ALGIERS REFINERY REHABILITATION AND ADAP

ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :

CLASS:1

Project N° - Unit

Doc Type

Material Code

Serial Number

Rev.

Page

9952T-000


STC

1490

0001

7

1/7

CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING

Pages modified under this revision:
STC 0022 Sheet 2 to 4 , STC 0048 Sheet 1 and 2 , New STC 0049 , STC 0059 , STC 0062 Sheet :1
New STC 0062 Sheet: 2 , STC 0073, STC 074,

Saïd Kabeche
2014.03.12

08:30:32 +01'00'

Boussaid
2014.03.12
09:23:22 +01'00'

IDIRI Mokrane
2014.03.12
11:42:43 +01'00'

7

09/MAR/14

IFC-ISSUE FOR CONSTRUCTION

S.KABECHE

O.BOUSSAID


M.IDIRI

6

28/JAN/14

IFC-ISSUE FOR CONSTRUCTION

S.KABECHE

O.BOUSSAID

M.IDIRI

5

25/DEC/13

IFC-ISSUE FOR CONSTRUCTION


S.KABECHE

A.DJELOUAH

M.IDIRI

4

03/JUN/13

IFC-ISSUE FOR CONSTRUCTION

S.GUENNEGAN

M.LONG

F.OUDJHARA

3


21/MAY/13

IFC-ISSUE FOR CONSTRUCTION

S.GUENNEGAN

M.LONG

F.OUDJHARA

2

25/FEB/13

IFC-ISSUE FOR CONSTRUCTION

O.BOUSSAID

S.KABECHE


M. IDIRI

1

21/NOV/12

IFC-ISSUE FOR CONSTRUCTION

B.VEZMAR

C.VENARD

C.VENARD

0

05/MAY/12

IFC-ISSUE FOR CONSTRUCTION


B.VEZMAR

C.VENARD

C.VENARD

B

11/AUG/11

IFA-ISSUE FOR APPROVAL

B.VEZMAR

C.VENARD

C.VENARD

A


08/FEB/11

IFA-ISSUE FOR APPROVAL

M-SAMER

C-VENARD

M-IDIRI

Rev

Date
DD/MMM/YY

STATUS

WRITTEN BY
(name & visa)


CHECKED BY
(name & visa)

APPROVED BY
(name & visa)

DOCUMENT REVISIONS
Sections changed in last revision are identified by a vertical line in the margin

PP 1 - ANG - rev. 2

ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :

CLASS:1

Project N° - Unit


Doc Type

Material Code

Serial Number

Rev.

Page

9952T-000

STC

1490

0001

7


2/7

CONSTRUCTION STANDARDS – SITE ARRANGEMENT – UNDERGROUND PIPING

Date

Serial n°

Description

Rev.
A

08/FEB/11

0002

SYMBOLS AND ABBREVIATIONS FOR CIVIL WORK

0

05/MAY/12

0010

FLOOR DRAIN FOR SMALL PAVED AREAS
Installation of ductile iron trap

2
3
A

7
8
4

B

11/AUG/11

5

0

05/MAY/12

6

1
A

0012

0013

OILY WATER AND CONTAMINATED RAIN WATER

7

B

8
08/FEB/11

4
5

0

05/MAY/12

SYSTEM SY & HY ( Ø ≤ 20” )

1

21/NOV/12

6

Manhole with or without submerged connection

2

7

A

18/FEB/13
08/FEB/11

OILY WATER AND CONTAMINATED RAIN WATER

B

11/AUG/11

5
6

0

05/MAY/12

1

30/OCT/12

7

Fire Trap Double compartment Manhole

2

8

A

18/FEB/13
08/FEB/11

CLEAN-OUT

B

11/AUG/11

4

Cast iron or steel system

0

05/MAY/12

A
PURGE RECOVERY – PRESSURE SUPPLY
Typical installation

0017

B

11/AUG/11

5

05/MAY/12

6

1

21/NOV/12

PP 1 - ANG - rev. 2

HYDRAULIC SEALS

B

22°30 Submerged Connection - Steel system

-

4

0

A

VENTS FOR MANHOLES

5
7

2

0016

3

6
08/FEB/11

7
8

08/FEB/11

25/DEC/13

4

SYSTEM SY & HY ( Ø > 20” )

2

0015

3

11/AUG/11

1

0014

5
6

08/FEB/11

Date

4

1

2
0011

R
e
v.

4

11/AUG/11

5

0

05/MAY/12

6

1

21/NOV/12

7

2

8

A

25/DEC/13
08/FEB/11

B

11/AUG/11

5

4

0

05/MAY/12

6

1

25/DEC/13

7

2

8

A

4

0

5

1

6

2

7

3

8

25/DEC/13

ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :

CLASS:1

Project N° - Unit

Doc Type

Material Code

Serial Number

Rev.

Page

9952T-000

STC

1490

0001

7

3/7

Seria
l n°

Description

Rev.

0018

STORM WATER SYSTEM (WY)

B

A
Ditch water catch Basin

0019

STORM WATER SYSTEM (WY)
Manhole in traffic area

0020

STORM WATER SYSTEM (WY)
Ordinary Manhole outside traffic area

0021

CONTAMINATED RAIN WATER SYSTEM (HY)
Catch basin

STORM WATER SYSTEM (WY)
Catch basin for half concrete Pipe channel SHEET 1/4

0026

0027

-

SANITARY SEWER (SAY)
Manhole

PP 1 - ANG - rev. 2

25/DEC/13

4
5

05/MAY/12

6

2

7

A

18/FEB/13
08/FEB/11

B

11/AUG/11

4
5

3

0

05/MAY/12

1

21/NOV/12

6

2

7

A

18/FEB/13
08/FEB/11

B

11/AUG/11

4
5

3

0

05/MAY/12

1

21/NOV/12

6

2

7

A

18/FEB/13
08/FEB/11

B

11/AUG/11

4
5

3

0

05/MAY/12

1

21/NOV/12

6

2

18/FEB/13

7

11/AUG/11
05/MAY/12

1

30/OCT/12

6

2

18/FEB/13

7

0

25/DEC/13
05/MAY/12

25/DEC/13

25/DEC/13

5

9
5

1

30/OCT/12

6

2

18/FEB/13

7

3

25/DEC/13
09/MAR/14

25/DEC/13

4

0

8
9

0

05/MAY/12

5

25/DEC/13

1

21/NOV/12

6

09/MAR/14

2

18/FEB/13

7

3

05/MAY/13

8

4
STORM WATER SYSTEM (WY)
Catch basin for half concrete Pipe channel SHEET 4/4

3

11/AUG/11
21/NOV/12

4
STORM WATER SYSTEM (WY)
Catch basin for half concrete Pipe channel SHEET 3/4

Date

0

3
STORM WATER SYSTEM (WY)
Catch basin for half concrete Pipe channel SHEET 2/4

08/FEB/11

R
e
v.

1

A
0022

Date

03/JUN/13

9

0

25/DEC/13

5

1

09/MAR/14

6

2

7

3

8

4

9

A

4

0

5

1

6

2

7

3
A
B

08/FEB/11
11/AUG/11

8
4
5
6

0

05/MAY/12

1

21/NOV/12

7

2

19/FEB/13

8

ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :

Seria
l n°

CLASS:1

Project N° - Unit

Doc Type

Material Code

Serial Number

Rev.

Page

9952T-000

STC

1490

0001

7

4/7

Description

Rev.
A

0035

0036

0037

0038

Date
08/FEB/11

STORM WATER SYSTEM (WY)

B

11/AUG/11

5

Desander for Standards ditches

0

05/MAY/12

6

1

21/NOV/12

7

2

24/FEB/13

8

-

-

-

A

4

0

5

1

6

2

7

3

8

A

4

0

5

1

6

2

7

3

8

A

4

0

5

1

6

2

7

3
A
0039

0040

0041

0042

0043

0044

PP 1 - ANG - rev. 2

R
e
v.
4

8
08/FEB/11

4

STORM WATER SYSTEM (WY)

B

11/AUG/11

5

Desander for standard ditch

0

05/MAY/12

6

1

21/NOV/12

7

2

24 /FEB /13

-

-

-

-

-

8

A

4

0

5

1

6

2

7

3

8

A

4

0

5

1

6

2

7

3

8

A

4

0

5

1

6

2

7

3

8

A

4

0

5

1

6

2

7

3

8

A

4

0

5

1

6

2

7

3

8

Date

ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :

CLASS:1

Project N° - Unit

Doc Type

Material Code

Serial Number

Rev.

Page

9952T-000

STC

1490

0001

7

5/7

Seria
l n°

Description

Rev.
A

R
e
v.
4

0046

-

0

5

1

6

2

7

0047

-

Date

3

8

A

4

0

5

1

6

2

7

3

8
4

25/DEC/13

STORM WATER SYSTEM (WY)

0

05/MAY/12

5

09/MAR/14

2 Stages manhole for 1000 to 1500 Dia. header

1

21/NOV/12

6

SHEET 1 / 2

2

19/FEB/13

7

25/DEC/13
09/MAR/14
25/DEC/13

6

A
0048

A

0049

5

STORM WATER SYSTEM (WY)

0

2 Stages manhole for 1000 to 1500 Dia. header

1

SHEET 2 / 2

2

8

3

8
9

A

4

DETAIL LADDER FOR CATCH-BASIN , MANHOLES

0

AND PITS

1

6

2

7

A

09/MAR/14

GRAVITY & PRESSURIZED SYSTEMS

B

11/AUG/11

5

0

05/MAY/12

6

1

21/NOV/12

7

2

19/FEB/13

8
5

4

STANDARDS RUNGS FOR MANHOLES, CATCH

0

03/JUN/13

BASIN AND VALVE PITS

1

25/DEC/13

3
A

08/FEB/11

FIRE SYSTEM (FW)

B

11/AUG/11

5

0

05/MAY/12

6

1

21/NOV/12

7
8

11/AUG/11

4

FIRE SYSTEM (FW)

0

05/MAY/12

5

Hose box and Guard post

1

21/NOV/12

6

2

7

3
A
FIRE SYSTEM (FW)

B

Fixed Water Monitor

8
08/FEB/11

4

11/AUG/11

5

0

05/MAY/12

6

1

21/NOV/12

2
A
PP 1 - ANG - rev. 2

8
4

Hydrant – Typical Installation

A

0054

6
7

2
0053

4

Standard Valve Pits

2

0052

5

8
08/FEB/11

A
0051

7

4

3
0050

Date

7
8

08/FEB/11

4

ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :

0055

CLASS:1

Project N° - Unit

Doc Type

Material Code

Serial Number

Rev.

Page

9952T-000

STC

1490

0001

7

6/7

FIRE SYSTEM (FW)

B

Monitor – Remote controlled

1

Cancelled

6

5

2

7

3
Seria
l n°

Description

Rev.
A

8
R
e
v.
4

0056

-

0

5

1

6

2

7

Date

3
A
0057

8
08/FEB/11

B

11/AUG/11

4

Safety Shower – Eyewash typical installation

0

05/MAY/12

5

1

21/NOV/12

FIRE WATER SYSTEM (FW)

0

Hose reel – Typical installation

1

4
05/MAY/12

6
7

3

8
4

FIRE WATER SYSTEM (FW)

0

05/MAY/12

5

Concrete trenchin paved area

1

Cancelled

6

2

09/MAR/14

7

3
A

8
08/FEB/11

B

11/AUG/11

4

For Electrical or Instrumentation Cables

0

05/MAY/12

5

1

21/NOV/12

A
CONDUITS UNDER PIPE-WAYS

B

For Electrical or Instrumentation Cables

08/FEB/11

Concrete cable trench in paved area Sheet :1

4

0

05/MAY/12

5

1

25/DEC/13

6

B

7
08/FEB/11
11/AUG/11

3

03/JUN/13

4

25/DEC/13
09/MAR/14

0

05/MAY/12

5

1

21/NOV/12

6

2

19/FEB/13

0
0062

3

11/AUG/11

A
ELECTRICAL OR INSTRUMENTATION

6
7

2
0062

3

ROAD CROSSING DUCT BANK

2
0061

5

2
A

0060

6
7

A

0059

3

DRINKING WATER SYSTEM (DW)

2
0058

09/MAR/14

7
3

ELECTRICAL OR INSTRUMENTATION
Precast Concrete cable trench in paved area Sheet: 2

A
0063

08/FEB/11

B

11/AUG/11

4

Detail of concrete cable trench

0

05/MAY/12

5

1

6

2
0064

PP 1 - ANG - rev. 2

3

ELECTRICAL OR INSTRUMENTATION

A

Date

7
11/AUG/11

4

ELECTRICAL OR INSTRUMENTATION

0

20/APR/12

5

Detail of direct buried cable trench

1

25/DEC/13

6

ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
CONSTRUCTION STANDARDS
SITE ARRANGEMENT – UNDERGROUND PIPING
Document Class :

CLASS:1

Project N° - Unit

Doc Type

Material Code

Serial Number

Rev.

Page

9952T-000

STC

1490

0001

7

7/7

2

0065

7

3

8

A

4

-INSTRUMENTATION OPTIC FIBER TRENCH

0

05/MAY/12

5

Typical section and crossing

1

21/NOV/12

6

2

7

3
0073

TYPICAL PAVING DETAILS

8

A

08/FEB/11

3

B

11/AUG/11

4

0

05/MAY/12

5

1

09/MAR/14

6

2
A
0074

PAVING

B

LADDER FOUNDATION PAD

11/AUG/11
05/MAY/12

5

21/MAY/13

6

2

25/DEC/13

7

08/FEB/11
11/AUG/11

4

0

05/MAY/12

5

A

6
7
08/FEB/11
11/AUG/11

4

0

05/MAY/12

5
6

2

7

A

3

B

PP 1 - ANG - rev. 2

PIPES CROSSING THROUGH DYKE WALL

3

B
1

0077

3

B

2
STAIRWAY FOUNDATION PAD

28/JAN/14
09/MAR/14

0

1

0076

3
4

1
A
0075

7
08/FEB/11

0

4
05/MAY/12

5

1

6

2

7

2