PEK. BETON BERTULANG : PEKERJAAN LAIN - LAIN

PEKERJAAN : LANJUTAN PEMBNAGUNAN KANTOR KECAMATAN CIPUTAT HARGA SATUAN JUMLAH Rp. Rp. 1 PEKERJAAN LANTAI 1 I. PEKERJAAN PERSIAPAN : 1 - 1.00 ls 7,500,000.00 7,500,000.00 2 I. 002 1.00 unit 245,284.79 245,284.79 3 - 1.00 ls 5,000,000.00 5,000,000.00 4 - 1.00 ls 3,000,000.00 3,000,000.00 15,745,284.79

II. PEK. BETON BERTULANG :

1 XIX. 170 0.71 m 3 4,585,423.22 3,255,650.49 2 XIX. 170 0.34 m 3 4,585,423.22 1,559,043.90 3 XIX. 167 1.97 m 3 3,907,079.01 7,696,945.65 4 XIX. 167 0.14 m 3 3,907,079.01 546,991.06 5 XIX. 001 30.00 m 2 99,317.93 2,979,537.90 16,038,168.99 III. PEKERJAAN PASANGAN : 1 - 186.83 m 2 125,883.22 23,518,762.72 2 X. 006 373.66 m 2 38,585.52 14,417,866.23 3 XI. 012 347.09 m 2 108,780.76 37,756,713.51 4 XI. 018 15.27 m 2 83,613.26 1,276,774.50 5 XI. 018 1.40 m 2 83,613.26 117,058.57 6 XVII. 001 2.00 bh 2,203,175.75 4,406,351.50 7 XVII. 002 2.00 bh 560,225.08 1,120,450.15 8 Pas. Wastafel Setara HCG XVII. 005 2.00 bh 488,573.52 977,147.04 9 Pas. Urinoir Setara Toto Lengkap XVII. 004 2.00 bh 1,117,470.86 2,234,941.73 10 XVII. 006 1.00 bh 1,581,398.86 1,581,398.86 11 - 4.00 bh 100,000.00 400,000.00 87,807,464.80 IV. PEK.KUSEN,PINTU JENDELA+PLAFOND : 1 - 9.00 Unit 2,868,532.29 25,816,790.65 2 - 2.00 Unit 609,880.54 1,219,761.07 3 - 4.00 Unit 506,000.00 2,024,000.00 4 Pas. Partisi Gypsum t=9 mm Rangka Hollow XII. 028 87.50 m 2 143,770.00 12,579,875.00 5 XII. 027 6.00 m 2 87,974.84 527,849.06 6 - 362.36 m 2 121,488.28 44,022,494.37 7 - 273.60 m 1 27,000.00 7,387,200.00 93,577,970.15 V. TANGGA : 1 XI. 012 23.40 m 2 108,780.76 2,545,469.75 2 XI. 012 4.68 m 2 108,780.76 509,093.95 3 21.00 m 1 450,000.00 9,450,000.00 12,504,563.70 VI. PEKERJAAN INSTALASI LISTRIK AIR : 1 - 2.00 Bh 14,000,000.00 28,000,000.00 2 1.00 ls 36,000,000.00 36,000,000.00 3 XXVII. 001 37.00 ttk 280,663.04 10,384,532.38 4 XXVII. 003 7.00 ttk 282,594.91 1,978,164.37 5 XXVII. 004 6.00 ttk 348,459.72 2,090,758.34 6 - 26.00 bh 100,000.00 2,600,000.00 7 - 24.00 bh 200,000.00 4,800,000.00 8 - 2.00 bh 100,000.00 200,000.00 9 XVII. 023 6.00 bh 48,652.95 291,917.68 10 XVII. 025 4.00 bh 37,922.95 151,691.81 11 XVII. 029 2.00 unit 3,441,253.50 6,882,507.01 12 - 1.00 ttk 8,500,000.00 8,500,000.00 13 - 2.00 bh 3,000,000.00 6,000,000.00 107,879,571.58

VII. PEKERJAAN LAIN - LAIN

1 XVIII. 012 548.66 m 2 28,959.02 15,888,658.11 2 XVIII. 034 368.36 m 2 29,904.43 11,015,595.76 3 XVIII. 034 19.15 m 2 29,904.43 572,669.83 4 - 1.00 bh 3,000,000.00 3,000,000.00 5 - 30.00 hrf 150,000.00 4,500,000.00 6 - 22.00 hrf 225,000.00 4,950,000.00 39,926,923.70 Lambang Daerah Tangerang Selatan Huruf Stainless Steel t=20 cm Huruf Stainless Steel t=30 cm Pek. Septictank uk 2x1.5x1.5 Pek. Pengeboran Sumur + Pompa Listrik Pek. Water Torn 1000 L+ Instalasi Pengecatan Dinding setara ICIDulux Warna Biasa Pengecatan Plafon Setara Metrolith Pengecatan List Plafon Setara Metrolith Pek. Instalasi Stop Kontak AC 3x2.5 mm Eterna Pas. Lampu Neon Phillips TL 40 Watt Pas. Lampu Down Light PL 20 Watt Pas. Lampu Neon Phillips PL 20 Watt Pas. Kran Air Pas. Floor Drain Ø 3 Lokal Pas. Plint Lantai 2040 warna setara Masterina KW I Pas.Hand Railling Tangga Pipa Stainless Steel Ø 2.5 Box Panel Groub Biaya Sambung Listrik PLN 330000 Watt Pek. Instalasi Titik Lampu 2x1.5 mm Eterna Pek. Instalasi Stop Kontak 2x2.5 mm Eterna Kusen pintu P 3 Kusen pintu P 4 Pas. Penutup Plafond GRC t=5 mm Rangka Hollow 20x40 Pas. Penutup Plafond Gypsum=9 mm Rangka Hollow 20x40 Pas. List Profil Plafond Gypsum 7 CM Pas. Keramik 4040 Setara Masterina Warna KWI Pas. Keramik Meja Pantry 2020 CorakWarna Setara Masterina KW I Pas. Closet Duduk Setara HCG Pas. Closet Jongkok Setara Toto Pas. Kitchen Zink lengkap Accessories Pas. Jet Washer Kusen pintu P 1 Pek. Meja Pantry, Beton Ready Mix K-225, Besi = 88kgm3, Bekisting Multip Pek. Rabat Beton t= 7cm Pas. Dinding Hebel 7.5x60x20 Pas. Plesteran Biasa 1:5 + Acian Pas. Lantai Keramik 4040 warna setara Masterina KW I Pas. Keramik Lantai 2020 CorakWarna Setara Masterina KW I Papan Nama Proyek Uk. 60x90 cm Pengadaan Air Kerja dan Listrik Kerja Pembongkaran Pek. Kolom Praktis 1515, Beton Site Mix K-175, Besi = 153kg, Bekisting Pap Pek. Balok Lintel 1215, Beton Site Mix K-175, Besi = 153kg, Bekisting Papan Pek. Ring Balok 1520, Beton Ready Mix K-225, Besi = 153 Kg, Bekisting Pap NO. URAIAN PEKERJAAN ANA- VOLUME LISA Mobilisasi dan Demobilisasi Alat Bantu PEMERINTAH KOTA TANGERANG SELATAN DINAS TATA KOTA, BANGUNAN DAN PEMUKIMAN KEGIATAN PEMBANGUNAN GEDUNG KANTOR DAFTAR KUANTITAS DAN HARGA HARGA SATUAN JUMLAH Rp. Rp. 2 PEKERJAAN LANTAI 2

I. PEK. BETON BERTULANG :