ALGIERS REFINERY REHABILITATION AND ADAP
ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :
CLASS:1
Project N° - Unit
Doc Type
Material Code
Serial Number
Rev.
Page
9952T-000
STC
1490
0001
7
1/7
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Pages modified under this revision:
STC 0022 Sheet 2 to 4 , STC 0048 Sheet 1 and 2 , New STC 0049 , STC 0059 , STC 0062 Sheet :1
New STC 0062 Sheet: 2 , STC 0073, STC 074,
Saïd Kabeche
2014.03.12
08:30:32 +01'00'
Boussaid
2014.03.12
09:23:22 +01'00'
IDIRI Mokrane
2014.03.12
11:42:43 +01'00'
7
09/MAR/14
IFC-ISSUE FOR CONSTRUCTION
S.KABECHE
O.BOUSSAID
M.IDIRI
6
28/JAN/14
IFC-ISSUE FOR CONSTRUCTION
S.KABECHE
O.BOUSSAID
M.IDIRI
5
25/DEC/13
IFC-ISSUE FOR CONSTRUCTION
S.KABECHE
A.DJELOUAH
M.IDIRI
4
03/JUN/13
IFC-ISSUE FOR CONSTRUCTION
S.GUENNEGAN
M.LONG
F.OUDJHARA
3
21/MAY/13
IFC-ISSUE FOR CONSTRUCTION
S.GUENNEGAN
M.LONG
F.OUDJHARA
2
25/FEB/13
IFC-ISSUE FOR CONSTRUCTION
O.BOUSSAID
S.KABECHE
M. IDIRI
1
21/NOV/12
IFC-ISSUE FOR CONSTRUCTION
B.VEZMAR
C.VENARD
C.VENARD
0
05/MAY/12
IFC-ISSUE FOR CONSTRUCTION
B.VEZMAR
C.VENARD
C.VENARD
B
11/AUG/11
IFA-ISSUE FOR APPROVAL
B.VEZMAR
C.VENARD
C.VENARD
A
08/FEB/11
IFA-ISSUE FOR APPROVAL
M-SAMER
C-VENARD
M-IDIRI
Rev
Date
DD/MMM/YY
STATUS
WRITTEN BY
(name & visa)
CHECKED BY
(name & visa)
APPROVED BY
(name & visa)
DOCUMENT REVISIONS
Sections changed in last revision are identified by a vertical line in the margin
PP 1 - ANG - rev. 2
ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :
CLASS:1
Project N° - Unit
Doc Type
Material Code
Serial Number
Rev.
Page
9952T-000
STC
1490
0001
7
2/7
CONSTRUCTION STANDARDS – SITE ARRANGEMENT – UNDERGROUND PIPING
Date
Serial n°
Description
Rev.
A
08/FEB/11
0002
SYMBOLS AND ABBREVIATIONS FOR CIVIL WORK
0
05/MAY/12
0010
FLOOR DRAIN FOR SMALL PAVED AREAS
Installation of ductile iron trap
2
3
A
7
8
4
B
11/AUG/11
5
0
05/MAY/12
6
1
A
0012
0013
OILY WATER AND CONTAMINATED RAIN WATER
7
B
8
08/FEB/11
4
5
0
05/MAY/12
SYSTEM SY & HY ( Ø ≤ 20” )
1
21/NOV/12
6
Manhole with or without submerged connection
2
7
A
18/FEB/13
08/FEB/11
OILY WATER AND CONTAMINATED RAIN WATER
B
11/AUG/11
5
6
0
05/MAY/12
1
30/OCT/12
7
Fire Trap Double compartment Manhole
2
8
A
18/FEB/13
08/FEB/11
CLEAN-OUT
B
11/AUG/11
4
Cast iron or steel system
0
05/MAY/12
A
PURGE RECOVERY – PRESSURE SUPPLY
Typical installation
0017
B
11/AUG/11
5
05/MAY/12
6
1
21/NOV/12
PP 1 - ANG - rev. 2
HYDRAULIC SEALS
B
22°30 Submerged Connection - Steel system
-
4
0
A
VENTS FOR MANHOLES
5
7
2
0016
3
6
08/FEB/11
7
8
08/FEB/11
25/DEC/13
4
SYSTEM SY & HY ( Ø > 20” )
2
0015
3
11/AUG/11
1
0014
5
6
08/FEB/11
Date
4
1
2
0011
R
e
v.
4
11/AUG/11
5
0
05/MAY/12
6
1
21/NOV/12
7
2
8
A
25/DEC/13
08/FEB/11
B
11/AUG/11
5
4
0
05/MAY/12
6
1
25/DEC/13
7
2
8
A
4
0
5
1
6
2
7
3
8
25/DEC/13
ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :
CLASS:1
Project N° - Unit
Doc Type
Material Code
Serial Number
Rev.
Page
9952T-000
STC
1490
0001
7
3/7
Seria
l n°
Description
Rev.
0018
STORM WATER SYSTEM (WY)
B
A
Ditch water catch Basin
0019
STORM WATER SYSTEM (WY)
Manhole in traffic area
0020
STORM WATER SYSTEM (WY)
Ordinary Manhole outside traffic area
0021
CONTAMINATED RAIN WATER SYSTEM (HY)
Catch basin
STORM WATER SYSTEM (WY)
Catch basin for half concrete Pipe channel SHEET 1/4
0026
0027
-
SANITARY SEWER (SAY)
Manhole
PP 1 - ANG - rev. 2
25/DEC/13
4
5
05/MAY/12
6
2
7
A
18/FEB/13
08/FEB/11
B
11/AUG/11
4
5
3
0
05/MAY/12
1
21/NOV/12
6
2
7
A
18/FEB/13
08/FEB/11
B
11/AUG/11
4
5
3
0
05/MAY/12
1
21/NOV/12
6
2
7
A
18/FEB/13
08/FEB/11
B
11/AUG/11
4
5
3
0
05/MAY/12
1
21/NOV/12
6
2
18/FEB/13
7
11/AUG/11
05/MAY/12
1
30/OCT/12
6
2
18/FEB/13
7
0
25/DEC/13
05/MAY/12
25/DEC/13
25/DEC/13
5
9
5
1
30/OCT/12
6
2
18/FEB/13
7
3
25/DEC/13
09/MAR/14
25/DEC/13
4
0
8
9
0
05/MAY/12
5
25/DEC/13
1
21/NOV/12
6
09/MAR/14
2
18/FEB/13
7
3
05/MAY/13
8
4
STORM WATER SYSTEM (WY)
Catch basin for half concrete Pipe channel SHEET 4/4
3
11/AUG/11
21/NOV/12
4
STORM WATER SYSTEM (WY)
Catch basin for half concrete Pipe channel SHEET 3/4
Date
0
3
STORM WATER SYSTEM (WY)
Catch basin for half concrete Pipe channel SHEET 2/4
08/FEB/11
R
e
v.
1
A
0022
Date
03/JUN/13
9
0
25/DEC/13
5
1
09/MAR/14
6
2
7
3
8
4
9
A
4
0
5
1
6
2
7
3
A
B
08/FEB/11
11/AUG/11
8
4
5
6
0
05/MAY/12
1
21/NOV/12
7
2
19/FEB/13
8
ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :
Seria
l n°
CLASS:1
Project N° - Unit
Doc Type
Material Code
Serial Number
Rev.
Page
9952T-000
STC
1490
0001
7
4/7
Description
Rev.
A
0035
0036
0037
0038
Date
08/FEB/11
STORM WATER SYSTEM (WY)
B
11/AUG/11
5
Desander for Standards ditches
0
05/MAY/12
6
1
21/NOV/12
7
2
24/FEB/13
8
-
-
-
A
4
0
5
1
6
2
7
3
8
A
4
0
5
1
6
2
7
3
8
A
4
0
5
1
6
2
7
3
A
0039
0040
0041
0042
0043
0044
PP 1 - ANG - rev. 2
R
e
v.
4
8
08/FEB/11
4
STORM WATER SYSTEM (WY)
B
11/AUG/11
5
Desander for standard ditch
0
05/MAY/12
6
1
21/NOV/12
7
2
24 /FEB /13
-
-
-
-
-
8
A
4
0
5
1
6
2
7
3
8
A
4
0
5
1
6
2
7
3
8
A
4
0
5
1
6
2
7
3
8
A
4
0
5
1
6
2
7
3
8
A
4
0
5
1
6
2
7
3
8
Date
ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :
CLASS:1
Project N° - Unit
Doc Type
Material Code
Serial Number
Rev.
Page
9952T-000
STC
1490
0001
7
5/7
Seria
l n°
Description
Rev.
A
R
e
v.
4
0046
-
0
5
1
6
2
7
0047
-
Date
3
8
A
4
0
5
1
6
2
7
3
8
4
25/DEC/13
STORM WATER SYSTEM (WY)
0
05/MAY/12
5
09/MAR/14
2 Stages manhole for 1000 to 1500 Dia. header
1
21/NOV/12
6
SHEET 1 / 2
2
19/FEB/13
7
25/DEC/13
09/MAR/14
25/DEC/13
6
A
0048
A
0049
5
STORM WATER SYSTEM (WY)
0
2 Stages manhole for 1000 to 1500 Dia. header
1
SHEET 2 / 2
2
8
3
8
9
A
4
DETAIL LADDER FOR CATCH-BASIN , MANHOLES
0
AND PITS
1
6
2
7
A
09/MAR/14
GRAVITY & PRESSURIZED SYSTEMS
B
11/AUG/11
5
0
05/MAY/12
6
1
21/NOV/12
7
2
19/FEB/13
8
5
4
STANDARDS RUNGS FOR MANHOLES, CATCH
0
03/JUN/13
BASIN AND VALVE PITS
1
25/DEC/13
3
A
08/FEB/11
FIRE SYSTEM (FW)
B
11/AUG/11
5
0
05/MAY/12
6
1
21/NOV/12
7
8
11/AUG/11
4
FIRE SYSTEM (FW)
0
05/MAY/12
5
Hose box and Guard post
1
21/NOV/12
6
2
7
3
A
FIRE SYSTEM (FW)
B
Fixed Water Monitor
8
08/FEB/11
4
11/AUG/11
5
0
05/MAY/12
6
1
21/NOV/12
2
A
PP 1 - ANG - rev. 2
8
4
Hydrant – Typical Installation
A
0054
6
7
2
0053
4
Standard Valve Pits
2
0052
5
8
08/FEB/11
A
0051
7
4
3
0050
Date
7
8
08/FEB/11
4
ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :
0055
CLASS:1
Project N° - Unit
Doc Type
Material Code
Serial Number
Rev.
Page
9952T-000
STC
1490
0001
7
6/7
FIRE SYSTEM (FW)
B
Monitor – Remote controlled
1
Cancelled
6
5
2
7
3
Seria
l n°
Description
Rev.
A
8
R
e
v.
4
0056
-
0
5
1
6
2
7
Date
3
A
0057
8
08/FEB/11
B
11/AUG/11
4
Safety Shower – Eyewash typical installation
0
05/MAY/12
5
1
21/NOV/12
FIRE WATER SYSTEM (FW)
0
Hose reel – Typical installation
1
4
05/MAY/12
6
7
3
8
4
FIRE WATER SYSTEM (FW)
0
05/MAY/12
5
Concrete trenchin paved area
1
Cancelled
6
2
09/MAR/14
7
3
A
8
08/FEB/11
B
11/AUG/11
4
For Electrical or Instrumentation Cables
0
05/MAY/12
5
1
21/NOV/12
A
CONDUITS UNDER PIPE-WAYS
B
For Electrical or Instrumentation Cables
08/FEB/11
Concrete cable trench in paved area Sheet :1
4
0
05/MAY/12
5
1
25/DEC/13
6
B
7
08/FEB/11
11/AUG/11
3
03/JUN/13
4
25/DEC/13
09/MAR/14
0
05/MAY/12
5
1
21/NOV/12
6
2
19/FEB/13
0
0062
3
11/AUG/11
A
ELECTRICAL OR INSTRUMENTATION
6
7
2
0062
3
ROAD CROSSING DUCT BANK
2
0061
5
2
A
0060
6
7
A
0059
3
DRINKING WATER SYSTEM (DW)
2
0058
09/MAR/14
7
3
ELECTRICAL OR INSTRUMENTATION
Precast Concrete cable trench in paved area Sheet: 2
A
0063
08/FEB/11
B
11/AUG/11
4
Detail of concrete cable trench
0
05/MAY/12
5
1
6
2
0064
PP 1 - ANG - rev. 2
3
ELECTRICAL OR INSTRUMENTATION
A
Date
7
11/AUG/11
4
ELECTRICAL OR INSTRUMENTATION
0
20/APR/12
5
Detail of direct buried cable trench
1
25/DEC/13
6
ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :
CLASS:1
Project N° - Unit
Doc Type
Material Code
Serial Number
Rev.
Page
9952T-000
STC
1490
0001
7
7/7
2
0065
7
3
8
A
4
-INSTRUMENTATION OPTIC FIBER TRENCH
0
05/MAY/12
5
Typical section and crossing
1
21/NOV/12
6
2
7
3
0073
TYPICAL PAVING DETAILS
8
A
08/FEB/11
3
B
11/AUG/11
4
0
05/MAY/12
5
1
09/MAR/14
6
2
A
0074
PAVING
B
LADDER FOUNDATION PAD
11/AUG/11
05/MAY/12
5
21/MAY/13
6
2
25/DEC/13
7
08/FEB/11
11/AUG/11
4
0
05/MAY/12
5
A
6
7
08/FEB/11
11/AUG/11
4
0
05/MAY/12
5
6
2
7
A
3
B
PP 1 - ANG - rev. 2
PIPES CROSSING THROUGH DYKE WALL
3
B
1
0077
3
B
2
STAIRWAY FOUNDATION PAD
28/JAN/14
09/MAR/14
0
1
0076
3
4
1
A
0075
7
08/FEB/11
0
4
05/MAY/12
5
1
6
2
7
2
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :
CLASS:1
Project N° - Unit
Doc Type
Material Code
Serial Number
Rev.
Page
9952T-000
STC
1490
0001
7
1/7
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Pages modified under this revision:
STC 0022 Sheet 2 to 4 , STC 0048 Sheet 1 and 2 , New STC 0049 , STC 0059 , STC 0062 Sheet :1
New STC 0062 Sheet: 2 , STC 0073, STC 074,
Saïd Kabeche
2014.03.12
08:30:32 +01'00'
Boussaid
2014.03.12
09:23:22 +01'00'
IDIRI Mokrane
2014.03.12
11:42:43 +01'00'
7
09/MAR/14
IFC-ISSUE FOR CONSTRUCTION
S.KABECHE
O.BOUSSAID
M.IDIRI
6
28/JAN/14
IFC-ISSUE FOR CONSTRUCTION
S.KABECHE
O.BOUSSAID
M.IDIRI
5
25/DEC/13
IFC-ISSUE FOR CONSTRUCTION
S.KABECHE
A.DJELOUAH
M.IDIRI
4
03/JUN/13
IFC-ISSUE FOR CONSTRUCTION
S.GUENNEGAN
M.LONG
F.OUDJHARA
3
21/MAY/13
IFC-ISSUE FOR CONSTRUCTION
S.GUENNEGAN
M.LONG
F.OUDJHARA
2
25/FEB/13
IFC-ISSUE FOR CONSTRUCTION
O.BOUSSAID
S.KABECHE
M. IDIRI
1
21/NOV/12
IFC-ISSUE FOR CONSTRUCTION
B.VEZMAR
C.VENARD
C.VENARD
0
05/MAY/12
IFC-ISSUE FOR CONSTRUCTION
B.VEZMAR
C.VENARD
C.VENARD
B
11/AUG/11
IFA-ISSUE FOR APPROVAL
B.VEZMAR
C.VENARD
C.VENARD
A
08/FEB/11
IFA-ISSUE FOR APPROVAL
M-SAMER
C-VENARD
M-IDIRI
Rev
Date
DD/MMM/YY
STATUS
WRITTEN BY
(name & visa)
CHECKED BY
(name & visa)
APPROVED BY
(name & visa)
DOCUMENT REVISIONS
Sections changed in last revision are identified by a vertical line in the margin
PP 1 - ANG - rev. 2
ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :
CLASS:1
Project N° - Unit
Doc Type
Material Code
Serial Number
Rev.
Page
9952T-000
STC
1490
0001
7
2/7
CONSTRUCTION STANDARDS – SITE ARRANGEMENT – UNDERGROUND PIPING
Date
Serial n°
Description
Rev.
A
08/FEB/11
0002
SYMBOLS AND ABBREVIATIONS FOR CIVIL WORK
0
05/MAY/12
0010
FLOOR DRAIN FOR SMALL PAVED AREAS
Installation of ductile iron trap
2
3
A
7
8
4
B
11/AUG/11
5
0
05/MAY/12
6
1
A
0012
0013
OILY WATER AND CONTAMINATED RAIN WATER
7
B
8
08/FEB/11
4
5
0
05/MAY/12
SYSTEM SY & HY ( Ø ≤ 20” )
1
21/NOV/12
6
Manhole with or without submerged connection
2
7
A
18/FEB/13
08/FEB/11
OILY WATER AND CONTAMINATED RAIN WATER
B
11/AUG/11
5
6
0
05/MAY/12
1
30/OCT/12
7
Fire Trap Double compartment Manhole
2
8
A
18/FEB/13
08/FEB/11
CLEAN-OUT
B
11/AUG/11
4
Cast iron or steel system
0
05/MAY/12
A
PURGE RECOVERY – PRESSURE SUPPLY
Typical installation
0017
B
11/AUG/11
5
05/MAY/12
6
1
21/NOV/12
PP 1 - ANG - rev. 2
HYDRAULIC SEALS
B
22°30 Submerged Connection - Steel system
-
4
0
A
VENTS FOR MANHOLES
5
7
2
0016
3
6
08/FEB/11
7
8
08/FEB/11
25/DEC/13
4
SYSTEM SY & HY ( Ø > 20” )
2
0015
3
11/AUG/11
1
0014
5
6
08/FEB/11
Date
4
1
2
0011
R
e
v.
4
11/AUG/11
5
0
05/MAY/12
6
1
21/NOV/12
7
2
8
A
25/DEC/13
08/FEB/11
B
11/AUG/11
5
4
0
05/MAY/12
6
1
25/DEC/13
7
2
8
A
4
0
5
1
6
2
7
3
8
25/DEC/13
ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :
CLASS:1
Project N° - Unit
Doc Type
Material Code
Serial Number
Rev.
Page
9952T-000
STC
1490
0001
7
3/7
Seria
l n°
Description
Rev.
0018
STORM WATER SYSTEM (WY)
B
A
Ditch water catch Basin
0019
STORM WATER SYSTEM (WY)
Manhole in traffic area
0020
STORM WATER SYSTEM (WY)
Ordinary Manhole outside traffic area
0021
CONTAMINATED RAIN WATER SYSTEM (HY)
Catch basin
STORM WATER SYSTEM (WY)
Catch basin for half concrete Pipe channel SHEET 1/4
0026
0027
-
SANITARY SEWER (SAY)
Manhole
PP 1 - ANG - rev. 2
25/DEC/13
4
5
05/MAY/12
6
2
7
A
18/FEB/13
08/FEB/11
B
11/AUG/11
4
5
3
0
05/MAY/12
1
21/NOV/12
6
2
7
A
18/FEB/13
08/FEB/11
B
11/AUG/11
4
5
3
0
05/MAY/12
1
21/NOV/12
6
2
7
A
18/FEB/13
08/FEB/11
B
11/AUG/11
4
5
3
0
05/MAY/12
1
21/NOV/12
6
2
18/FEB/13
7
11/AUG/11
05/MAY/12
1
30/OCT/12
6
2
18/FEB/13
7
0
25/DEC/13
05/MAY/12
25/DEC/13
25/DEC/13
5
9
5
1
30/OCT/12
6
2
18/FEB/13
7
3
25/DEC/13
09/MAR/14
25/DEC/13
4
0
8
9
0
05/MAY/12
5
25/DEC/13
1
21/NOV/12
6
09/MAR/14
2
18/FEB/13
7
3
05/MAY/13
8
4
STORM WATER SYSTEM (WY)
Catch basin for half concrete Pipe channel SHEET 4/4
3
11/AUG/11
21/NOV/12
4
STORM WATER SYSTEM (WY)
Catch basin for half concrete Pipe channel SHEET 3/4
Date
0
3
STORM WATER SYSTEM (WY)
Catch basin for half concrete Pipe channel SHEET 2/4
08/FEB/11
R
e
v.
1
A
0022
Date
03/JUN/13
9
0
25/DEC/13
5
1
09/MAR/14
6
2
7
3
8
4
9
A
4
0
5
1
6
2
7
3
A
B
08/FEB/11
11/AUG/11
8
4
5
6
0
05/MAY/12
1
21/NOV/12
7
2
19/FEB/13
8
ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :
Seria
l n°
CLASS:1
Project N° - Unit
Doc Type
Material Code
Serial Number
Rev.
Page
9952T-000
STC
1490
0001
7
4/7
Description
Rev.
A
0035
0036
0037
0038
Date
08/FEB/11
STORM WATER SYSTEM (WY)
B
11/AUG/11
5
Desander for Standards ditches
0
05/MAY/12
6
1
21/NOV/12
7
2
24/FEB/13
8
-
-
-
A
4
0
5
1
6
2
7
3
8
A
4
0
5
1
6
2
7
3
8
A
4
0
5
1
6
2
7
3
A
0039
0040
0041
0042
0043
0044
PP 1 - ANG - rev. 2
R
e
v.
4
8
08/FEB/11
4
STORM WATER SYSTEM (WY)
B
11/AUG/11
5
Desander for standard ditch
0
05/MAY/12
6
1
21/NOV/12
7
2
24 /FEB /13
-
-
-
-
-
8
A
4
0
5
1
6
2
7
3
8
A
4
0
5
1
6
2
7
3
8
A
4
0
5
1
6
2
7
3
8
A
4
0
5
1
6
2
7
3
8
A
4
0
5
1
6
2
7
3
8
Date
ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :
CLASS:1
Project N° - Unit
Doc Type
Material Code
Serial Number
Rev.
Page
9952T-000
STC
1490
0001
7
5/7
Seria
l n°
Description
Rev.
A
R
e
v.
4
0046
-
0
5
1
6
2
7
0047
-
Date
3
8
A
4
0
5
1
6
2
7
3
8
4
25/DEC/13
STORM WATER SYSTEM (WY)
0
05/MAY/12
5
09/MAR/14
2 Stages manhole for 1000 to 1500 Dia. header
1
21/NOV/12
6
SHEET 1 / 2
2
19/FEB/13
7
25/DEC/13
09/MAR/14
25/DEC/13
6
A
0048
A
0049
5
STORM WATER SYSTEM (WY)
0
2 Stages manhole for 1000 to 1500 Dia. header
1
SHEET 2 / 2
2
8
3
8
9
A
4
DETAIL LADDER FOR CATCH-BASIN , MANHOLES
0
AND PITS
1
6
2
7
A
09/MAR/14
GRAVITY & PRESSURIZED SYSTEMS
B
11/AUG/11
5
0
05/MAY/12
6
1
21/NOV/12
7
2
19/FEB/13
8
5
4
STANDARDS RUNGS FOR MANHOLES, CATCH
0
03/JUN/13
BASIN AND VALVE PITS
1
25/DEC/13
3
A
08/FEB/11
FIRE SYSTEM (FW)
B
11/AUG/11
5
0
05/MAY/12
6
1
21/NOV/12
7
8
11/AUG/11
4
FIRE SYSTEM (FW)
0
05/MAY/12
5
Hose box and Guard post
1
21/NOV/12
6
2
7
3
A
FIRE SYSTEM (FW)
B
Fixed Water Monitor
8
08/FEB/11
4
11/AUG/11
5
0
05/MAY/12
6
1
21/NOV/12
2
A
PP 1 - ANG - rev. 2
8
4
Hydrant – Typical Installation
A
0054
6
7
2
0053
4
Standard Valve Pits
2
0052
5
8
08/FEB/11
A
0051
7
4
3
0050
Date
7
8
08/FEB/11
4
ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :
0055
CLASS:1
Project N° - Unit
Doc Type
Material Code
Serial Number
Rev.
Page
9952T-000
STC
1490
0001
7
6/7
FIRE SYSTEM (FW)
B
Monitor – Remote controlled
1
Cancelled
6
5
2
7
3
Seria
l n°
Description
Rev.
A
8
R
e
v.
4
0056
-
0
5
1
6
2
7
Date
3
A
0057
8
08/FEB/11
B
11/AUG/11
4
Safety Shower – Eyewash typical installation
0
05/MAY/12
5
1
21/NOV/12
FIRE WATER SYSTEM (FW)
0
Hose reel – Typical installation
1
4
05/MAY/12
6
7
3
8
4
FIRE WATER SYSTEM (FW)
0
05/MAY/12
5
Concrete trenchin paved area
1
Cancelled
6
2
09/MAR/14
7
3
A
8
08/FEB/11
B
11/AUG/11
4
For Electrical or Instrumentation Cables
0
05/MAY/12
5
1
21/NOV/12
A
CONDUITS UNDER PIPE-WAYS
B
For Electrical or Instrumentation Cables
08/FEB/11
Concrete cable trench in paved area Sheet :1
4
0
05/MAY/12
5
1
25/DEC/13
6
B
7
08/FEB/11
11/AUG/11
3
03/JUN/13
4
25/DEC/13
09/MAR/14
0
05/MAY/12
5
1
21/NOV/12
6
2
19/FEB/13
0
0062
3
11/AUG/11
A
ELECTRICAL OR INSTRUMENTATION
6
7
2
0062
3
ROAD CROSSING DUCT BANK
2
0061
5
2
A
0060
6
7
A
0059
3
DRINKING WATER SYSTEM (DW)
2
0058
09/MAR/14
7
3
ELECTRICAL OR INSTRUMENTATION
Precast Concrete cable trench in paved area Sheet: 2
A
0063
08/FEB/11
B
11/AUG/11
4
Detail of concrete cable trench
0
05/MAY/12
5
1
6
2
0064
PP 1 - ANG - rev. 2
3
ELECTRICAL OR INSTRUMENTATION
A
Date
7
11/AUG/11
4
ELECTRICAL OR INSTRUMENTATION
0
20/APR/12
5
Detail of direct buried cable trench
1
25/DEC/13
6
ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :
CLASS:1
Project N° - Unit
Doc Type
Material Code
Serial Number
Rev.
Page
9952T-000
STC
1490
0001
7
7/7
2
0065
7
3
8
A
4
-INSTRUMENTATION OPTIC FIBER TRENCH
0
05/MAY/12
5
Typical section and crossing
1
21/NOV/12
6
2
7
3
0073
TYPICAL PAVING DETAILS
8
A
08/FEB/11
3
B
11/AUG/11
4
0
05/MAY/12
5
1
09/MAR/14
6
2
A
0074
PAVING
B
LADDER FOUNDATION PAD
11/AUG/11
05/MAY/12
5
21/MAY/13
6
2
25/DEC/13
7
08/FEB/11
11/AUG/11
4
0
05/MAY/12
5
A
6
7
08/FEB/11
11/AUG/11
4
0
05/MAY/12
5
6
2
7
A
3
B
PP 1 - ANG - rev. 2
PIPES CROSSING THROUGH DYKE WALL
3
B
1
0077
3
B
2
STAIRWAY FOUNDATION PAD
28/JAN/14
09/MAR/14
0
1
0076
3
4
1
A
0075
7
08/FEB/11
0
4
05/MAY/12
5
1
6
2
7
2