Lampiran III Analisa Daftar Kuantitas dan Harga 3

Lampiran III RKS no. 30/LL/NONSAR/KCI/II/2018 tanggal 27 Februari 2018
PEKERJAAN BANGUNAN EDUKASI DIPO DEPOK
ANALISA HARGA BANGUNAN EDUKASI DEPO KRL DEPOK

1

1 m2 Pembuatan bedeng
Bahan
1,25000 Btg
0,18600 m3
0,30000 kg
18,00000 kg
0,03000 m3
0,05000 m3
1,50000 Lbr
1,35000 Lbr

Dolken kayu Ø 8-10 / 400 cm
Kayu Meranti Terentang/Meranti
Paku biasa 2" - 5 "
Semen Portland

Pasir beton
Koral beton
Seng gelombang bljs 32
Multipleks 9 mm

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

=
=

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Upah

2

3

4


5

6

2,00000
1,00000
0,20000
0,05000

Oh
Oh
Oh
Oh

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

@ Rp.

@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

1,00000
1,00000
1,00000
1,00000

bh
bh
bh
bh

rompi spotlight
helm
safety shoes
Sarung Tangan


Rp.
Rp.
Rp.
Rp.
Sub total :
Dibulatkan :

Saftey APD
Bahan

Transportasi Alat dan pekerja/hari
Upah
1,00000 hr
Sewa Pick Up

Listrik TDR PLN
Upah
3,50000 Kva Listrik TDR-PLN


1 m2 Pembersihan Lapangan dan Peralatan
Upah
0,10000 Oh Pekerja
0,05000 Oh Mandor

BONGKAR PAVING EXSISTING/M2
Upah.
0,16000 oh Pekerja
0,05000 oh Tukang batu
0,00500 oh Kepela tukang batu
0,00750 oh Mandor

=
=
=
=
=
=

Rp.

Rp.
Rp.
Rp.
Rp.
Rp

@ Rp.
Sub total :
Dibulatkan :

=
=
=

Rp
Rp
Rp

@ Rp.
Dibulatkan :


=
=

Rp
Rp

=
=
=
=

Rp
Rp
Rp
Rp

=
=
=

=

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
Sub total :
Dibulatkan :

@ Rp.
@ Rp.
@ Rp.
@ Rp.

Lampiran III RKS no. 30/LL/NONSAR/KCI/II/2018 tanggal 27 Februari 2018

7


BONGKARAN TAMAN M2
Upah.
0,16000 oh Pekerja
0,05000 oh Tukang batu
0,00500 oh Kepela tukang batu
0,00750 oh Mandor

10 Sewa alat bantu scafoldhing
Bahan
2,00000 bh Main Frame 190 cm
2,00000 bh Crose Brase 190 cm
4,00000 bh Join Pint
1 unit scafolding 1 x
1,00000 bh Cat Walk
4,00000 bh Roller Catter / roda

11 1 m2 Bongkaran dinding tembok bata merah
Upah
0,25000 Oh Pekerja
0,03300 Oh Mandor

12 1 m2 Pek.Bongkaran Partisi, Plafond, Jendela Kaca, Pintu Kaca, Dll
Upah
0,25000 Oh Pekerja
0,03300 Oh Mandor

13 1 m2 Bongkaran lantai kramik
Upah
0,15000 Oh Pekerja
0,03300 Oh Mandor

14 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
Bahan
70,0000 Bh Bata merah 5 x 11 x 22 cm
14,3700 Kg Semen portland
0,0400 m3 Pasir pasang

Sub Total :
Dibulatkan :

= Rp.
= Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub Total :
Dibulatkan :

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub Total :
Dibulatkan :

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=

Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=

Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=

Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

@ Rp.

=

Rp

Upah
0,3200 Oh

Pekerja

Lampiran III RKS no. 30/LL/NONSAR/KCI/II/2018 tanggal 27 Februari 2018

0,1000 Oh
0,0100 Oh
0,0150 Oh

Tukang batu
Kepala tukang
Mandor

15 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 15 mm
Bahan
6,4800 Kg Semen portland
0,0190 m3 Pasir pasang

@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=

Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Upah
0,2000
0,1500
0,0150
0,0100

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

16 1 m2 Pasang Sekat Dinding gypsum rangka metalstud/baja ringan
Bahan
0,4000 Lbr Gypsum board ( 120x240x9 mm )
0,6700 ljr Truss C75.75 SNI BMT
0,0500 Kg Paku Skrup gypsum
0,4000 Kg kompon gypsum

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total 1 Sisi
Dua Sisi ( x 2 )
Dibulatkan

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total
Dibulatkan

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Upah
0,1000
0,0500
0,0050
0,0050

Oh
Oh
Oh
Oh

Pekerja
Tukang
Kepala tukang
Mandor

17 1 m2 Pasang plafon gypsum rangka metalstud/baja ringan
Bahan
0,4000 Lbr Gypsum board ( 120x240x9 mm )
0,6700 Btg Truss C75.75 SNI BMT
0,0500 Kg Skrup gypsum
0,4000 Kg kompon gypsum

Upah
0,1000
0,0500
0,0050
0,0050

Oh
Oh
Oh
Oh

Pekerja
Tukang
Kepala tukang
Mandor

18 1 Bh. Pasang pintu aluminium 3" putih ( Silver) UKURAN 0.80 X 2.00 Mtr.

Lampiran III RKS no. 30/LL/NONSAR/KCI/II/2018 tanggal 27 Februari 2018
( pintu isian kaca bening 5mm dan multipleks 9 mm).
Bahan
6,2500 M1 Slimar Aluminium putih 3"
@ Rp.
15,0000 M1 Karet penjepit kaca/ tripleks.
@ Rp.
1,0000 set Engsel
@ Rp.
1,0000 Bh Kunci
@ Rp.
1,3400 M2 Kaca bening 5 mm
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

19 1M2 Pasang daun jendela aluminium 3" putih ( Silver) UKURAN 1.00 X 1.00 Mtr.
( Jendela isian kaca 5mm).
Bahan
4,8000 M1 Slimar Aluminium putih 3"
@ Rp.
8,5000 M1 Karet penjepit kaca.
@ Rp.
1,0000 set Engsel jendela.
@ Rp.
1,0000 Bh Hak window.
@ Rp.
0,9025 M2 Kaca bening 5 mm
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Upah

Upah

1,4175
1,4175
0,1418
0,0070

1,0500
1,0500
0,1050
0,0052

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

20 Partisi Lipat Kaca / M2
Bahan
12,0000 m
1,7500 m2
1,8000 m2
8,0000 m1
1,0000 Psg
1,0000 m1
6,4000 m1
1,0000 Set
1,0000 Bh

Upah

1,4175
1,4175
0,1418
0,0070

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang besi
Mandor

Pekerja
Tukang besi
Kepala tukang besi
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub Total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Rangka besi Holo 40x40
Kaca Bening 8 mm
Rockwool peredam
List edging alumunium
Roda
Rel bagian atas
Karet penjepit kaca
Alat bantu penggantung rel atas
Pengunci pintu

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp

Pekerja
Tukang besi
Kepala tukang besi
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
Sub total :
Dibulatkan :

=
=
=

Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.

=
=
=
=

Rp
Rp
Rp
Rp

21 1 M' Pasang kusen aluminium 4" putih. (Silver)
Bahan
1,1000 m
Aluminium putih 4".

Upah

0,1040
0,1040
0,0010
0,0005

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang besi
Mandor

Lampiran III RKS no. 30/LL/NONSAR/KCI/II/2018 tanggal 27 Februari 2018
Sub total :
Dibulatkan :

=
=

Rp
Rp

@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=

Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Kaca Sticker

@ Rp.
Dibulatkan :

=
=

Rp
Rp

Pekerja
Tukang besi
Kepala tukang besi
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Pekerja
Tukang batu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

List profil kamper 4x1 cm
Paku

@ Rp.
@ Rp.
Sub total :

=
=
=

Rp
Rp
Rp

22 1M2 Pasang Kaca Bening Tebal 8 mm
Bahan
8,5000 M1 Karet penjepit kaca.
0,9025 M2 Kaca bening 8 mm

Upah

0,1040
0,1040
0,0010
0,0001

Oh
Oh
Oh
Oh

23 1 m2 Pasang Sand Blast
Bahan
1,10000 m2

Upah

0,01500
0,15000
0,01500
0,00075

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang besi
Mandor

/ Kaca Sticker

24 1 m2 Pasang GRANIT 60 x 60 cm
Bahan
1,0500 m2 GRANIT 60 x 60 Cm
1,0625 Kg Semen portland
0,0028 Kg Kapur bubuk
0,0420 m3 Pasir pasang
0,2000 Kg Semen warna

Upah
0,2200
0,1000
0,0120
0,0125

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

25 1 m2 Pasang Granit uk 60x20 cm standar / Lis / Ban
Bahan
1,0000 m2 Granit 60x20 Standar cm
1,0625 Kg Semen portland
0,0028 m3 Pasir pasang
0,1000 Kg Semen warna

Upah
0,0900
0,0900
0,0090
0,0045

Oh
Oh
Oh
Oh

26 1 m' Pasang list gypsum
Bahan
1,1000 m
0,0100 Kg

Lampiran III RKS no. 30/LL/NONSAR/KCI/II/2018 tanggal 27 Februari 2018
Dibulatkan :

=

Rp

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Upah
0,0500
0,0500
0,0050
0,0030

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

27 1 m2 Pengecatan tembok Lama ( Ngamplas, 1x cat dasar, 2x cat penutup )
Bahan
0,0100 Kg Plamir
@ Rp.
0,1200 Lbr Ampelas
@ Rp.
0,0333 Bh Kuwas / roll
@ Rp.
0,1100 Kg Cat dasar ( Tembok )
@ Rp.
0,2200 Kg Cat penutup 2x ( Tembok )
@ Rp.
Sub total :
Dibulatkan :

Watershild
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=

Rp
Rp
Rp
Rp

Upah
0,0280
0,0420
0,0042
0,0025

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala tukang
Mandor

.

28 1 m3
Upah

Galian Untuk Tanah Biasa sedalam 2 m
0,52600 Oh Pekerja
0,05200 Oh Mandor

29 1 m3
Bahan

Urugan Tanah
1,20000 m3

Tanah Merah

0,19200 Oh
0,01900 Oh

Pekerja
Mandor

@ Rp.
Sub total :
Dibulatkan :

=
=
=

Rp
Rp
Rp

Upah

30 1 m3
Bahan

@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=

Rp
Rp
Rp
Rp

Urugan pasir dengan pasir urug.
1,20000 m3

Pasir urug

@ Rp.
Sub total :
Dibulatkan :

=
=
=

Rp
Rp
Rp

0,30000 Oh
0,01000 Oh

Pekerja
Mandor

@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=

Rp
Rp
Rp
Rp

@ Rp.
Dibulatkan :

=
=

Rp
Rp

Upah

31 Sewa Stamper Untuk Pemadatan/hari
Upah
1,0000 hr
Stamper

Lampiran III RKS no. 30/LL/NONSAR/KCI/II/2018 tanggal 27 Februari 2018

32 1 m3
Upah

Pemadatan tanah
0,5000 Oh
0,0500 Oh

Pekerja
Mandor

33 1 m3 Membuat beton bertulang 150 Kg besi + bekisting
Bahan
0,2000 m3 Kayu terentang/Meranti 5/7
1,5000 Kg Paku biasa 2" - 5"
0,4000 Ltr Minyak bekisting
150,0000 Kg Besi beton polos D 12
2,2500 Kg Kawat bendrat
323,0000 Kg Semen portland
0,5200 m3 Pasir beton
0,7800 m3 Koral beton

@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=

Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=

Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Upah
3,9000
0,3500
1,0400
1,0500
0,2450
0,1650

Oh
Oh
Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

34 1 m3 Pasang pondasi batu kali 1 Pc : 3 Ps
Bahan
1,1000 m3 Batu belah ( 15/20 )
202,0000 Kg Semen porland
0,4850 m3 Pasir pasang

Upah
1,5000
0,6000
0,0600
0,0750

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

35 Memasang 1 m pipa PVC Rucika 4"
Bahan
1,2000 m
Pipa PVC Rucika 4"
35,0000 % Perlengkapan

Upah
0,0810
0,1350
0,0135
0,0041

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

Lampiran III RKS no. 30/LL/NONSAR/KCI/II/2018 tanggal 27 Februari 2018
36 Memasang 1 buah floor drain
Bahan
1,00000 Bh Floor drain toto TX 1 AN
@ Rp.
Sub total :
Dibulatkan :

=
=
=

Rp
Rp
Rp

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Upah
0,01000
0,10000
0,01000
0,00500

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

37 Pasang pipa besi 3" untuk cremona Dan Gording
Bahan
1,1000 m1 Pasang pipa Besi 3"

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

@ Rp.
Sub total :
Dibulatkan :

=
=
=

Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
Sub total :
Dibulatkan :

=
=
=

Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=

Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
Sub total :
Dibulatkan :

=
=
=

Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Upah.
0,0700
0,0700
0,0070
0,0030

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang
Mandor

38 Pasang pipa besi 6" untuk Batang Join
Bahan
1,1000 m1 Pasang pipa Besi 6"

Upah.
0,0700
0,0700
0,0070
0,0030

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang
Mandor

39 Pasang pipa besi 6" untuk Batang Kuda Kuda Lengkung + Bending
Bahan
1,1000 m1 Pasang pipa Besi 6"
1,1000 m1 Jasa Bending Pipa Besi 6"

Upah.
0,0700
0,0700
0,0070
0,0030

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang
Mandor

40 Pasang pipa besi 8" untuk Tiang Utama
Bahan
1,1000 m1 Pasang pipa Besi 8"

Upah.
0,0700
0,0700
0,0070
0,0030

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang
Mandor

Lampiran III RKS no. 30/LL/NONSAR/KCI/II/2018 tanggal 27 Februari 2018
41 Pasang pipa besi 10" untuk Tiang Utama ( Bentangan 14 m )
Bahan
1,1000 m1 Pasang pipa Besi 10"

@ Rp.
Sub total :
Dibulatkan :

=
=
=

Rp
Rp
Rp

Pekerja
Tukang besi
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Plat Besi

@ Rp.
Sub total :
Dibulatkan :

=
=
=

Rp
Rp
Rp

Pekerja
Tukang besi
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Sub total :
Dibulatkan :

=
=
=

Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Sub total :
Dibulatkan :

=
=
=

Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=

Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.

=
=
=
=

Rp
Rp
Rp
Rp

Upah.
0,0700
0,0700
0,0070
0,0030

Oh
Oh
Oh
Oh

42 Pasang Plat Besi
Bahan
1,1000 Kg

Upah.
0,0060
0,0600
0,0060
0,0003

Oh
Oh
Oh
Oh

43 Pasang Baut M16 x 60 mm
Bahan
1,0000 Bh Baut M16 x 60 mm

Upah.
0,0060
0,0600
0,0060
0,0003

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang
Mandor

44 Pasang Angkur D 19 Panjang 60 cm
Bahan
1,0000 Bh Angkur D 19 Panjang 60 cm

Upah.
0,0060
0,0600
0,0060
0,0003

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang
Mandor

45 1 m2 Pasang atap spandex
Bahan
1,1000 Lbr Spandek
0,0500 Kg paku sekrup

Upah
0,1000
0,0500
0,0050
0,0050

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala tukang
Mandor

Lampiran III RKS no. 30/LL/NONSAR/KCI/II/2018 tanggal 27 Februari 2018

46 Pengelasan Las Listrik Untuk Tiap 10 cm / Titik
Bahan
0,4000 Kg Kawat Las

Sub total :
Dibulatkan :

=
=

Rp
Rp

@ Rp.
Sub total :
Dibulatkan :

=
=
=

Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Upah
0,0400 Oh
0,0200 Oh
0,0020 Oh

Pekerja
Tukang Las
Mandor

47 1 m Pasang talang datar rangka hollow, seng bjls 30
Bahan
0,5000 Lbr Seng plat
0,0150 Kg Paku Skrup
1,2000 btg Hollow 40 x 40

Upah
0,1500
0,4000
0,0250
0,0013

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala tukang
Mandor

48 1m2 wiremesh M6
Bahan
1,0500 m2
0,0150 kg

wermesh M8
Kawat Bendrat

@ Rp.
@ Rp.
Sub total :
Dibulatkan

=
=
=
=

Rp
Rp
Rp
Rp

Pekerja
Tukang besi
Kepala tukang
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.

=
=
=
=

Rp
Rp
Rp
Rp

Upah
0,0070
0,0070
0,0007
0,0003

Oh
Oh
Oh
Oh

49 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
Bahan
232,0000 Kg Semen portland
0,5200 m3 Pasir beton
0,8700 m3 Koral beton

Upah
1,6500
0,2500
0,0250
0,0800

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

Lampiran III RKS no. 30/LL/NONSAR/KCI/II/2018 tanggal 27 Februari 2018
Sub total :
Dibulatkan
50 Sewa Concrete Pump 30-50 meter / Hari
Upah
1,0000 hr
Concrete Pump

51 1 m Buat railing stainless stell ( Non Destabilitas )
Bahan
1,0000 m
Railing stainless stell T 2"x1,5
10,0000 %
bahan Perlengkapan

=
=

Rp
Rp

@ Rp.
Dibulatkan

=
=

Rp
Rp

@ Rp.
@ Rp.
Sub total :
dibulatkan

=
=
=
=

Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
dibulatkan

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan :

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

=
=
=
=

Rp
Rp
Rp
Rp

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

Upah
0,3250
0,3250
0,0325
0,0160

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala tukang
Mandor

52 1 m2 Pengecatan bidang besi
Bahan
0,1500 lbr Amplas
0,2000 kg Cat meni
0,1500 Ltr Minyak cat
0,0300 Kg Kuas
0,1700 Kg Cat dasar
0,2600 Kg Cat penutup 2 x

Upah
0,0700
0,0090
0,0060
0,0025

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala tukang
Mandor

.

53 Pemasangan Instalasi kabel Power dengan kabel NYRGBY 4x25 mm
Bahan
1,00000 m Kabel NYRGBY 4x25 mm
@ Rp.
5,00000 % Perlengkapan instalasi
@ Rp.
Sub total :
Dibulatkan
Upah
0,04570 Oh Pembantu tukang listrik
@ Rp.
0,04570 Oh Tukang listrik
@ Rp.
0,00910 Oh Kepala tukang istrik
@ Rp.
0,00300 Oh Mandor
@ Rp.
Sub total :
Dibulatkan
54 Memasang Panel Unit uk.800X600X200
Bahan
1,00000 bh Panel Unit uk.800x600x200
1,00000 bh MCCB 3 Kutub 75 amp
1,00000 bh MCCB 3 Kutub 25 amp
13,00000 bh MCB 1 Kutub 16 amp
8,00000 bh MCB 1 Kutub 10 amp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

Rp
Rp
Rp

Lampiran III RKS no. 30/LL/NONSAR/KCI/II/2018 tanggal 27 Februari 2018
9,00000 bh MCB 1 Jutub 6 amp
@ Rp.
6,00000 bh MCB 1 Kutub 4 amp
@ Rp.
( 2 MCB untuk timer )
@ Rp.
2,00000 bh MCB 1 Kutub 6 amp
@ Rp.
( 2 MCB untuk Timer )
@ Rp.
1,00000 bh Timer theben sul 181 coil 220v
@ Rp.
1,00000 bh Kontaktor 25 ampere coil 220v
@ Rp.
4,00000 bh MCB 1 Kutub 2 amp Control
@ Rp.
4,00000 bh Pilot Lamp 220 v
@ Rp.
10,00000 m Kabel NYAF 1x16 mm
@ Rp.
1,00000 Unit Ampere volt digital 230/440 volt
@ Rp.
3,00000 bh CT 150/5 amp
@ Rp.
5,00000 % Perlengkapan wairing panel
@ Rp.
Sub total :
Dibulatkan

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

Upah
2,00000
2,00000
1,00000

55 Pemasangan Instalasi
Bahan
1,00000
0,10000
5,00000

Oh Pembantuk tukang listrik
Oh Tukang listrik/Pembatu Instalator
Oh Kepala tukang istrik/Instalator

@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan

kabel Power dengan kabel NYRGBY 4x10 mm
m Kabel NYRGBY 4x10 mm
Set Sambungan Kabel Recin
% Perlengkapan instalasi

@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

Oh
Oh
Oh
Oh

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Upah
0,04570
0,04570
0,00910
0,00300

56 Pemasangan Instalasi
Bahan
1,00000
0,33333
0,03000
0,03000
5,00000

Pembantu tukang listrik
Tukang listrik
Kepala tukang istrik
Mandor

kabel lampu penerangan dengan kabel NYM 4x2,5 mm
m
btg
bh
bh
%

Kabel NYM 4x2,5 mm
Conduit pipa dia. 25 pj 3m
Sok pipa clipsal 25 mm
Klem pipa 25 mm
Perlengkapan instalasi

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Oh
Oh
Oh
Oh

Pembantu tukang listrik
Tukang listrik
Kepala tukang istrik
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

Upah
0,04570
0,04570
0,00910
0,00300

57 Pemasangan Instalasi
Bahan
8,00000
2,67000
5,00000

Upah

stop kontak dan saklar dengan kabel NYM 3x2,5 mm
m Kabel NYM 3x2,5 mm
btg Conduit pipa dia. 25 pj 3m
% Perlengkapan instalasi

@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan

Lampiran III RKS no. 30/LL/NONSAR/KCI/II/2018 tanggal 27 Februari 2018
0,29629 Oh Pembantu tukang listrik
@ Rp.
0,29629 Oh Tukang listrik
@ Rp.
0,05920 Oh Kepala tukang istrik
@ Rp.
0,03365 Oh Mandor
@ Rp.
Sub total :
Dibulatkan
58 Pemasangan Lampu Dengan Lampu T8 termasuk balak 18 watt
Bahan
1,00000 bh Led T8 18 watt
1,00000 m Kabel Nym 3x2,5 mm
1,00000 bh T dus 20 mm
0,33000 bt Pipa Clipsal 25 mm
1,00000 bh Balak T8 18w
5,00000 % Perlengkapan instalasi

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan

=
=
=

Rp
Rp
Rp

=
=
=
=

Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Upah
0,29629
0,29629
0,05920
0,03365

Oh
Oh
Oh
Oh

Pembantu tukang listrik
Tukang listrik
Kepala tukang istrik
Mandor

59 Pemasangan Lampu Gantung Industri engel 120 daya 85 watt satandar philips lumen 11000 ip 65 kabel NYM 3x2,5 mm
Bahan
1,00000 bh Lampu Gantung LED 85 watt
@ Rp.
= Rp
1,00000 bh Breacket led 110
@ Rp.
= Rp
1,00000 m Kabel Nym 3x2,5 mm
@ Rp.
= Rp
1,00000 bh T doos 25 mm
@ Rp.
= Rp
0,33000 bt Pipa Clipsal 25 mm
@ Rp.
= Rp
5,00000 % Perlengkapan instalasi
@ Rp.
= Rp
Sub total :
= Rp
Dibulatkan
= Rp
Upah
0,29629
0,29629
0,05920
0,03365

Oh
Oh
Oh
Oh

Pembantu tukang listrik
Tukang listrik
Kepala tukang istrik
Mandor

60 Memasang Saklar engkel
Bahan
1,00000 bh Saklar engkel neon pieno putih
5,00000 % Perlengkapan instalasi

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Dibulatkan

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
Sub total
Dibulatkan

=
=
=
=

Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total
Dibulatkan

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
Sub total

=
=
=

Rp
Rp
Rp

Upah
0,03200
0,03200
0,00411
0,00160

Oh
Oh
Oh
Oh

Pembantu tukang listrik
Tukang listrik
Kepala tukang istrik
Mandor

61 Memasang Stop Kontak daya
Bahan
1,00000 bh Stop kontak Pieno Putih
5,00000 % Perlengkapan instalasi

Lampiran III RKS no. 30/LL/NONSAR/KCI/II/2018 tanggal 27 Februari 2018
Dibulatkan

=

Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total
Dibulatkan

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
Sub total
Dibulatkan

=
=
=
=

Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total
Dibulatkan

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
Sub total
Dibulatkan

=
=
=
=

Rp
Rp
Rp
Rp

Pembantu tukang listrik
Tukang listrik
Kepala tukang istrik
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total
Dibulatkan

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

Pipa AC Tembaga 1/4x3/8 ( 1 1/2 Pk )
Pipa Pembuangan

@ Rp.
@ Rp.
Sub total :
Dibulatkan

=
=
=
=

Rp
Rp
Rp
Rp

@ Rp.
@ Rp.
Sub total :
Dibulatkan

=
=
=
=

Rp
Rp
Rp
Rp

=
=
=
=

Rp
Rp
Rp
Rp

Upah
0,03200
0,03200
0,00411
0,00160

Oh
Oh
Oh
Oh

Pembantu tukang listrik
Tukang listrik
Kepala tukang istrik
Mandor

62 Memasang Stop Kontak AC
Bahan
1,00000 bh Stop kontak ac clipsal
5,00000 % Perlengkapan instalasi

Upah
0,03200
0,03200
0,00411
0,00160

Oh
Oh
Oh
Oh

Pembantu tukang listrik
Tukang listrik
Kepala tukang istrik
Mandor

63 Memasang Exhaustfan 10'/25cm
Bahan
1,00000 Unit Exhaustfan 10'/25cm
5,00000 % Perlengkapan instalasi

Upah
0,11196
0,11196
0,02238
0,01126

Oh
Oh
Oh
Oh

64 1 m' Pasang instalasi ac
Bahan
1,00000 m
1,00000 m

Upah
0,07500
0,03500

Oh Pembantu Tukang Listrik
Oh Tukang Listrik

65 Memasang 1 buah AC 1 1/2 pk setara daikin
Bahan
1,00000 UNIT AC 1 1/2 Pk
5,00000 % Perlengkapan instalasi

Upah

@ Rp.
@ Rp.
Sub total
Dibulatkan

Lampiran III RKS no. 30/LL/NONSAR/KCI/II/2018 tanggal 27 Februari 2018
1,14286 Oh Pembantu tukang listrik
@ Rp.
1,14286 Oh Tukang listrik
@ Rp.
0,18515 Oh Kepala tukang istrik
@ Rp.
0,11370 Oh Mandor
@ Rp.
Sub total
Dibulatkan

=
=
=
=
=
=

Jakarta,

Rp
Rp
Rp
Rp
Rp
Rp

...... 2018

PT.......
Ttd, Cap/ Stempel Perusahaan,