1.4 98.5 EVALUASI DAN PERENCANAAN JARINGAN DISTRIBUSI PLN RAYON BANTUL DENGAN INTEGRASI PEMBANGKIT TERSEBAR ENERGI TERBARUKAN

Lampiran 4: Losses Summary Report Penyulang Bantul 11 kondisi existing sebelum Pemasangan DG Branch Losses Summary Report CKT Branch From-To Bus Flow To-From Bus Flow Losses Bus Voltage Vd Drop ID MW Mvar MW Mvar kW kvar From To in Vmag T1 7.145 4.897 -7.142 -4.779

3.5 118.8

100.0 99.2

0.80 Cable 1

7.142 4.779 -7.099 -4.757

42.5 21.3

99.2 98.7

0.54 Cable 2

3.223 2.144 -3.214 -2.139

8.7 4.4

98.7 98.4

0.25 Z 001 S 001

0.820 0.558 -0.813 -0.504

7.7 54.5

98.7 95.1

3.60 Z 001 S 003

0.233 0.155 -0.229 -0.142

4.1 12.6

98.7 95.0

3.61 Z 001 S 004

0.026 0.017 -0.025 -0.016

0.5 1.2

98.7 95.3

3.40 Z 001 S 005

1.220 0.829 -1.209 -0.749

11.3 80.2

98.7 95.1

3.55 Z 001 S 006

0.110 0.073 -0.108 -0.067

1.9 5.8

98.7 95.2

3.49 Z 001 S 007

0.064 0.042 -0.063 -0.039

1.2 3.0

98.7 95.3

3.40 Z 001 S 008

0.305 0.203 -0.300 -0.186

4.4 17.3

98.7 95.1

3.52 Z 001 S 009

0.309 0.206 -0.305 -0.189

4.2 16.8

98.7 95.3

3.37 Z 001 S 010

0.204 0.135 -0.200 -0.124

3.5 10.9

98.7 95.1

3.59 Z 001 S 011

0.586 0.396 -0.579 -0.359

6.4 36.9

98.7 95.1

3.55 Cable 3

1.788 1.167 -1.785 -1.166

2.7 1.3

98.4 98.3

0.14 Z 002 S 000

1.426 0.972 -1.417 -0.878

8.8 93.5

98.4 95.1

3.33 Cable 4

1.671 1.091 -1.669 -1.090

2.3 1.2

98.3 98.1

0.13 Z 003 S 000

0.114 0.075 -0.113 -0.070

1.8 5.5

98.3 95.0

3.23 Cable 5

1.390 0.907 -1.389 -0.906

1.6 0.8

98.1 98.0

0.11 Z 005 S 000

0.279 0.182 -0.276 -0.171

2.9 11.6

98.1 95.6

2.56 Cable 6

1.338 0.873 -1.336 -0.873

1.5 0.8

98.0 97.9

0.10 Z 006 S 000

0.051 0.033 -0.050 -0.031

0.8 1.9

98.0 95.3

2.71 Cable 7

1.062 0.692 -1.061 -0.692

0.9 0.5

97.9 97.9

0.08 Z 007 S 000

0.274 0.180 -0.271 -0.168

3.1 12.2

97.9 95.2

2.74 Cable 8

0.850 0.554 -0.849 -0.554

0.6 0.3

97.9 97.8

0.07 Z 008 S 000

0.211 0.138 -0.208 -0.129

2.8 8.5

97.9 95.2

2.68 Cable 9 0.790 0.515 -0.790 -0.515 0.5

0.3 97.8

97.7 0.06

Z 011 S 000 0.059 0.038 -0.058 -0.036 0.9

2.2 97.8

95.1 2.64

Cable 10 0.570 0.372 -0.570 -0.372 0.3

0.1 97.7

97.7 0.04

Z 013 S 000 0.219 0.143 -0.217 -0.134 2.3

9.0 97.7

95.2 2.51

Cable 11 0.380 0.248 -0.380 -0.248 0.1

0.1 97.7

97.7 0.03

Z 014 S 000 0.190 0.124 -0.188 -0.116 2.5 7.7 97.7

95.0 2.68

Cable 12 0.215 0.140 -0.215 -0.140 0.0

0.0 97.7

97.6 0.02

Z 016 S 000 0.165 0.107 -0.162 -0.101 2.2

6.7 97.7

95.0 2.68

Cable 13 0.148 0.096 -0.148 -0.096 0.0

0.0 97.6

97.6 0.01

Z 017 S 000 0.068 0.044 -0.067 -0.041 0.9

2.7 97.6

95.0 2.60

Z 018 S 000 0.148 0.096 -0.146 -0.090 1.9

6.0 97.6

94.9 2.68

T50 100.0 100.0 141.2 556.6 Lampiran 5: Losses Summary Report Penyulang Bantul 11 kondisi Setelah Pemasangan DG pada Bus 69 Branch Losses Summary Report CKT Branch From-To Bus Flow To-From Bus Flow Losses Bus Voltage Vd Drop ID MW Mvar MW Mvar kW kvar From To in Vmag T1 5.693 3.875 -5.691 -3.800

2.2 75.1

100.0 99.4

0.64 Cable 1

5.691 3.800 -5.664 -3.786

26.8 13.5

99.4 98.9

0.43 Cable 2

1.784 1.171 -1.781 -1.170

2.6 1.3

98.9 98.8

0.14 Z 001 S 001

0.821 0.559 -0.814 -0.504

7.7 54.3

98.9 95.3

3.59 Z 001 S 003

0.234 0.155 -0.229 -0.142

4.1 12.6

98.9 95.3

3.60 Z 001 S 004

0.026 0.017 -0.025 -0.016

0.5 1.2

98.9 95.5

3.39 Z 001 S 005

1.222 0.830 -1.210 -0.750

11.3 79.9

98.9 95.4

3.55 Z 001 S 006

0.110 0.073 -0.109 -0.067

1.9 5.7

98.9 95.4

3.49 Z 001 S 007

0.064 0.042 -0.063 -0.039

1.2 3.0

98.9 95.5

3.39 Z 001 S 008

0.305 0.204 -0.301 -0.186

4.4 17.3

98.9 95.4

3.51 Z 001 S 009

0.309 0.206 -0.305 -0.189

4.2 16.8

98.9 95.6

3.36 Z 001 S 010

0.204 0.135 -0.200 -0.124

3.5 10.9

98.9 95.4

3.58 Z 001 S 011

0.586 0.396 -0.580 -0.360

6.4 36.8

98.9 95.4

3.54 Cable 3

0.353 0.197 -0.353 -0.197

0.1 0.0

98.8 98.8

0.03 Z 002 S 000

1.428 0.973 -1.419 -0.880

8.7 93.0

98.8 95.5

3.32