu serta ridho kalian berdua sehingga aku bisa jadi

  8. Keluarga besar Petilasan Project, rini, yoji, dika, wawan, jidoed, dan kustiyono yang selama ini telah member nasehat, semangat, dan motivasi terima kasih banyak.

  9. Semua pihak yang telah membantu penyusunan skripsi ini yang tidak bisa penulis sebutkan satu persatu Penulis menyadari sepenuhnya bahwa dalam penyusunan skripsi ini masih terdapat banyak kekurangan, untuk itu penulis mengharap kritik dan saran dari berbagai pihak untuk sempurnanya sebuah karya tulis. Selain itu penulis juga berharap semoga karya tulis ini dapat memberikan manfaat bagi semua.

  Kudus, 2 Juni 2014 Penulis

  

DAFTAR ISI

  Halaman HALAMAN SAMPUL .................................................................................. i HALAMAN JUDUL ..................................................................................... ii PENGESAHAN STATUS SKRIPSI ............................................................... iii PERNYATAAN PENULIS ........................................................................... iv PERSETUJUAN SKRIPSI ............................................................................ v PENGESAHAN SKRIPSI .............................................................................. vi ABSTRACT ................................................................................................... vii ABSTRAK .................................................................................................... viii KATA PENGANTAR ................................................................................... ix DAFTAR ISI ................................................................................................. x DAFTAR GAMBAR ..................................................................................... xiii DAFTAR TABEL .......................................................................................... xv DAFTAR LAMPIRAN ................................................................................... xvi

  BAB I PENDAHULUAN 1.1. Latar Belakang ....................................................................... 1 1.2. Rumusan Masalah .................................................................. 2 1.3. Batasan Masalah ................................................................... 2 1.4. Tujuan Penelitian ................................................................... 2 1.4.1. Tujuan Umum………………………………………… 2 1.4.2. Tujuan Khusus………………………………………… 3 1.5. Manfaat Penelitian ................................................................. 3 1.5.1. Bagi Progdi ............................................................... 2 1.5.2. Bagi Penulis .............................................................. 3 1.5.3. Bagi Konsultan .......................................................... 3

  BAB II TINJAUAN PUSTAKA 2.1. Penelitian Terkait ..................................................................... 5 2.2. Landasan Teori......................................................................... 6 2.2.1. Pondasi Tiang ........................................................... 5 2.2.2. Macam-Macam Pondasi Tiang.................................... 7 2.2.2.1. Berdasarkan Cara Tiang Meneruskan Beban .......

  7 2.2.2.2. Berdasarkan Bahan Untuk Tiang ........................

  8 2.2.3. Metodologi Prototype ................................................ 11 2.2.4. Meyerhoff .................................................................. 13 2.2.5.

  Flowchart .................................................................. 15 2.2.6. Tools yang digunakan ................................................ 17

  2.2.5.1 Microsoft Visual Studio 2010 ....................... 17

  2.2.5.2 MySQL ......................................................... 17 2.3. Kerangka Pemikiran ................................................................ 18

  BAB III METODE PENELITIHAN 3.1. Study Literatur ........................................................................ 19 3.2. Pengumpulan Data dan Analisa ............................................... 19 3.3. Analisa dan Perancangan sistem .............................................. 19 3.4. Pembangunan Sistem ............................................................... 19 3.5. Pengujian Sistem ...................................................................... 20 3.6. Implementasi Sistem ................................................................ 20 BAB IV ANALISA DAN PERANCANGAN SISTEM 4.1. Gambaran Umum Aplikasi ....................................................... 21 4.2. Analisa Kebutuhan Sistem ...................................................... 21 4.3. Analisa Kebutuhan .................................................................. 22 4.3.1. Analisa Kebutuhan Perangkat Keras ........................... 22 4.3.2. Analisa Kebutuhan Perangkat Lunak .......................... 22

  4.4.2. Struktur Program ........................................................ 24 4.4.3.

  Flowchart Aplikasi ..................................................... 25 4.4.3.1.

  Flowchart Menu Input Tiang ............................. 25 4.4.3.2. Flowchart Input Data Proyek ............................. 26 4.4.3.3. Flowchart Prediksi Kapasitas Dukung Tiang Jika

  Menggunakan CPT/Sondir ................................ 26 4.4.3.4. Flowchart Prediksi Kapasitas Dukung Tiang Jika

  Menggunakan SPT ............................................ 27 4.4.3.5. Flowchart Perhitungan Nilai SPT Untuk Perhitungan

  Q Ujung ............................................................ 28 4.4.3.6. Flowchart Cek Terhadap Kekuatan Bahan Tiang

  Pancang ............................................................. 29 4.4.3.7. Flowchart Jumlah Tiang Yang Dibutuhkan Dalam

  Desain ............................................................... 30 4.4.4. Perancangan Tabel...................................................... 31 4.4.5. Desain Interface .......................................................... 36

  BAB V PEMBAHASAN DAN IMPLEMENTASI SISTEM 5.1. Implementasi Sistem ............................................................... 41

  5.1.1 Menu Utama ................................................................ 41

  5.1.2 Menu Input Jenis Tiang ................................................ 42

  5.1.3 Menu perhitungan Desain ............................................ 42 5.2. Pengujian Sistem ..................................................................... 46 5.3.

  Rekapitulasi Hasil Kuisioner .................................................... 50

  BAB VI PENUTUP 6.1. Kesimpulan ............................................................................ 53 6.2. Saran ....................................................................................... 53

  DAFTAR GAMBAR

Gambar 2.1 Tiang Kayu ............................................................................. 9Gambar 2.2 Tiang Baja ............................................................................... 10Gambar 2.3 Tiang Beton ............................................................................ 11Gambar 2.4 Diagram Metode Protoype........................................................ 12Gambar 2.5 Kerangka Pemikiran ................................................................. 18Gambar 4.1 Struktur Aplikasi ...................................................................... 24Gambar 4.2 Flowchart Menu Input Tiang ................................................... 25Gambar 4.3 Flowchart Input Data Proyek .................................................... 26Gambar 4.4 Flowchart Prediksi Kapasitas Dukung Tiang Jika Menggunakan

  CPT/Sondir .............................................................................. 27

Gambar 4.5 Flowchart Prediksi Kapasitas Dukung Tiang Jika Menggunakan

  SPT .......................................................................................... 28

Gambar 4.6 Flowchart Perhitungan Nilai SPT Untuk Perhitungan Q Ujung . 29Gambar 4.7 Flowchart Cek Terhadap Kekuatan Bahan Tiang Pancang ........ 30Gambar 4.8 Flowchart Jumlah Tiang Yang Dibutuhkan Dalam Desain ........ 31Gambar 4.9 Relasi Tabel ............................................................................. 35Gambar 4.10 Halaman Utama ....................................................................... 36Gambar 4.11 Form Input Jenis Tiang............................................................. 36Gambar 4.12 Form Input Data Lapangan ....................................................... 37Gambar 4.13 Form Prediksi Kapasitas Dukung Tiang Jika Menggunakan

  CPT/Sondir .............................................................................. 37

Gambar 4.14 Form Prediksi Kapasitas Dukung Tiang Jika Menggunakan

  SPT .......................................................................................... 38

Gambar 4.15 Form Perhitungan Nilai SPT Untuk Perhitungan Q Ujung ........ 38Gambar 5.1 Halaman Utama ....................................................................... 41Gambar 5.2 Form Input Jenis Tiang............................................................. 42Gambar 5.3 Form Input Data Proyek ........................................................... 43Gambar 5.4 Form Prediksi Kapasitas Dukung Tiang Jika Menggunakan

  CPT/Sondir .............................................................................. 43

Gambar 5.5 Form Prediksi Kapasitas Dukung Tiang Jika Menggunakan

  SPT .......................................................................................... 44

Gambar 5.6 Form Perhitungan Nilai SPT Untuk Perhitungan Q Ujung ........ 44Gambar 5.7 Form Cek Terhadap Kekuatan Bahan Tiang Pancang ............... 45Gambar 5.8 Form Jumlah Tiang Yang Dibutuhkan Dalam Desain ............... 45Gambar 5.9 Form Hasil Perhitungan ............................................................ 46

  DAFTAR TABEL Tabel 2.1 Simbol Flowchart ...................................................................

  15 Tabel 4.1 Tabel Tiang ............................................................................

  32 Tabel 4.2 Tabel SPT ..............................................................................

  32 Tabel 4.3 Tabel Proyek ..........................................................................

  33 Tabel 4.4 Tabel Jumlah Tiang ................................................................

  33 Tabel 4.5 Tabel CPT/Sondir ..................................................................

  34 Tabel 4.6 Tabel Kekuatan Bahan ...........................................................

  34 Tabel 4.7 Tabel NSPT ...........................................................................

  35 Tabel 5.1 Hasil Pengujian Proses Input Data Tiang Pancang ..................

  47 Tabel 5.2 Hasil Pengujian Proses Proyek ...............................................

  47