Outcomes of extension Lack of synergy and coordination

44

2.2.3 Outcomes of extension

The CAEP and CPEP achieved significant results in the training of Ministry officials and the procurement of annual budget allocations. The DSPSP pursued similar efforts on safety at sea for artisanal fisheries, with the support of the regional services and coastal stations for surveillance conducting annual outreach and extension initiatives on navigation and use of equipment for safety at sea flares, GPS, radars etc.. The DPM, on its part, designed plans to revamp its own extension unit. Together with PRAO, the DPM provided computers, mobile phones and Internet access to the staff in its respective units to improve information sharing, stakeholder training and project monitoring. Some projects, such as PAPA SUD and COGEPAS that ended recently, also achieved encouraging results in extension and capacity development because they had skilled workers, appropriate equipment, adequate funding and elaborate structures. These projects trained and prepared local actors to have a satisfactory level of ownership in the PAPA SUD, for example, the beneficiaries are using improved fish processing techniques with the infrastructure and equipment of IEIGs put in place by COGEPAS; implementing timely, well-targeted management initiatives; and have mastered the administration of innovative technologies: octopus pots, artificial branches for cuttlefish, MPAs, immersion of shell reefs, release of juveniles, etc..

3.2.4. Lack of synergy and coordination

We observed there was no synergy and coordination between the respective entities involved in extension, particularly the non-State entities which often run their own initiatives based on the needs of their partners and the opportunities they have. Overall, the situation was far from satisfactory. There was an apparent lack of political will, on the part of the public authorities, and the poor showing of the national fisheries extension program, both of which put in jeopardy the steps taken to ensure proper monitoring, coherence and sustainability of extension and capacity development activities.

3.2.5 Main factors of success and failure Strengths and Weaknesses