102 103 Section 9 Cost Summaries 104

9.1 Fixed Capital Summary

Table 9.1: Fixed Capital Investment Summary Bare Module Costs Process Machinery 41,454,717 Spares 3,629,192 Storage 831,406 Other Equipment 699,530 Catalysts 5,576,741 Computers, Software, Etc. - Total Bare Module Costs: 52,191,590 Plus: Cost of Site Preparations 2,609,579 Plus: Cost of Service Facilities 2,609,579 Plus: Allocated Costs for utility plants and related facilities - Direct Permanent Investment 57,410,744 Plus: Cost of Contingencies Contractor Fees 10,333,934 Total Depreciable Capital 67,744,678 Plus: Cost of Land 1,354,894 Plus: Cost of Royalties - Plus: Cost of Plant Start-Up 6,774,468 Total Unadjusted Permanent Investment 75,874,040 Site Factor 1.0 Total Permanent Investment 75,874,040 Purchase costs and bare module costs of equipment were estimated using Aspen IPE and Aspen Economic Analyzer. Once total bare module costs were estimated, cost of site preparation and service facilities were estimated as 5 of total bare module costs using the method described in Seider, Seader, Lewin, and Widago. It was assumed that there were already existing utility and wastewater treatment plants available so the allocated costs for utility plants and related facilities was assumed to be zero. Also following the procedure outline in Seider et al, the cost of contingencies and contractor fees was estimated to be 18 of direct permanent investment, the cost of land is 2 of total depreciable capital, and plant start-up cost is estimated to be 10 of total depreciable capital. 105 Table 9.2: Total Capital Investment Summary Total Permanent Investment: 75,874,040 Plus: Present Value of 2014 Working Capital 13,228,811 Plus: Present Value of 2015 Working Capital 5,751,657 Plus: Present Value of 2016 Working Capital 5,001,441 Total Capital Investment 99,855,948 The total capital investment, depicted in Table 9.2, includes total permanent investment and the net present value of working capital contributions. The working capital forms a significant part of the total capital investment of approximately 24. 106

9.2 Variable Cost Summary

Table 9.3: Variable Cost Summary General Expenses Selling Transfer Expenses: 10,500,000 Direct Research: 16,800,000 Allocated Research: 1,750,000 Administrative Expense: 7,000,000 Management Incentive Compensation: 4,375,000 Total General Expenses 40,425,000 Raw Materials Propane 42,600,000 Compressed Oxygen 6,000,000 Total Raw Materials 48,600,000 Byproducts Wastewater Treatment 7,564,660 Total Byproducts 7,564,660 Utilities High Pressure Steam 2,440,000 Low Pressure Steam 1,658,945 Cooling Water 25,000 Electricity 13,800,000 Total Utilities 17,136,845 Total Variable Cost 113,726,505 General expenses cover expenses associated with the direct management of product within the plant but are not related to the direct manufacturing cost. Instead, they are assumed to be a fixed percentage of sales. 21 21 Seider, W. D., Seader, J. D., Lewin, D. R., Widagdo, S. 2009. Product and Process Design Principles: Synthesis, Analysis, and Evaluation Vol. 3. Hoboken, NJ: John Wiley Sons, Inc. 107

9.3 Fixed Cost Summary

Fixed costs for the process were estimated according to the methods described in Seider, Seader, Lewin, and Widago. Operations expense was estimated by assuming 6 operators per shift with 5 shifts, an hourly wage of 40operator hour, and including 30 of direct wages and benefits. Maintenance expense was estimated by including 4.5 of depreciable capital for wages Table 9.4: Fixed Cost Summary Operations Direct Wages and Benefits 2,496,000 Direct Salaries and Benefits 748,800 Operating Supplies and Services 149,760 Technical Assistance to Manufacturing 4,500,000 Control Laboratory 4,500,000 Total Operations 12,394,560 Maintenance Wages and Benefits 3,026,807 Salaries and Benefits 756,702 Materials and Services 3,026,807 Maintenance Overhead 151,340 Total Maintenance 6,961,656 Operating Overhead General Plant Overhead 527,123 Mechanical Department Services 210,849 Employee Relations Department 421,699 Business Services 520,095 Total Operating Overhead 1,679,766 Property Taxes and Insurance Property Taxes and Insurance 2,017,871 Other Annual Expenses Rental Fees: - Licensing Fees: - Total Fixed Costs 23,053,854

Dokumen yang terkait

Proses Pembuatan Gantungan Kunci Acrylic Di Pt.Angkasa putra

0 2 1

PRELIMINARY DESIGN OF PROPYLENE GLYCOL PLANT FROM PROPYLENE OXIDE AND WATER USING ACID CATALYST Preliminary Design of Propylene Glycol Plant from Propylene Oxide and Water Using Acid Catalyst Capacity of 60,000 Tons/Year.

0 4 18

PRELIMINARY DESIGN OF PROPYLENE GLYCOL PLANT FROM PROPYLENE OXIDE AND WATER USING ACID CATALYST Preliminary Design of Propylene Glycol Plant from Propylene Oxide and Water Using Acid Catalyst Capacity of 60,000 Tons/Year.

0 2 14

PRELIMINARY DESIGN OF PROPYLENE GLYCOL PLANT FROM PROPYLENE OXIDE AND WATER USING ACID CATALYST Preliminary Design of Propylene Glycol Plant from Propylene Oxide and Water Using Acid Catalyst with Capacity of 50,000 Ton/Year.

0 4 15

PRELIMINARY DESIGN OF PROPYLENE GLYCOL PLANT FROM PROPYLENE OXIDE AND WATER USING ACID Preliminary Design of Propylene Glycol Plant from Propylene Oxide and Water Using Acid Catalyst with Capacity of 50,000 Ton/Year.

0 2 14

PRELIMINARY DESIGN OF PRECIPITATED SILICA PLANT FROM SULPHURIC ACID AND SODIUM SILICATE Preliminary of Precipitated Silica Plant from Sulphuric Acid and Sodium Silicate with Capacity of 45,000 ton/year.

0 8 13

Parameter Design to Improve Yield in Integrated Circuit Assembly Plant.

0 0 15

Acrylic Painting Lesson Mistakes To Avoid In Your Acrylic Paintings

0 0 1

KINETIC INVESTIGATION OF CARBON DIOXIDE, ACETIC ACID, ACRYLIC ACID FORMATION ON DILUTED AND LEACHED MoVTeNb CATALYST Ubaya Repository

0 0 8

Degradation Behaviour of Gamma Irradiated Poly(Acrylic Acid)-graft-Chitosan Superabsorbent Hydrogel

0 0 13