Click the Edit Bill of Material link to access the BOM. In taking a closer look at the Before making any revisions on the copied project, delete the original Sample PIP

2-12 Developers Guide for Oracle Application Integration Architecture Foundation Pack Figure 2–10 Sample Project Containing Three Business Tasks

2. Click the Edit Bill of Material link to access the BOM. In taking a closer look at the

BOM, notice that some harvested composites have already been associated with the projects business tasks, as shown in Figure 2–11 . In this example, each business task contains 3 composites, resulting in a total of 9 composites in the BOM. Working with Project Lifecycle Workbench 2-13 Figure 2–11 Nine Composites in the BOM Generated from the Project 3. Create a copy of the project that requires editing by selecting the project and clicking the Copy Project button, as shown in Figure 2–12 . Figure 2–12 Copy the Project As a part of creating a copy of the project, you will be prompted to rename the project. Although it is not the name we want for our final project, for now, name the copied project Sample PIP Project -Newly Copied, as shown in Figure 2–13 . 2-14 Developers Guide for Oracle Application Integration Architecture Foundation Pack Figure 2–13 Rename the Copied Project

4. Before making any revisions on the copied project, delete the original Sample PIP

Project . For information about deleting projects, see Section 2.3.5, How to Delete Project Lifecycle Workbench Projects. 5. Edit the copied project as necessary, including defining its final project name. Select the copied project to be edited and click the Update Project button, as shown in Figure 2–14 . Figure 2–14 Select to Update the Copied Project You can edit every field, such as the project name, business task names, various descriptions, assumptions, and add and remove business tasks. In this example, well rename project from Sample PIP Project - Newly Copied to Sample PIP Project v2. You may also rename business tasks per PIP naming standards. For this example, we will append new name per the naming standard to the original business task names, as shown in Figure 2–15 . Working with Project Lifecycle Workbench 2-15 Figure 2–15 Update Business Task Names

6. Regenerate the BOM for the copied and edited project by clicking the Generate