PEKERJAAN : LANJUTAN PEMBNAGUNAN KANTOR KECAMATAN CIPUTAT HARGA SATUAN
JUMLAH Rp.
Rp. 1
PEKERJAAN LANTAI 1 I. PEKERJAAN PERSIAPAN :
1 -
1.00 ls 7,500,000.00
7,500,000.00 2
I. 002 1.00
unit 245,284.79
245,284.79 3
- 1.00
ls 5,000,000.00
5,000,000.00 4
- 1.00
ls 3,000,000.00
3,000,000.00 15,745,284.79
II. PEK. BETON BERTULANG :
1 XIX. 170
0.71 m
3
4,585,423.22 3,255,650.49
2 XIX. 170
0.34 m
3
4,585,423.22 1,559,043.90
3 XIX. 167
1.97 m
3
3,907,079.01 7,696,945.65
4 XIX. 167
0.14 m
3
3,907,079.01 546,991.06
5 XIX. 001
30.00 m
2
99,317.93 2,979,537.90
16,038,168.99 III. PEKERJAAN PASANGAN :
1 -
186.83 m
2
125,883.22 23,518,762.72
2 X. 006
373.66 m
2
38,585.52 14,417,866.23
3 XI. 012
347.09 m
2
108,780.76 37,756,713.51
4 XI. 018
15.27 m
2
83,613.26 1,276,774.50
5 XI. 018
1.40 m
2
83,613.26 117,058.57
6 XVII. 001
2.00 bh
2,203,175.75 4,406,351.50
7 XVII. 002
2.00 bh
560,225.08 1,120,450.15
8 Pas. Wastafel Setara HCG
XVII. 005 2.00
bh 488,573.52
977,147.04 9
Pas. Urinoir Setara Toto Lengkap XVII. 004
2.00 bh
1,117,470.86 2,234,941.73
10 XVII. 006
1.00 bh
1,581,398.86 1,581,398.86
11 -
4.00 bh
100,000.00 400,000.00
87,807,464.80 IV. PEK.KUSEN,PINTU JENDELA+PLAFOND :
1 -
9.00 Unit
2,868,532.29 25,816,790.65
2 -
2.00 Unit
609,880.54 1,219,761.07
3 -
4.00 Unit
506,000.00 2,024,000.00
4 Pas. Partisi Gypsum t=9 mm Rangka Hollow
XII. 028 87.50
m
2
143,770.00 12,579,875.00
5 XII. 027
6.00 m
2
87,974.84 527,849.06
6 -
362.36 m
2
121,488.28 44,022,494.37
7 -
273.60 m
1
27,000.00 7,387,200.00
93,577,970.15 V. TANGGA :
1 XI. 012
23.40 m
2
108,780.76 2,545,469.75
2 XI. 012
4.68 m
2
108,780.76 509,093.95
3 21.00
m
1
450,000.00 9,450,000.00
12,504,563.70 VI. PEKERJAAN INSTALASI LISTRIK AIR :
1 -
2.00 Bh
14,000,000.00 28,000,000.00
2 1.00
ls 36,000,000.00
36,000,000.00 3
XXVII. 001 37.00
ttk 280,663.04
10,384,532.38 4
XXVII. 003 7.00
ttk 282,594.91
1,978,164.37 5
XXVII. 004 6.00
ttk 348,459.72
2,090,758.34 6
- 26.00
bh 100,000.00
2,600,000.00 7
- 24.00
bh 200,000.00
4,800,000.00 8
- 2.00
bh 100,000.00
200,000.00 9
XVII. 023 6.00
bh 48,652.95
291,917.68 10
XVII. 025 4.00
bh 37,922.95
151,691.81 11
XVII. 029 2.00
unit 3,441,253.50
6,882,507.01 12
- 1.00
ttk 8,500,000.00
8,500,000.00 13
- 2.00
bh 3,000,000.00
6,000,000.00 107,879,571.58
VII. PEKERJAAN LAIN - LAIN
1 XVIII. 012
548.66 m
2
28,959.02 15,888,658.11
2 XVIII. 034
368.36 m
2
29,904.43 11,015,595.76
3 XVIII. 034
19.15 m
2
29,904.43 572,669.83
4 -
1.00 bh
3,000,000.00 3,000,000.00
5 -
30.00 hrf
150,000.00 4,500,000.00
6 -
22.00 hrf
225,000.00 4,950,000.00
39,926,923.70
Lambang Daerah Tangerang Selatan Huruf Stainless Steel t=20 cm
Huruf Stainless Steel t=30 cm Pek. Septictank uk 2x1.5x1.5
Pek. Pengeboran Sumur + Pompa Listrik Pek. Water Torn 1000 L+ Instalasi
Pengecatan Dinding setara ICIDulux Warna Biasa Pengecatan Plafon Setara Metrolith
Pengecatan List Plafon Setara Metrolith Pek. Instalasi Stop Kontak AC 3x2.5 mm Eterna
Pas. Lampu Neon Phillips TL 40 Watt Pas. Lampu Down Light PL 20 Watt
Pas. Lampu Neon Phillips PL 20 Watt Pas. Kran Air
Pas. Floor Drain Ø 3 Lokal Pas. Plint Lantai 2040 warna setara Masterina KW I
Pas.Hand Railling Tangga Pipa Stainless Steel Ø 2.5 Box Panel Groub
Biaya Sambung Listrik PLN 330000 Watt Pek. Instalasi Titik Lampu 2x1.5 mm Eterna
Pek. Instalasi Stop Kontak 2x2.5 mm Eterna Kusen pintu P 3
Kusen pintu P 4 Pas. Penutup Plafond GRC t=5 mm Rangka Hollow 20x40
Pas. Penutup Plafond Gypsum=9 mm Rangka Hollow 20x40 Pas. List Profil Plafond Gypsum 7 CM
Pas. Keramik 4040 Setara Masterina Warna KWI Pas. Keramik Meja Pantry 2020 CorakWarna Setara Masterina KW I
Pas. Closet Duduk Setara HCG Pas. Closet Jongkok Setara Toto
Pas. Kitchen Zink lengkap Accessories Pas. Jet Washer
Kusen pintu P 1 Pek. Meja Pantry, Beton Ready Mix K-225, Besi = 88kgm3, Bekisting Multip
Pek. Rabat Beton t= 7cm Pas. Dinding Hebel 7.5x60x20
Pas. Plesteran Biasa 1:5 + Acian Pas. Lantai Keramik 4040 warna setara Masterina KW I
Pas. Keramik Lantai 2020 CorakWarna Setara Masterina KW I Papan Nama Proyek Uk. 60x90 cm
Pengadaan Air Kerja dan Listrik Kerja Pembongkaran
Pek. Kolom Praktis 1515, Beton Site Mix K-175, Besi = 153kg, Bekisting Pap Pek. Balok Lintel 1215, Beton Site Mix K-175, Besi = 153kg, Bekisting Papan
Pek. Ring Balok 1520, Beton Ready Mix K-225, Besi = 153 Kg, Bekisting Pap
NO. URAIAN PEKERJAAN
ANA- VOLUME
LISA
Mobilisasi dan Demobilisasi Alat Bantu
PEMERINTAH KOTA TANGERANG SELATAN DINAS TATA KOTA, BANGUNAN DAN PEMUKIMAN
KEGIATAN PEMBANGUNAN GEDUNG KANTOR DAFTAR KUANTITAS DAN HARGA
HARGA SATUAN JUMLAH
Rp. Rp.
2 PEKERJAAN LANTAI 2
I. PEK. BETON BERTULANG :