1.0 Subtotal BB5 Englesh Final BB5 DPMU161012 9am Clean
As s in lo
that Roa
4.5
Up year
sec As
sign Stat
bud diff
prov sing
past data
vola
Sourc
Eve and
limi repo
disb prog
The Gov
and stated abov
oans in 201 t will contri
ads and Brid
5 Predictab
to the prese rs has show
ction 4.1. H shown in
nificantly: U te Budget, U
dget. Howev ficulty in pr
viding accu gle year bud
t one year. a so as to no
atility and u
ce: Planned Dis
en in one-ye actual disb
it the ability orting. For e
bursements grams
e absence vernment’s
macro-econ e, Timor-Le
7, all of wh ibute towar
dges.
bility
ent, multi-y wn a dram
However, ac the graph
US63.7. m US139.5 m
ver, total di oducing acc
urate multi-y dget cycles,
In addition ot over com
unpredictabi
sbursement Bu
ear future pr bursement.
y of donors example, fo
for the ne will
of accura ability to c
nomic analy este is sche
hich are from ds enhancin
year project matic downw
ctual disbur h below, th
million in th million in th
isbursement curate budg
year project thus DPs a
n, DPs often mmit. Howev
ility could a
udget Books 20
rojections o This is due
to provide or 2017, UN
ext coming be
c ate informa
conduct bud ysis on a co
14 eduled to rec
m existing c ng Timor-L
tions of OD ward trend
rsements by he ODA g
he 2012 Sta he 2014 Sta
ts were 22 gets. This is
tions due th are not awar
n exercise ver, this is a
adversely af
11-2016, Actu
of ODA, dis e to a comb
forward lo N Women, a
g year, how concluding
ation on D dget plannin
onsolidated b ceive disbu
concessiona Leste’s infra
DA are not v d in future
y DPs rema grants proj
ate Budget, ate Budget,
22.7 million s partially d
he fact that re of how m
caution wh an issue tha
ffect the Go
ual Disbursemen
screpancies bination of s
oking data, and UNDP h
wever there in
DPs’ fund ng and carr
basis. ursements of
al loan agre astructure, p
very reliabl projections
ain at a fair ected for
US32.6 m US165.5 m
n for 2015. due to DPs h
many of th much fundin
hen providin at needs to b
overnment b
nts Aid Transp
are observe single year
and misrep have not inc
e is no in the
ding expect ry out med
f US101.8 ements for
primarily re
le. Each of s of DPs’
rly consisten 2015 have
million in th million in th
This illustr having diffi
heir projects ng will be a
ng forward-
be addresse budgeting pr
parency Portal
ed between budget cyc
porting, or c cluded any
dication th next
tations lim dium-term p
million projects
egarding
the past support
nt level. e varied
he 2013 he 2015
rates the iculty in
s are on available
-looking ed as aid
rocess.
planned cles that
cautious planned
hat their year.
mits the planning