Bidang Perkebunan a. Bibit BahanAlat HARGA

HARGA Rp. 1 2 3 4 5 12 Pancing Gurita Unit 1,523,400 710,900 13 Pancing Kepiting Unit 820,200 382,700 14 Pancing Pari Unit 31,195,200 14,557,700 15 Jaring Luar Trawl untuk KJA Unit 4,716,750 2,201,150 16 Jaring Dalam Sari untuk KJA Unit 1,594,800 744,200 17 Keramba Budidaya Unit 78,281,250 34,531,250 18 Waring Roll 2,268,750 1,058,750 19 Kakaban Buah 353,700 165,000 20 Hapa Unit 585,900 273,400 D T A L I 1 Tali NylonPE : - Ø 2 mm Gulung 146,400 68,300 - Ø 3 mm Gulung 146,400 68,300 - Ø 4 mm Kg 146,400 68,300 - Ø 5 mm Kg 146,400 68,300 - Ø 6 mm Kg 146,400 68,300 - Ø 7 mm Kg 146,400 68,300 - Ø 10 mm Kg 146,400 68,300 - Ø 15 mm Kg 146,400 68,300 - Ø 20 mm Kg 146,400 68,300 2 Tali Rafia Buah 17,800 3,500 3 Tali Pancing Damyl : - Damyl 5 lbs Roll 32,700 15,200 - Damyl 10 lbs Roll 34,950 16,250 - Damyl 15 lbs Roll 34,950 12,450 - Damyl 20 lbs Roll 49,050 22,850 - Damyl 25 lbs Roll 51,450 23,950 - Damyl 30 lbs Roll 56,875 26,875 - Damyl 35 lbs Roll 58,500 27,300 - Damyl 40 lbs Roll 63,150 29,450 - Damyl 100 lbs Roll 32,700 12,300 - Damyl 150 lbs Roll 34,950 13,750 - Damyl 250 lbs Roll 34,950 4 Tali Jangkar 2 Meter 49,050 HARGA Rp. 1 2 3 4 5 E MAKANAN IKAN 1 Pellet Ikan Kg 17,800 3,500 2 Pellet Udang Kg 34,300 6,800 3 Tepung Ikan Kg 46,800 9,300 4 Pupuk Instant Kg 221,000 44,200 5 Kapur Tohor 50 Kg 86,600 17,300 6 Pupuk Kandang 50 Kg 37,500 7,500 7 Dedak Kg 5,300 1,000 8 Pakan Ikan Ikan Rucah Kg 21,800 4,300 9 Hormon Methyl Testosteron Paket 5,553,800 1,110,700 10 Ovaprin Ampul 1,032,700 206,500 11 Pa Net Kg 163,200 32,600 12 Pellet Ikan Crumble Kg 45,200 9,000 13 Arthemia Kaleng 2,103,800 420,700 14 Pakan Induk Ikan Zak 812,500 243,800 15 Pakan Bibit Ikan Zak 1,187,500 575,000 16 Pakan Larva Ikan Zak 375,000 112,500 NO. JENIS BAHAN BARANG JENIS BAHAN BARANG KETERANGAN SATUAN KETERANGAN SATUAN NO. Standar Harga Satuan Upah dan Bahan Kab. Lotim Tahun 2016 35 HARGA Rp. 1 2 3 4 5 F IKAN HIAS 1 Air Laut a. Napolaeon 10 cm Ekor 1,190,600 238,100 b. Triger Kembang 7-10 cm Ekor 226,500 45,300 c. Piyama 10 cm Ekor 498,300 99,600 d. Kepe - kepe : - Jenis Angsa 7 cm Ekor 56,200 11,200 - Jenis Bebek 7 cm Ekor 56,200 11,200 - Jenis Tiker 7 cm Ekor 56,200 11,200 2 Air Tawar a. Arwana10-15 cm - Jenis Silver Ekor 11,343,700 2,268,700 - Jenis Perak Ekor 10,398,300 2,079,600 - Jenis Gold Ekor 28,359,300 5,671,800 b. Lauhan 10-15 cm - Jenis Mutiara Ekor 2,132,700 426,500 - Jenis Gold Ekor 3,046,800 609,300 c. Koi 10-15 cm Ekor 17,015,600 3,403,100 d. Koki Ekor Tiga Super 7 cm Ekor 567,100 113,400 e. Koki Lokal 5-7 cm Ekor 46,800 9,300 HARGA Rp. 1 2 3 4 5 G BAHAN DAN PERALATAN LAIN-LAIN 1 Ressin Kg 48,700 - 2 Mat Kambing Kg 52,500 - 3 Mat Tikar Kg 44,300 - 4 Catalyst Kg 124,300 - 5 Talk Kg 5,000 - 6 Pigmen Biru Kg 128,100 - 7 Pigmen Putih Kg 90,000 - 8 Gelcoat anti lengket Kg 90,600 - 9 Jangkar Buah 2,457,700 491,500 10 Tanda Batas Zona KKLD Unit 17,677,200 3,535,400 11 Corong Penetasan Buah 75,600 - 12 Freezer Unit 63,872,600 12,774,500 13 Filter Back Buah 983,100 - 14 Mesin 5,5 PK Unit 9,375,000 1,875,000 15 Mesin 6,5 PK Unit 11,250,000 11,250,000 16 Kasko Sampan Unit 31,250,000 6,250,000 17 Coolbox 100 Liter Unit 3,906,200 781,200 150 Liter Unit 4,687,500 937,500 200 Liter Unit 5,859,300 1,171,800 250 Liter Unit 6,640,600 1,328,100 600 Liter Unit 12,500,000 2,500,000 18 Kantung Plastik 0.4 mm Pcs 165,600 33,100 19 Busi Mesin Speedboard Bh 75,600 - 20 Kabel ster Speedboard Bh 4,287,500 - 21 Kabel Remote Speedboard 7 m Bh 2,625,000 - 22 Kabel Remote Speedboard 2 m Bh 875,000 - 23 CDI Mesin 60 PK Bh 5,410,600 - 24 Spool 60 PK Bh 2,245,600 - 25 Pack Cop 40 PK Bh 398,100 - 26 Pack Mesin 60 PK Bh 255,000 - KETERANGAN NO. JENIS BAHAN BARANG SATUAN KETERANGAN NO. JENIS BAHAN BARANG SATUAN Standar Harga Satuan Upah dan Bahan Kab. Lotim Tahun 2016 36 HARGA Rp. 1 2 3 4 5 27 Pack Cop 40 PK Bh 387,500 - 28 Pack Mesin 40 PK Bh 254,300 - 29 Cok Bensin 40 PK Bh 224,300 - 30 Cok Bensin 60 PK Bh 224,300 - 31 Accu SpeedBoard Bh 1,225,000 - 32 Kabel Accu Speedboard Bh 306,200 - 33 Jangkar Besi 15 kg Bh 1,020,600 - 34 Tali Jangkar nilon 18 Bh 20,000 - 35 Bambu Dia 8-12 cm Batang 52,500 - 36 Lampu Petromax Buah 566,800 - 37 Peti Pendingin Ikan Unit 8,318,700 - 38 Bambu Petung Batang 312,500 62,500 39 Lacuda Unit 5,468,700 1,093,700 39 GPS Unit 12,031,200 2,406,200 40 Fish Finder Unit 13,125,000 2,625,000 41 Senter Selam Unit 1,750,000 350,000 42 Rumpon Unit 87,500,000 - 43 Rumah Ikan Unit 87,500,000 - 44 Life Jacket Unit 350,000 - 45 Teropong Pengawas Unit 4,062,500 -

7. SATUAN HARGA DINAS PERHUBUNGAN KOMUNIKASI DAN INFORMATIKA

HARGA Rp. 1 2 3 4 5 I Fasilitas Lalu Lintas Jalan 1 Pagar Pengaman Jalan Guard Rail meter 1,950,000 50,000 2 Rambu-Rambu Lalu Lintas : Ukuran 60 x 60 Cm + Tiang Æ 2 x Tinggi 3 meter Buah 1,250,000 125,000 Ukuran 75 x 75 Cm + Tiang Æ 2 x Tinggi 3 meter buah 1,487,000 3 Rambu Pendahulu Penunjuk Jurusan RPPJ : - RPPJ 90 x 120 Cm + Tiang Æ 3 Tinggi 6 meter Buah 2,800,000 8,450,000 - RPPJ 120 x 160 Cm + Tiang Æ 3 Tinggi 6 meter Buah 7,500,000 - RPPJ 105 x 140 Cm + Tiang Æ 3 Tinggi 6 meter Buah 5,650,000 - RPPJ 120 x 240 Cm + Tiang Æ 3 Tinggi 6 meter Buah 13,557,000 4 Lampu Pengatur Lalu Lintas Traffic Lihgt Catu Daya PLN - Simpang Tiga, LED 30 Cm, Catu Daya PLN Unit 243,750,000 - - Simpang Empat, LED 30 Cm, Catu Daya PLN Unit 312,500,000 - - Simpang Tiga, LED 20 Cm, Catu Daya PLN Unit 225,000,000 - - Simpang Empat, LED 20 Cm, Catu Daya PLN Unit 250,000,000 - Catu Daya Sollar Cell - Simpang Tiga, LED 30 Cm, Catu Daya Sollar Cell Unit 350,000,000 37,500,000 - Simpang Empat,LED 30 Cm, Catu Daya Sollar Cell Unit 450,000,000 106,250,000 - Simpang Tiga, LED 20 Cm, Catu Daya Sollar Cell Unit 335,000,000 53,750,000 - Simpang Empat,LED 20 Cm, Catu Daya Sollar Cell Unit 435,000,000 135,000,000 5 Warning Light Catu Daya PLN Warning Light Dua arah 2 Aspek, LED 20 Cm Unit 100,000,000 67,000,000 Warning Light Dua arah 2 Aspek, LED 30 Cm Unit 109,200,000 74,700,000 Catu Daya Sollar Cell Warning Light Dua arah 2 Aspek, LED 20 Cm Unit 130,000,000 89,375,000 Warning Light Dua arah 2 Aspek, LED 30 Cm Unit 130,000,000 85,312,500 6 Marka Jalan Thermoplastik ASTHO 79: - Tebal 3 mm M2 350,000 156,300 NO. JENIS BAHAN BARANG KETERANGAN NO. SATUAN JENIS BAHAN BARANG SATUAN KETERANGAN Standar Harga Satuan Upah dan Bahan Kab. Lotim Tahun 2016 37 HARGA Rp. 1 2 3 4 5 - Tebal 2 mm M2 210,000 53,800 7 Buku Uji Buah 18,700 7,500 8 Plat Uji, Baut dan Kawat Pengaman Set 9,300 5,000 9 Patok Pengaman Jalan Deliniator Buah 742,000 367,000 10 Lampu Penerangan Jalan Umum PJU - LPJU Sollar Cell unit 38,550,000 - LPJU Catu PLN unit 25,000,000 - LPJU Konvensional unit 16,550,000 11 Paku Marka - Paku Marka Ukuran 10 x 10 x 2 buah 390,000 - Paku Marka Ukuran 10 x 12 x 2 buah 400,000 - Paku Marka Bulat buah 290,000 12 Traffic Cone buah 2,583,000 13 Cermin TikunganCekung unit 5,418,000 14 Rompi Turjawali Dishub buah 185,850 15 Rompi Parkir buah 185,850 16 Traffic Control Kecil senter buah 111,720 17 Traffic Control Besar senter buah 125,685 18 GPS buah 7,350,000 19 Light Transmission Meter buah 3,150,000 20 Speed Gun buah 3,491,250 21 Hendy Talky HT + Chargng buah 1,575,000 II Peningkatan Angkutan Penyebrangan 1 Pengerukan Alur Pelayaran M3 37,300 - 2 Pengerukan Kolam Pelabuhan M3 34,500 - III Kapal Fider Fiber Glass 1 Kapal Fiber 20 Penumpang Unit 1,328,250,000 63,250,000 2 Kapal Fiber 35 Penumpang Unit 1,992,375,000 94,875,000 IV Dermaga 1 Causeway M2 5,400,000 929,900 2 Jalan Pelabuhan M2 632,000 1,398,800 3 Lapangan Parkir M2 550,000 1,445,500 4 Lapangan Penumpukan 349,000 5 Lampu Navigasi 2-3 mil M2 12,600,000 6 Lampu Navigasi 3-5 mil M2 19,300,000 7 Beton tiang pancang beton - - Diameter 50 cm, tebal 9 cm, kedalaman 36 M M2 13,100,000 - Diameter 45 cm, tebal 9 cm, kedalaman 36 M M2 11,800,000 8 Beton tiang pancang baja - - Diameter 50 cm, tebal 9 cm, kedalaman 36 M M2 21,500,000 - Diameter 45 cm, tebal 9 cm, kedalaman 36 M M2 19,200,000 8 Life Jacket pelampung buah 241,500 9 Ring Boy Pelampung penyelamat buah 479,156 10 Mesin Tempel Yamaha 15 HP buah 40,437,500 11 Mesin Tempel Yamaha 40 HP buah 52,125,000 12 Mesin Tempel Yamaha 60 HP buah 89,687,500 13 Mesin Tempel Yamaha 85 HP buah 114,250,000 14 Mesin Tempel Yamaha 115 HP buah 151,000,000 15 Mesin Tempel Yamaha 150 HP buah 165,312,500 16 Mesin Tempel Yamaha 200 HP buah 190,000,000 V Fasilitas Laut Keselamatan Pelayaran 1 Sistem Lampu Suar 24 NM Buah 372,488,000 2 Sistem Lampu Suar 20 NM Buah 310,407,000 SATUAN KETERANGAN NO. JENIS BAHAN BARANG Standar Harga Satuan Upah dan Bahan Kab. Lotim Tahun 2016 38 HARGA Rp. 1 2 3 4 5 3 Sistem Lampu Suar18 NM Flashing Lantern Buah 148,995,000 4 Sistem Lampu Suar 12 NM Flashing Lantern Buah 73,374,000 5 Sistem Lampu Suar 6 NM Flashing Lantern Buah 34,145,000 6 Sistem Lampu Suar 20 NM LED Lantern Buah 186,244,000 7 Sistem Lampu Suar 18 NM LED Lantern Buah 167,620,000 8 Sistem Lampu Suar 12 NM LED Lantern Buah 81,948,000 9 Sistem Lampu Suar 6 NM LED Lantern Buah 73,256,000 10 Sistem Lampu Suar 5 NM Self Contained LED Lantern Buah 62,082,000 11 Sistem Lampu Suar 4 NM Self Contained LED Lantern Buah 44,699,000 12 Sistem Lampu Suar 3 NM Self Contained LED Lantern Buah 29,799,000 13 Almunium Lantern House Buah 62,082,000 14 Glvanized Lantern House Buah 49,665,000 15 GRP Lantern House Buah 43,457,000 16 Solar Modul Marine Grade 80 W Buah 12,417,000 17 Solar Modul Marine Grade 40 W Buah 9,933,000 18 Solar Modul Marine Grade 20 W Buah 7,450,000 19 VRLA Sealed Lead Acid Gel Battery 60 AH Buah 3,105,000 20 VRLA Sealed Lead Acid Gel Battery 100 AH Buah 3,725,000 21 VRLA Sealed Lead Acid Gel Battery 200 AH Buah 5,588,000 22 VRLA Absorbent Glss Mate AGM Battery 60 AH Buah 4,345,688 23 VRLA Absorbent Glss Mate AGM Battery 100 AH Buah 5,587,313 24 VRLA Absorbent Glss Mate AGM Battery 200 AH Buah 9,312,188 25 Lantern Mast With Secured Battery Box Small Buah 6,208,125 26 Lantern Mast With Secured Battery Box Medium Buah 9,933,000 27 Lantern Mast With Secured Battery Box Large Buah 14,899,000 28 Lantern Mast With Secured Battery Box Extended Buah 24,832,500 29 Pabrikasi Modular Pipe Beacon 7,5 M Set 93,121,875 30 Pabrikasi Modular Pipe Beacon 10 M Set 111,746,250 31 Pabrikasi Modular Pipe Beacon 15 M Set 155,203,125 32 Lighthouse Power Supply Aton Controller Panel Standar Set 62,081,250 33 Lighthouse Power Supply Aton Controller Panel with remote montoring controller Set 9,312,188 34 Light Beacon Power Supply Aton Controller Panel Standar Set 31,040,625 35 Light Beacon Power Supply Aton Controller Panel with remote monitoring controller Set 62,081,250 36 Lightning Protecton Tower 40 M Set 12,416,250 37 Lightning Protecton Tower 30 M Set 11,174,625 38 Lightning Protecton Tower 20 M Set 9,933,000 39 Lightning Protecton Tower 15 M Set 9,312,188 40 Lightning Protecton Tower 10 M Set 7,449,750 41 Lightning Protecton Tower 7,5 M Set 6,208,125 42 Surge Arrester Modul Set 3,104,063 43 Tetrhedrl Almunium Rader Reflector Set 1,862,438 44 Flourescent Colored Almunium Daymark Set 9,312,188 45 Flourescent Colored Almunium Topmark Set 6,208,125 8 SATUAN HARGA SEWA PERALATAN HARGA Rp. 1 2 3 4 5 1 ASPHALT FINISHER Jam 8,031,400 8,031,400 2 ASPHALT SPRAYER Jam 326,600 326,600 3 BULLDOZER 100-150 HP Jam 591,000 591,000 4 COMPRESSOR 4000-6500 LM Jam 211,500 211,500 NO. KETERANGAN JENIS BAHAN BARANG SATUAN NO. JENIS BAHAN BARANG SATUAN KETERANGAN Standar Harga Satuan Upah dan Bahan Kab. Lotim Tahun 2016 39