Development Partnership Management Unit
disb the
Dev
www
Par
4.1
The to 2
decr tota
mill
A si seve
exam that
iden diff
spen disb
of a aris
amo dev
don
Sourc Septe
Futu next
bursements. ATP. All
velopment w.aidtranpa
rt 4: Tren
General t
e amount of 2015. ODA
reasing from al of US25
lion in grant ignificant d
eral reason mple, many
t year, mean ntified and
ferent fiscal nding trend
bursements a general tre
es from ope ount of dono
elopment p nor support.
ce: The 2012 to mber 2016.
ure disburse t year and t
The inform informatio
Partners arency.gov.t
nd of Dev
trend
f ODA to T A as a perce
m 23.5 in 58.4 millio
ts and US downward tr
s, most not y of USAID
nwhile disb begun. In a
l year July ds. For ex
from 2014 end in Aust
erating on d or funding m
process as t
2013 figures are
ements are this trend w
mation publ on in the
themselv tl
.
velopme
imor-Leste entage of t
n 2010 to 10 on will be p
101.8 millio rend in gran
tably, many D’s program
bursements addition, Ti
y to June, xample, acc
to 2015 are tralia’s fund
different fisc made availa
the country
e from previous
also indica will exponen
11 lished in thi
ATP is di ves. The
ent Assist
remained a the Combin
0.1 in 201 provided to
on in loans. nts is shown
y programs s concluded
decreased imor-Leste’
leading to cording to
e showing a ding but me
cal years. F able to Tim
y becomes m
budget books; 2
ating that s ntially cont
is budget b irectly ente
website
tance to
at the level ned Source
17 on a plan o Timor-Le
n between 2 s concluded
d in 2014 le in the follo
’s largest do difficulties
Timor-Les a 23 decr
erely reflec Finally, there
mor-Leste. H more self-r
2014 data on is
support will tinue until 2
ook is direc ered into th
can b
Timor ‐L
of US200 Budget ha
nned basis. este. This i
2014 and 20 d within th
ading to inc owing year
onor, Austr in reportin
ste’s fiscal ease, howev
cts the repor e has been a
However is a reliant and
from the Aid Tr
l decrease d 2020. This
ctly extract he system
be access
Leste
million fro as become
In 2017, a includes US
015. This i hat time fra
creased spen as program
ralia, operat ng and to d
l year, Au ver, this is
rting proble a contractio
a natural pa moves awa
ransparency Port
dramatically however, is
ed from by the
sed at
om 2011 smaller,
planned S156.6
s due to ame, for
nding in ms were
tes on a differing
ustralia’s not part
ems that on in the
rt of the ay from
tal as of 20
y in the s due to