INTRODUCTION LITERATURE REVIEW METHODOLOGY 0: RESULT AND DISCUSSION

vii TABLE OF CONTENTS Declaration i Approval ii Abstract iii Abstrak iv Dedications v Acknowledgement vi Table of Content vii List of Figure xi List of Table xiii List of Abbreviations xiv

CHAPTER 1: INTRODUCTION

1.1 Introduction

1 1.2 Project Background 3

1.3 Problem Statement

3 1.4 Objectives 4 1.5 Scope of Project 4 1.6 Expected Result 4

1.7 Summary

5 2.0

CHAPTER 2: LITERATURE REVIEW

2.1 Introduction

6 2.2 Productivity Improvement 6 2.3 Quality Control Techniques 7 2.4 Work Study 14 2.5 Introduction to Work Methods and Time Study 16 2.6 Process Flow Chart 20 2.7 Work Measurement 22 viii 2.8 Techniques of Work Measurement 24 2.9 Element Breakdown 24 2.10 Determining the Rating Factor 25 2.10.1 Systems of Rating 25 2.11 Allowances 29 2.12 Standard Time 32 2.13 Estimating the Number of Observations to Make 32 2.14 Principles of Motion Economy 35 2.15 Use of the Human Body 35 2.16 JIT 39 2.17 Bill of Material 41 2.18 Simulation 41 2.18.1 Advantages of Simulation 42 2.18.2 Types of Simulation 42 2.19.2.1 Arena 42 2.19.2.2 ProModel 44 2.19.2.3 eM-Plant 44 2.19 Summary 3.0

CHAPTER 3: METHODOLOGY

3.1 Introduction 45 3.1.1 Project Selection 46 3.1.2 Discussion 46 3.2 Project Methodology 47 3.3 Overview of Methodology 49 3.3.1 Identify the problem 49 3.3.1.1 Stopwatch Time Study 49 3.3.1.2 Time Study Procedure 49 3.3.2 Investigate or Analyze the Problem 50 3.3.3 Perform Simulation 50 3.3.4 Analysis 50 ix 3.4 Simulation 51 3.4.1 Simulation Procedure 51 3.5 Summary 53

CHAPTER 4.0: RESULT AND DISCUSSION

4.1 Introduction 54 4.1.1 Parts in Table Top Fan 55 4.2 Assembly Process Flowchart 56 4.2.1 Bill of Material BOM 57 4.3 Work Study Before Improvement 59 4.3.1 Standard Operation System 62 4.4 Arena Flowchart 63 4.4.1 Simulation Flowchart 64 4.4.2 Simulation Current Condition 65 4.4.2.1 Operational Graph Time 66 4.4.2.2 Total Number Seized Output 67 4.5 Work Study After Improvement 68 4.5.1 Simulation after Improvement After Running 69 4.5.1.1 Operational Graph Time 70 4.5.1.2 Total Number Seized Output 71 4.6 Calculation of Productivity for Assembly Process 72 4.6.1 Operators’ Factor 74 4.6.2 Standard Operation Procedures 75 4.6.3 Minimize the Waste in the Process 76 4.7 Summary 78 x

CHAPTER 5: CONCLUSION AND RECOMMENDATION