POTENSI ENERGI TAHUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) BERDASARKAN SIMULASI WAKTU DI SUNGAI KEDUNG PASANG KABUPATEN PACITAN YEARLY ENERGY POTENTIAL OF MICROHYDRO POWER PLANT (PLTMH) WITH TIME-BASED SIMULATION IN KEDUNG PASANG RIVER, PACITAN

  

POTENSI ENERGI TAHUNAN PEMBANGKIT

LISTRIK TENAGA MIKRO HIDRO (PLTMH)

BERDASARKAN SIMULASI WAKTU

DI SUNGAI KEDUNG PASANG KABUPATEN

PACITAN

YEARLY ENERGY POTENTIAL OF MICROHYDRO POWER

  

PLANT (PLTMH) WITH TIME-BASED SIMULATION IN

KEDUNG PASANG RIVER, PACITAN REGENCY

SKRIPSI

  

Diajukan sebagai Salah Satu Syarat Memperoleh Gelar Sarjana

Pada Program Studi Teknik Sipil Fakultas Teknik

Universitas Sebelas Maret

  

Disusun Oleh :

MUHAMMAD ABI RAFDI

I0113083

PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK

UNIVERSITAS SEBELAS MARET

SURAKARTA

  

2017

  

POTENSI ENERGI TAHUNAN PEMBANGKIT

LISTRIK TENAGA MIKRO HIDRO (PLTMH)

BERDASARKAN SIMULASI WAKTU

DI SUNGAI KEDUNG PASANG KABUPATEN

PACITAN

YEARLY ENERGY POTENTIAL OF MICROHYDRO POWER

  

PLANT (PLTMH) WITH TIME-BASED SIMULATION IN

KEDUNG PASANG RIVER, PACITAN REGENCY

SKRIPSI

  

Diajukan sebagai Salah Satu Syarat Memperoleh Gelar Sarjana

Pada Program Studi Teknik Sipil Fakultas Teknik

Universitas Sebelas Maret

  

Disusun Oleh :

MUHAMMAD ABI RAFDI

I0113083

  Telah disetujui untuk dipertahankan dihadapan Tim Penguji Pendadaran Program Studi Teknik Sipil Fakultas Teknik Universitas Sebelas Maret Surakarta

  Persetujuan : Dosen Pembimbing I, Dosen Pembimbing II, Dr. Ir. Rr. Rintis Hadiani, M.T. Ir. Solichin, M.T.

  NIP. 19630120 198803 2 002 NIP. 19600110 199803 1 002

  PENGESAHAN SKRIPSI POTENSI ENERGI TAHUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) BERDASARKAN SIMULASI WAKTU DI SUNGAI KEDUNG PASANG, KABUPATEN PACITAN (YEARLY ENERGY POTENTIAL OF MICROHYDRO POWER PLANT

(PLTMH) WITH TIME-BASED SIMULATION IN KEDUNG PASANG

RIVER, PACITAN REGENCY)

  Disusun Oleh :

  

MUHAMMAD ABI RAFDI

I0113083

  Telah dipertahankan dihadapan Tim Penguji Pendadaran Program Studi Teknik Sipil Fakultas Teknik Universitas Sebelas Maret Surakarta pada :

  Hari : Tanggal :

  Tim Penguji

  Nama/NIP Tanda Tangan 1. Dr. Ir. Rr. Rintis Hadiani, M.T.

  NIP. 19630120 198803 2 002 ..................................

  2. Ir. Solichin, M.T.

  NIP. 19600110 199803 1 002 ..................................

  3. Ir. Adi Yusuf Muttaqien, M.T.

  NIP. 19581127 198803 1 001 ……………………..

  4. Ir. Koosdaryani Soeryodarundio, M.T.

  NIP. 19541127 198601 2 001 ……………………..

  Disahkan, Tanggal : ........................................ Kepala Program Studi Teknik Sipil Fakultas Teknik UNS

  Wibowo, ST, DEA

  NIP. 19671007 199502 1 001

  

MOTTO

  Lakukan yang terbaik, karena Allah tau apa yang terbaik bagi kita Memang baik menjadi orang penting, tapi lebih penting menjadi orang baik

  Berkarya, bukan berkarir, karena karya yang besar pasti menjadi karir yang tinggi, sedang karir yang tinggi belum tentu menjadi karya yang besar Pendidikan merupakan perlengkapan paling baik untuk hari tua.(Aristoteles)

  Musuh yang berasal dari diri kita yaitu rasa malas dan rasa tidak percaya diri Bekerja dengan jujur dan cerdas, you can do anything, but not everything

  

Real leaders is an ordinary man with extraordinary determination

Finally, take care of your body, it’s the only place you have to live

  

PERSEMBAHAN

Alhamdulillahirabbil’alamin. Sujud syukur saya persembahkan kepada Allah SWT

  

Allah SWT yang mempunyai 99 nama mulia, yang selalu punya rencana indah

  untuk kehidupan, kepada-Mu lah aku memohon perlindungan dan pertolongan,

  

Mama, yang selalu ada disampingku, terima kasih atas perjuangan, dukungan dan

  doanya, jangan pernah berhenti untuk mendoakanku ya Ma,

  

Muhammad Irvan Syah Putra, kakakku, dan Muhammad Arif Ilham

Fadillah, adikku, yang selalu mendukung, dan tempatku memperoleh rasa apa itu

  arti dari persaudaraan dan keluarga

  

Eyang Kakung, Eyang Putri, yang telah membesarkanku, memberikanku

  pendidikan moral atas norma dan kehidupan,

  

Ika Yuliana, terima kasih ya, sudah mendampingiku dan saling mendukung

  selama kuliah, saat bersamamu, takkan pernah terganti dan terbeli dengan apapun, Teman-teman peminatan KBK Keairan yang senantiasa selalu bersama dan saling membantu dari awal pengerjaan hingga selesai, Hannah, Esther, Siti,

  

Riswandha, Sunu dan Diana.

  Teman-teman S1 Teknik Sipil UNS angkatan 2013 yang selalu setia menemani dan membantu, terima kasih atas semua bantuan dan dukungannya selama menjalani perkuliahan. Semua pihak yang selalu mendukung dan memberi semangat dalam penyelesaian Skripsi ini.

  

ABSTRAK

  Muhammad Abi Rafdi, Rintis Hadiani, Solichin, 2017. Potensi Energi Tahunan

  

Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) Berdasarkan Simulasi

Waktu di Sungai Kedung Pasang Kabupaten Pacitan. Skripsi. Program Studi

  Teknik Sipil. Fakultas Teknik. Universitas Sebelas Maret. Surakarta. Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) adalah salah satu sumber energi alternatif yang ramah lingkungan serta relatif mudah untuk direalisasikan. Sejak tahun 1994, di Desa Nawangan, Kabupaten Pacitan terdapat PLTMH yang telah beroperasi, namun energi yang dihasilkan tidak mampu memenuhi kebutuhan pada saat musim kering terjadi, dan komponen PLTMH yang mengalami kerusakan telah menyebabkan penurunan tingkat efisiensi dan keandalan. Untuk mengatasi masalah tersebut akan dikaji ulang perhitungan potensi energi berdasarkan simulasi waktu operasional dan musim.

  Penelitian ini bertujuan untuk mengetahui besarnya potensi energi tahunan PLTMH berdasarkan debit andalan Q80, Q70, Q50 dan Q30, perbedaan potensi energi antara sebelum dan sesudah simulasi waktu serta memperoleh waktu operasi efektif PLTMH. Setelah merekapitulasi data hujan dan menguji konsistensi data hujan dengan metode analisis kurva linier massa ganda, evapotranspirasi dihitung menggunakan software Cropwat, debit sepanjang tahun dihitung dengan metode

  

F.J Mock, kemudian debit andalan dihitung dengan metode Basic Year. Perhitungan

  potensi energi didapatkan dari pengolahan hasil survey kondisi eksisting PLTMH yaitu pengukuran bangunan eksisting serta tinggi jatuh (head) dan kemudian dihitung dengan rumus potensi energi secara fisika. Berdasarkan perhtiungan, diperoleh nilai potensi energi tahunan PLTMH berdasarkan debit andalan Q80, Q70, Q50, dan Q30 berturut-turut sebesar 116342,516 kWh; 121531,367 kWh; 130339,711kWh dan 128310,412 kWh. Setelah potensi energi dihitung menggunakan simulasi waktu operasional, diperoleh nilai potensi energi berturut-turut 92856,543 kWh; 98054,552 kWh; 115669,809 kWh dan 104217,597 kWh.. Sedangkan potensi energi berdasarkan simulasi musim diperoleh 92128,858 kWh; 97770,770 kWh; 105573.01 kWh dan 103134,641 kWh. Untuk waktu operasional efektif PLTMH ditetapkan berdasarkan perhitungan energi dari debit andalan Q80 dengan simulasi waktu operasional yaitu PLTMH aktif pada 15 hari ke 1-13 (1 Januari

  • – 15 Juli) kemudian dinonaktifkan pada 15 hari ke 14-22 (16 Juli-30 November) untuk keperluan maintenance , dan diaktifkan kembali pada 15 hari ke 23-24 (1-31 Desember). Kata kunci : PLTMH, debit andalan, potensi energi, simulasi waktu, waktu operasional, maintenance

  

ABSTRACT

Muhammad Abi Rafdi, Rintis Hadiani, Solichin, 2017 . Yearly Energy Potential Of

Microhydro Power Plant (PLTMH) With Time-Based Simulation In Kedung

Pasang River, Pacitan Regency. Thesis. Civil Engineering Department.

  Engineering Faculty. Sebelas Maret University. Surakarta.

Microhydro Powerplant (PLTMH) is one of many environment friendly energy

source and it is easy to build. Since 1994, in Nawangan Village,, Pacitan regency

there is a microhydro powerplant that was operating but the energy output was

unable to meet the energy needs during dry season, and the powerplant damaged

component has resulted in a decrease both in efficiency and reliability level. To

overcome the problem, will be reviewed the calculation of energy potential based

on simulation of operational time and season.

This study aims to determine the amount of yearly energy potential of microhydro

powerplant based on the dependable discharge of Q80, Q70, Q50, and Q30 and the

energy potential difference between before and after the time-based simulation to

obtain effective operating time of the microhydro powerplant. After the calculation

of the rainfall data and testing the data consistency with double mass liner curve

method, the ervapotranspiration calculated using Cropwat software, then the

yearly discharge were calculated using F.J Mock method. Calculation of energy

potential obtained from the processing of survey results of the microhydro

powerplant existing conditions, such as the existing building measurement and the

falling height (head) and then calculated using physical energy potential formula.

  

Based from the calculation, obtained the value of the microhydro powerplant

energy potential based on the dependable discharge of Q80, Q70, Q50, and Q30

are 116342.516 kWh; 121531.367 kWh; 130339.711kWh and 128310.412 kWh.

After the energy potential is calculated using a simulated operational time,

obtained value of energy potential is 92856.543 kWh; 98054.552 kWh; 115669.809

kWh and 104217.597 kWh.. While the seasonal time-based simulation energy

potential, obtained value of energy potential are 92128.858 kWh; 97770.770 kWh;

105573.01 kWh and 10313.,641 kWh For the effective microhydro powerplant

operational time is set based on the calculation of Q80 dependable discharge,

st th

where the microhydro powerplant is active from 1 of January to 15 of July, then

th th

went deactivated from 16 of July to 30 of November for maintenance and repair,

st st and activated again on 1 to 31 December Keywords : Microhydro powerplant, dependable discharge, energy potential, time-based simulation, maintenance

KATA PENGANTAR

  Puji syukur penyusun panjatkan kepada Tuhan Yang Maha Esa yang telah dengan judul “Potensi Energi Tahunan Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) Berdasarkan Simulasi Waktu di Sungai Kedung Pasang Kabupaten Pacitan ”. Penelitian ini merupakan salah satu persyaratan akademik untuk meraih gelar Sarjana pada Program Studi Teknik Sipil Fakultas Teknik Universitas Sebelas Maret Surakarta. Dalam penyusunan laporan ini, peneliti banyak menerima bantuan dari berbagai pihak, oleh karena itu kami ucapkan terima kasih kepada :

  1. Dr. Ir. Rr. Rintis Hadiani, M.T. selaku dosen pembimbing 1 yang telah memberikan pengarahan selama penyusunan skripsi

  2. Ir. Solichin, M.T. selaku dosen pembimbing 2 yang telah memberikan pengarahan selama penyusunan skripsi

  3. Ir. Sunarmasto, M.T. selaku pembimbing akademik yang telah memberikan saran dan masukan selama proses perkuliahan dan penyusunan skripsi

4. Seluruh rekan-rekan mahasiswa Teknik Sipil UNS 5.

  Seluruh pihak yang tidak dapat kami sebutkan satu persatu yang telah membantu kelancaran tugas kerja hingga terwujudnya laporan ini.

  Penyusun menyadari keterbatasan kemampuan dan pengetahuan yang penyusun miliki sehingga masih ada kekurangan dalam penyusunan skripsi ini, untuk itu penyusun mengharapkan kritik dan saran yang membangun dari para pembaca. Akhir kata semoga skripsi ini bermanfaat bagi penyusun khususnya dan pembaca umumnya.

  Surakarta, September 2017 Penyusun

  

DAFTAR ISI

  JUDUL ..................................................................................................................... i HALAMAN PENGESAHAN ................................................................................ iii MOTTO ................................................................................................................. iv PERSEMBAHAN .................................................................................................... v ABSTRAK ............................................................................................................. vi

  

ABSTRACT ............................................................................................................ vii

  KATA PENGANTAR ......................................................................................... viii DAFTAR ISI .......................................................................................................... ix DAFTAR GAMBAR ............................................................................................ xii DAFTAR TABEL ................................................................................................ xiii DAFTAR NOTASI .............................................................................................. xiv DAFTAR LAMPIRAN ....................................................................................... xvi

  

BAB 1 PENDAHULUAN .................................................................................... 1

1.1. Latar Belakang.................................................................................. 1 1.2. Rumusan Masalah ............................................................................ 2 1.3. Batasan Masalah ............................................................................... 3 1.4. Tujuan Penelitian .............................................................................. 3 1.5. Manfaat Penelitian ............................................................................ 4

BAB 2 TINJAUAN PUSTAKA DAN LANDASAN TEORI ............................ 5

2.1. Tinjauan Pustaka .............................................................................. 5 2.2. Landasan Teori ............................................................................... 11 2.2.1. Analisis dan Pengolahan Data ............................................ 11

  2.2.1.1 Data Survey Lapangan ............................................ 11

  2.2.1.2 Evapotranspirasi ..................................................... 13

  2.2.1.3 Pengisian Data Hujan yang Hilang ......................... 13

  2.2.1.4 Uji Konsistensi Data Hujan .................................... 14

  2.2.1.5 Curah Hujan Wilayah ............................................. 15

  2.2.1.6 Metode F.J Mock .................................................... 15

  2.2.1.7 Debit Andalan ......................................................... 19

  2.2.1.8 Metode Basic Year .................................................. 19 2.2.2. Komponen Bangunan PLTMH ........................................... 20

  2.2.2.1 Bendung .................................................................. 20

  2.2.2.2 Bak Penenang ......................................................... 20

  2.2.2.3 Pipa Pesat (Penstock) .............................................. 20 2.2.3. Perencanaan Kemampuan Tenaga Air................................ 22

  2.2.3.1 Tingg Jatuh (head) .................................................. 22

  2.2.3.2 Daya yang Dapat Dihasilkan .................................. 22 2.2.4. Simulasi Waktu ................................................................... 23

  

BAB 3 METODE PENELITIAN ...................................................................... 24

3.1. Metode Penelitian ........................................................................... 24 3.2. Lokasi Penelitian ............................................................................ 24 3.3. Data yang Dibutuhkan .................................................................... 26 3.4. Alat yang digunakan ....................................................................... 27 3.5. Tahapan Penelitian ......................................................................... 27 3.5.1. Pengumpulan Data .............................................................. 27 3.5.2. Mengisi Data Hujan yang Hilang ....................................... 27 3.5.3. Uji Konsistensi Data Hujan ................................................ 28 3.5.4. Perhitungan Hujan Wilayah ................................................ 28 3.5.5. Perhitungan Evapotranspirasi ............................................. 28 3.5.6. Transformasi Hujan-Debit Metode Mock .......................... 28 3.5.7. Perhitungan Debit Andalan Metode Basic Year Berdasarkan Probabilitas yang Ditentukan ........................ 29 3.5.8. Perhitungan Potensi Energi PLTMH .................................. 29 3.5.9. Penentuan Interval untuk Simulasi Waktu ......................... 30 3.5.10. Perhitungan Potensi Energi berdasarkan Simulasi Waktu ................................................................... 30 3.6. Diagram Alir Penelitian .................................................................. 31

  

BAB 4 ANALISIS DATA DAN PEMBAHASAN ........................................... 33

  4.1. Analisis Data .................................................................................. 33

  4.1.1. Analisis Data Site PLTMH Nawangan ............................... 33

  4.1.1.1 Data Survey ............................................................ 33

  4.1.1.2 Data Pengukuran ..................................................... 33

  4.1.2. Analisis Data Peta Stasiun Hujan dan DAS Grindulu ........ 36

  4.2. Analisis Data Hidrologi .................................................................. 37

  4.2.1. Evapotranspirasi ................................................................. 37

  4.2.2. Data Hujan .......................................................................... 38

  4.2.3. Pengisian Data Hujan yang Hilang ..................................... 40

  4.2.4. Uji Konsistensi Data Hujan ................................................ 41

  4.2.5. Perhitungan Hujan Wilayah ................................................ 42

  4.2.6. Perhitungan Grafik Hubungan Curah Hujan dan Hari Hujan .......................................................................... 43 4.2.7. Perhitungan Transformasi Hujan – Debit dengan

  Metode F.J Mock ................................................................ 44

  4.2.8. Analisis Debit Andalan Metode Basic Year ....................... 48

  4.3. Analisis Potensi Energi Tahunan Berdasarkan Simulasi Waktu .... 52

  4.3.1. Analisis Potensi Energi ....................................................... 52

  4.3.1.1 Perhitungan Komponen Bangunan PLTMH Eksisting ................................................................. 52

  4.3.1.2 Perhitungan Potensi Energi .................................... 54

  4.3.2. Simulasi Waktu ................................................................... 58

  4.3.2.1 Potensi Energi Tahunan Berdasar Simulasi Waktu Operasional ................................................. 58

  4.3.2.2 Potensi Energi Tahunan Berdasar Simulasi Waktu Musim ......................................................... 62

  4.3.3. Penentuan Waktu Operasional PLTMH ............................. 67

  

BAB 5 KESIMPULAN DAN SARAN .............................................................. 68

5.1. Kesimpulan ..................................................................................... 68 5.2. Saran ............................................................................................... 70 DAFTAR PUSTAKA ............................................................................................ 71

  

DAFTAR GAMBAR

Gambar 2.1 Pengukuran beda tinggi dengan metode Tachymetri ................... 12Gambar 3.2 Peta Lokasi Pembangkit Listrik Tenaga Mikro Hidro (PLTMH)

  Nawangan Pacitan ........................................................................ 25

Gambar 3.3 Peta Stasiun Hujan dan DAS pada Listrik Tenaga Mikro Hidro

  (PLTMH) Nawangan Pacitan ....................................................... 25

Gambar 3.4 Lokasi Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) .

  Nawangan Pacitan dengan Google Earth ................................... 26

Gambar 3.5 Diagram Alir Penelitian ............................................................... 32Gambar 4.1 Sketsa Bangunan PLTMH Eksisting ............................................ 34Gambar 4.2 Peta Stasiun Hujan dari Google Earth ......................................... 37Gambar 4.3 Pemetaan DAS Grindulu .............................................................. 37Gambar 4.4 Grafik Uji Konsistensi Data Hujan .............................................. 42Gambar 4.5 Grafik Hubungan Curah Hujan dan Hari Hujan .......................... 43Gambar 4.6 Grafik Debit Andalan Q80 ........................................................... 50Gambar 4.7 Grafik Debit Andalan Q70 ........................................................... 50Gambar 4.8 Grafik Debit Andalan Q50 ........................................................... 51Gambar 4.9 Grafik Debit Andalan Q30 ........................................................... 51Gambar 4.10 Grafik Potensi dan Kebutuhan Energi Debit Q80 ........................ 57Gambar 4.11 Grafik Potensi dan Kebutuhan Energi Debit Q80 dengan

  Simulasi Waktu Operasional........................................................61

Gambar 4.12 Grafik Potensi dan Kebutuhan Energi Debit Q80 dengan

  Simulasi Waktu Musim................................................................65

Gambar 4.13 Perbandingan Grafik Potensi dan Kebutuhan Energi Debit Q80

  Hasil Simulasi Waktu..................................................................66

  

DAFTAR TABEL

Tabel 2.1 Novelty Penelitian Pembangkit Listrik Tenaga Mikro HidroTabel 4.1 Dimensi dan Pengukuran Bendung Eksisting ................................... 33Tabel 4.2 Dimensi dan Pengukuran Bak Penenang Eksisting .......................... 34Tabel 4.3 Dimensi dan Pengukuran Pipa Pesat ................................................ 34Tabel 4.4 Jarak Antar Stasiun Hujan Berpengaruh ........................................... 36Tabel 4.5 Data Evapotranspirasi Harian Tahun 2007 ....................................... 38Tabel 4.6 Data Hujan Harian Stasiun Hujan Nawangan Tahun 2006 .............. 39Tabel 4.7 Data Hujan 15 Harian Stasiun Hujan Nawangan .............................. 40Tabel 4.8 Rekapitulasi Rerata Data Hujan ........................................................ 41Tabel 4.9 Hujan Wilayah Stasiun yang Berpengaruh ....................................... 43Tabel 4.10 Data Parameter DAS Grindulu ......................................................... 44Tabel 4.11 Rekapitulasi Debit Andalan Metode Mock ...................................... 47Tabel 4.12 Kontrol Perhitungan Metode Mock .................................................. 47

  3 Tabel 4.13 Rekapitulasi Debit Andalan Tahunan Metode Mock (m /dt) ........... 48

Tabel 4.14 Debit Andalan Rerata Tahunan yang Telah Diurutkan

  …………….49

Tabel 4.15 Rekapitulasi Perhitungan Potensi Energi Listrik (Q80) ................... 55Tabel 4.16 Rekapitulasi Waktu Operasional PLTMH ........................................ 58Tabel 4.17 Rekapitulasi Perhitungan Potensi Energi Listrik (Q80) dengan

  Simulasi Waktu Operasional.............................................................59

Tabel 4.18 Perbedaan Potensi Energi Tahunan Sebelum dan Sesudah

  Simulasi Waktu Operasional PLTMH .............................................. 61

Tabel 4.19 Curah Hujan 15 Harian Tahun 2006 ................................................. 62Tabel 4.20 Potensi Energi Tahunan berdasarkan Simulasi Waktu Musim ......... 64Tabel 4.21 Perbandingan Potensi Energi Sebelum dan Sesudah Simulasi Waktu

  Musim ............................................................................................... 64

DAFTAR NOTASI

  

Simbol Keterangan Satuan

  2 A Luas

  km

  3 V Volume

  m

  3 Q Debit

  m /dt B Lebar bendung m

  Cd Koefisien debit Yo Tinggi muka air di hulu m

  P Tinggi puncak bendung m S Jarak datar m

  Beda tinggi m

  H i Tinggi alat m

  BA Bacaan benang atas BB Bacaan benang bawah BT Bacaan benang tengah

  o

  m Sudut miring

  o

  z Sudut zenith P x Data hujan yang hilang di stasiun X

  P i Data hujan di stasiun sekitarnya mm L i Jarak stasiun X dengan stasiun sekitarnya km n Jumlah data i Data ke

  CH rerata Curah hujan rerata mm Ri Besarnya CH pada stasiun I mm

  SMC Kelembaban tanah SMC (n) Kelembaban tanah periode ke n

  SMC (n-1) Kelembaban tanah periode n-1

  IS Tampungan awal mm AS Air hujan yang mencapai permukaan tanah

  P Curah hujan bulanan mm Et Evapotranspirasi

  3 V n Volum air tanah periode ke-n m

  k Faktor resesi aliran tanah qt Aliran air tanah pada waktu periode ke t qo Aliran air tanah pada waktu periode ke o

  3 V n-1 Volume air tanah periode ke n-1 m

  3 n Perubahan volume air tanah m

  V hf Head loss mayor m f Koefisien gesekan

  L Panjang pipa m

  D Diameter dalam pipa m v Kecepatan aliran dalam pipa m/dt

  2

  g Percepatan gravitasi m/dt h Head loss minor m K Koefisien resistansi valve

  netto

  H Tinggi jatuh efektif turbin mm H statis Tinggi jatuh bruto turbin mm

  Hf total Tinggi jatuh dari tekananan air yang hilang mm

  3 Qandalan Debit andalan m /dt eff

  H Tinggi jatuh efektif mm H bruto Tinggi jatuh bruto mm

  H losses Tinggi jatuh dari tekanan air yang hilang mm

Dokumen yang terkait

STUDI PERENCANAAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO DI DESA SALIKUNG KABUPATEN TABALONG KALIMANTAN SELATAN

0 17 18

PERENCANAAN PEMBANGKIT LISTRIK TENAGA MIKROHIDRO (PLTMH) SUMBER MARON DUA DESA KARANGSUKO KECAMATAN PAGELARAN KABUPATEN MALANG

6 101 22

STUDI KELAYAKAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) DI SUNGAI ARTER DESA HURUN KECAMATAN PADANG CERMIN KABUPATEN PESAWARAN LAMPUNG (FEASIBILITY STUDY OF MICRO HYDRO POWER PLANT (MHP) ON ARTER RIVER AT HURUN VILLAGE PADANG CERMIN DISTRICT PESAWAR

7 48 65

STUDI POTENSI PEMBANGKIT LISTRIK TENAGA MIKROHIDRO (PLTMH) PADA SALURAN PIPA PDAM WAY SEKAMPUNG DESA BUMIARUM, KECAMATAN PRINGSEWU, KABUPATEN PRINGSEWU (POTENTIAL STUDY OF MICRO HYDRO POWER PLANT (MHP) ON PDAM WAY SEKAMPUNG LINE PIPE AT BUMIARUM VILLAGE,

7 57 75

KAJIAN EKSPERIMENTAL PENGARUH BERAT RODA GILA (FLYWHEEL) TERHADAP UNJUK KERJA TURBIN HELIK UNTUK SISTEM PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH)

8 43 54

PERANCANGAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO DI DESA KAYUNI KABUPATEN FAKFAK PROVINSI PAPUA BARAT

1 3 12

ANALISIS HARMONISA ELECTRONIC LOAD CONTROL (ELC) PADA PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH)

1 4 8

RANCANG BANGUN SISTEM PEMBANGKIT LISTRIK MIKROHIDRO (PLTMH) PADA PIPA SALURAN PEMBUANGAN AIR HUJAN VERTIKAL DESIGN OF MICRO-HYDRO POWER PLANT ON RAINWATER DISPOSAL PIPE

0 0 8

SIMULASI NUMERIK PENGGUNAAN POMPA SEBAGAI TURBIN PADA PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) DENGAN HEAD 9,29 M DAN 5,18 M MENGGUNAKAN PERANGKAT LUNAK CFD PADA PIPA BERDIAMETER 10,16 CM

0 0 14

POTENSI ENERGI ARUS LAUT UNTUK PEMBANGKIT TENAGA LISTRIK DI KAWASAN PESISIR FLORES TIMUR, NTT POTENTIAL ENERGY OF OCEAN CURRENT FOR ELECTRIC POWER GENERATIONIN COASTAL AREAS OF EAST FLORES, NTT

0 0 13