Design included one underground and ten elevated stations and one self contained depot at Santolan, incorporating facilities for maintenance and servicing of the fleet.

The majority of the guideway structure is eight metres above the roadway. To avoid

a dark tunnel effect, the side of the viaduct beams were sloped to give a lighter appearance and maximise ambient light penetration onto the street below.

▪ incorporation of system into

The stations design incorporate concourse areas for retail areas and have full congested urban

wheelchair and disabled access via lifts and escalators. Stations are air-conditioned environment

and have fully automated ticket vending machines and automatic fare collection ▪ close liaison systems. These systems are monitored locally and remotely at the central depot

with five city office via a fibre optic network, allowing monitoring of system usage. and municipal

Halcrow were responsible for managing the client’s engineer consultants, managing authorities

the contractors and ensuring integration across all interfaces. Halcrow’s project ▪ driveless capability engineering manager was also responsible for managing contract payments,

with full AFC system

documentation and claims throughout the project. ▪ new depot and As well as the diversion of utilities along the line alignment, a number of undocumented

maintenance utilities were encountered requiring additional management and stakeholder liaison. facilities ▪ 11 new stations

The Evergreen Line is a new rapid transit line that will connect Coquitlam Town Centre to Vancouver starting at Lougheed Town Centre Station in Burnaby and ending near Douglas College in Coquitlam. The line will be a fast, frequent and convenient SkyTrain service, connecting Coquitlam Town Centre through Port Moody and Burnaby to Lougheed Town Centre in approximately 13 minutes. The Evergreen Line will seamlessly connect to the current SkyTrain network, including the Expo and Millennium, and will integrate with regional bus and West Coast Express networks.

The two track line is 11km long with six primary stations and a potential for up to two additional stations. The 5.9m diameter twin-bore precast concrete segmental tunnel is part of the Evergreen Line that emerges at the North Portal in Port Moody.

The alignment will run along elevated viaduct, tunnel and at-grade.

Halcrow provides tunnel conceptual and preliminary design up to procurement state that includes planning, civil, structural, ventilation and fre-life- safety design services.

Country

Canada

Project duration

2010 - 2014

Client

British Columbia Ministry of Transportation and Infrastructure Capital cost CD$ 1.4 billion Scope of services tunnel and portal alignment and preliminary designstation planningventilation

and firelife safety systems design

construction methodology and worksite layoutprovisional operation plan

Adva n ce d u r ba n t r a n spor t for on e of Ca n a da ’s la r ge st cit ie s

▪ fast, frequent and convenient rapid transit

▪ improved transportation network throughout Metro Vancouver

▪ increased transportation choice

▪ support for the environmental sustainability initiatives

Evergreen Line Rapid Transit

project formulation

Re-structuring advice Private sector

Project

T echnical advice

Project advisor

Reviewer

Due diligence

T ender advice/support

Risk assessment

Sydney LRT

Sydney-Canberra High Speed Rail Link

Tianjin MRT

Estonia Rail Privatisation - Review of Baltic Rail Services Business Plan

North Java High Speed Rail Link

Seoul Subway Line 9

Damansara Link

Kuala Lumpur Monorail

PUTRA LRT

STAR LRT

Busan - Youngdo LRT

Seoul - Kangnam LRT

Yong - In LRT

Bangkok Blue Line

Bangkok MRTA Blue Line

DLR Lewisham Extension

Nottingham Express Transit

Nottingham Tram Line

South Hampshire Rapid Transit

Privatisation of British Railways

Rail and Rolling Stock Strategy for Forward Trust

Railway Engineering & Operations, Channel Tunnel

Residual Value of New Rolling Stock

Victorian Rail Privatisation Bids

BDZ - master plan and financial improvement study

Liberail Study ▪ Elefsina-Savros-Spata Airport & Western

Imittos Peripheral Motorways

KLIA Expressrail

Philippines LRT Line 1 Extension

Philippines LRT Line 6

Northrail

PNR Restructuring and Privatisation ▪ Consultancy support to turnaround

programme ▪

Bangkok Blue Line concession bid

Dutch High Speed Line

Eurotunnel

Heathrow Express

New Virgin Rail West Coast Fleet

Competitiveness of rail transport in Central and Eastern European countries

Kuala Lumpur International Airport

Acquisition of KTMB, Malaysia

Seoul Metro Line 9 principle investor due diligence

Public sector

Manchester Metrolink Phases 1 and 2

Pearson International Airport Rail Link

Richmond-Airport-Vancouver Rapid Transit Project

Bogota Mass Transit

Lahore LRT

Warsaw Metro

Arlandabanan Rail Link, Stockholm

Hamilton to Lankhill Line, Strathclyde

London Underground Limited: Asset Management Review

Jakarta Mass Transit System

Independent Reporter to the Office of the Rail Regulator

South West Trains refranchise

Slovakian Freight privatisation

Rail commercial

Manila LRT1 extension

project matrix

Thameslink 2000

Denver Eagle P3 project - lender’s technical advisor

The Eagle P3 project is a public-private

Country

USA

partnership where Denver Regional

Project duration

Transport District (RTD) will contract with

2010 - ongoing

a team of private partners to design, build,

Client

finance operate, and maintain (DBFOM), the

Confidential

East Corridor, Gold Line, a short segment

Capital cost

of the Northwest Rail and commuter rail

$1.7 billion

maintenance facility projects as one

Scope of services

project.

civils, structures and stations

Through this PPP, RTD will retain all assets while

track, signaling,

shifting much of the risk of providing the projects to

power supplies and

the private partner or consortium. In return, RTD

distribution

will make service payments to the private partner,

rolling stock

allowing the agency to spread out large upfront costs over a longer period.

The East Corridor, Gold Line, a short segment of the Northwest Rail Electrif ed Segment and the Commuter Rail Maintenance Facility (CRMF) will be designed and built by the concessionaire. The concessionaire will provide and maintain the rail vehicles for all four commuter rail corridors. The concessionaire will also operate and maintain the East Corridor, the Gold Line and the North West Rail Electrif ed Segment as well as the transit specif c elements, such as stations and parking lots, on the Northwest Rail line, for up to 40 years. In addition, the Concessionaire will arrange f nancing for the project and receive payments based on their performance of the operation and maintenance of the project.