PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN LENTUR PADA JALAN MUARA ENIM – SUBAN JERIJI – LECAH STA 0 + 000 – STA 6 + 000 KABUPATEN MUARA ENIM PROVINSI SUMATERA SELATAN - POLSRI REPOSITORY

DATA ROUTINE TRAFFIC COUNTING (RTC)

  4

  10

  6

  1

  6 N 16 21 - 22

  72

  18

  27

  21

  9

  1

  18

  9

  1

  2

  2 N Sub Total

  3.072 399 607 472 191 40 357 119

  87 23 168 01 06 - 07 257

  19

  30

  24

  10

  4

  18

  8

  1

  2

  26

  14

  26

  22

  13

  1

  23

  8

  8

  1

  11 N 13 18 - 19 147

  24

  36

  28

  12

  2

  8

  22

  3

  8 N 14 19 - 20 117

  20

  31

  24

  8

  3

  15

  9

  8

  3 N 15 20 - 21 100

  19

  29

  12 O 02 07 - 08 235

  39

  32

  3

  25

  4

  1

  4

  11 O 06 11 - 12 218

  27

  41

  32

  8

  1

  14

  4

  1

  14

  11 O 07 12 - 13 211

  28

  42

  33

  9

  2

  18

  5

  1

  3

  10 O

  SUMSEL 021 I BTS. KOTA MUARA ENIM - SIMPANG SUGIH WAR Tgl Survai 14-Jun-15

  1

  29

  31

  19

  8

  4

  14

  4

  3

  2

  11 O 03 08 - 09 227

  29

  44

  35

  10

  2

  8

  37

  2

  9 O 04 09 - 10 221

  30

  46

  36

  11

  3

  21

  4

  3

  3

  12 O 05 10 - 11 189

  24

  25

  Jam Ke Jam Dari

  Gol

  13

  37

  29

  13

  1

  24

  6

  3

  2

  15 N 04 09 - 10 217

  32

  48

  38

  1

  5 N 03 08 - 09 201

  25

  5

  7

  1

  12 N 05 10 - 11 206

  27

  41

  32

  10

  6

  19

  5

  24

  9

  1

  29

  1 Gol

  2 Gol

  3 Gol

  4 Gol

  5A Gol

  5B Gol

  6A Gol

  6B Gol

  7A Gol

  7B Gol

  7C Direc tion 01 06 - 07 211

  19

  22

  7

  10

  1

  19

  8

  4

  1

  9 N 02 07 - 08 202

  23

  35

  27

  13

  3

  25

  4

  13 N 06 11 - 12 230

  16 N 12 17 - 18 179

  2

  31

  16

  3

  29

  4

  4

  4

  13 N 10 15 - 16 247

  25

  38

  30

  10

  19

  26

  4

  6

  2

  13 N 11 16 - 17 260

  27

  41

  31

  11

  3

  22

  8

  5

  2

  40

  13 N 09 14 - 15 227

  31

  13

  48

  37

  13

  3

  24

  11

  4

  2

  13 N 07 12 - 13 232

  34

  52

  41

  3

  2

  23

  7

  7

  3

  16 N 08 13 - 14 224

  29

  43

  34

  13

  5

  24

  10

  5

  21

DAFTAR BIAYA SEWA ALAT BERAT PER JAM KERJA

  17 TANDEM ROLLER 6-8 T E17 82,0 8,1 Ton 1.287.592.268 249.902,46

  31 CRANE ON TRACK 35 TON E31 125,0 35,0 Ton 915.535.000 531.905,37

  30 PILE DRIVER + HAMMER E30 25,0 2,50 Ton 942.462.500 301.672,32

  29 TRAILER 20 TON E29 175,0 20,00 Ton 646.260.000 598.836,06

  28 CONCRETE PUMP E28 100,0 8,00 M3 121.173.750 297.124,54

  27 FULVI MIXER E27 345,0 2.005,0 969.390.000 1.601.516,32

  26 JACK HAMMER E26 3,0 1.330,0 37.698.500 36.566,21

  25 TAMPER E25 4,7 0,12 Ton 18.310.700 44.576,26

  24 PEDESTRIAN ROLLER E24 8,8 0,84 Ton 161.565.000 89.947,99

  23 WATER TANKER 3000- 45000 L E23 100,0 4.000,0 Liter 113.095.500 173.486,26

  22 WATER PUMP 70-100 mm E22 6,0 - 5.385.500 36.920,57

  21 STONE CRUSHER E21 220,0 50,0 T/Jam 1.088.936.975 831.770,46

  20 CONCRETE VIBRATOR E20 5,5 25,0 4.308.400 39.535,84

  19 VIBRATORY ROLLER 5-8 T E19 82,0 7.100,0 Ton 989.626.016 321.341,89

  18 TIRE ROLLER 8-10 T E18 100,5 9,0 Ton 969.390.000 275.355,19

  NO. URAIAN KO DE HP KAP. HARGA ALAT BIAYA SEWA ALAT PER JAM (diluar PPN) KET

  1 ASPHALT MIXING PLANT E01 294,0 60,0 T/Jam 3.376.708.500 7.713.858,80

  15 WHEEL LOADER 1.0-1.6 M3 E15 96,0 1,5 M3 607.484.400 299.391,79

  14 TRACK LOADER 75-100 HP E14 70,0 0,8 M3 583.788.200 448.462,67

  13 MOTOR GRADER > 100 HP E13 135,0 10.800,0 728.119.600 710.402,25

  12 GENERATOR SET E12 180,0 135,0 KVA 222.959.700 523.064,26

  11 FLAT BED TRUCK 3-4 M3 E11 190,0 10,0 Ton 298.464.410 565.644,33

  10 EXCAVATOR 80-140 E10 133,0 0,9 M3 915.535.000 566.034,15

  9 DUMP TRUCK 10-12 TON E09 190,0 10,0 Ton 387.756.000 586.367,51

  8 DUMP TRUCK 6-8 TON E08 130,0 8,0 Ton 320.006.410 432.592,60

  7 CRANE 10-15 TON E07 138,0 15,0 Ton 1.602.724.800 738.048,47

  6 CONCRETE MIXER 0.3-0.6 M3 E06 20,0 500,0 Liter 189.031.050 105.716,09

  5 COMPRESSOR 4000-6500 L/M E05 60,0 5.000,0 Liter 118.481.000 198.137,19

  4 BULLDOZER 100-150 HP E04 155,0 - 969.390.000 633.657,58

  3 ASPHALT SPRAYER E03 4,0 850,0 Liter 93.707.700 62.116,03

  2 ASPHALT FINISHER E02 72,4 10,0 Ton 2.375.005.500 1.020.775,48

  16 THREE WHEEL ROLLER 6-8 T E16 55,0 8,0 Ton 376.985.000 240.701,72

  DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR JUDUL GAMBAR NO GAMBAR NO GAMBAR SKALA SKALA

PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN

  PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH

  1 POLITEKNIK NEGERI SRIWIJAYA Hor : 1:1000 KABUPATEN MUARA ENIM Ir. EFFENDY SUSILO.,MT. ANDI HERIUS.,ST.,MT RISKI RIPAN DWI RAFIKA ALBAIS POTONGAN MEMANJANG JURUSAN TEKNIK SIPIL

  NIM. 061330100739 NIM. 061330100752 JUMLAH GAMBAR STA 0+000 - STA 6+000 NIP. 195205181984031001 NIP. 197609072001121002 STA 0+000 - STA 0+300 Ver : 1:200 PROVINSI SUMATERA SELATAN

  18 PPV 1

  58 PLV 1

  57

  56 STA = 0 + 300

  55 ELEVASI = 57,45 LV = 38 m

  54 EV = 0,055 3,667 %

  53

  52

  51

  50

  49

  48

  47

  46

  45 Gorong-gorong Ø 0,8 m

  44

  43

  42

  41

  7

  3

  6

  3

  5 ,6 ,3 ,4

  4

  7

  5

  5

  5

  2

  9

  6

  1

  2 ,2 ,7

  ,8

  DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR JUDUL GAMBAR NO GAMBAR NO GAMBAR SKALA SKALA

PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN

  PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH

  2

POLITEKNIK NEGERI SRIWIJAYA

  Hor : 1:1000 Ir. EFFENDY SUSILO.,MT. ANDI HERIUS.,ST.,MT RISKI RIPAN DWI RAFIKA ALBAIS KABUPATEN MUARA ENIM

POTONGAN MEMANJANG JURUSAN TEKNIK SIPIL

  NIM. 061330100739 NIM. 061330100752 JUMLAH GAMBAR STA 0+000 - STA 6+000 NIP. 195202271998022003 NIP. 197609072001121002 STA 0+300 - STA 0+600 Ver : 1:200 PROVINSI SUMATERA SELATAN

  18

  4

  9

  6

  9

  5 STA 0+500

  5 STA 0+400

  9 = Y

  3

  • A ST PIT

  IM RIS PI.1 SPIRAL - CIRCLE - SPIRAL

  A G R 286 m

  VR

  60 Km/Jam ? 21,912 ° Ls 50 m e 6,3 %

  S 5,008 ° ? P 0,365 m

  K 24,995 m Xs 49,962 m Ys 1,457 m Ts 80,431 m

  5,681 Es m L 159,381 m % % % % %

  70 % % %

  70

  65

  65 2,5 %

  60

  60 PTV 1 PPV 1

  55

  55

  51

  51

  5 ,4 ,5 ,0 ,5

  7

  3

  5

  6

  6

  5

  6

  2

  4

  6

  4

  2

  1 ,8 ,2 ,4 ,4

  5

  1

  7

  1

  6

  6

  7

  5 STA STA

  STA 0+300 0+400 0+500 0+600 PTV 2 2,5 % 1,32 %

  PLV 2 PPV 2 STA = 0 + 700 ELEVASI = 67,44 LV = 38 m EV = 0,056

  9

  4 Y =

  9

  4

  5

  9

  5

  9

  4 Y =

  5

  5

  5

  9

  5

  9

  4 Y =

  9

  5

  5

  9

  9

  5

  9

  IM PIT ST A

  A RIS

  4 G

  9

  4

  5

  9

  5

  4 Y =

  5

  9

  3

  5

  9

  5

  9

  4 Y =

  9

  4

  9

  9

  POTONGAN MEMANJANG STA 0+600 - STA 0+900 JUMLAH GAMBAR

  84 Y =

  48

  36

  84 X =

  51

  36

  84 X =

  50

  36

  18

  3 JUDUL GAMBAR NO GAMBAR SKALA DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA Hor : 1:1000 Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN Ir. EFFENDY SUSILO.,MT. NIP. 195202271998022003 NIM. 061330100739 NIP. 197609072001121002 RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752

  • 9

  84 X =

  1 ,4

  84 X =

  

49

  1 ,4

  6

  6

  5 ,5

  7 ,6

  2

  2

  6

  9 ,3

  2

  2

  1

  50

  4

  7 ,6

  4

  4

  5 ,0

  

36

  7 .4

  4

  65

  70

  60

  75 X =

  36

  6

  • 2

  75

  7

  4 ,6

  1

  2

  65

  70

  60

  65

  9

  70

  60

  75 G A R

  IS

  I M P

  IT S T A

  1

  % % % % Gorong-gorong Ø 0,8 m

  7 ,0

  3 ,2

  POTONGAN MEMANJANG STA 0+900 - STA 1+200 JUMLAH GAMBAR

  4

  18

  4 JUDUL GAMBAR NO GAMBAR SKALA DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA Hor : 1:1000 Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN Ir. EFFENDY SUSILO.,MT. NIP. 195202271998022003 NIM. 061330100739 NIP. 197609072001121002 RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752

  6

  1 ,4

  1

  4

  7 ,6

  4

  7

  7

  1 ,7

  1

  2

  7

  1 ,9

  6

  6

  7 ,0

  1,32 %

  • 2

  8

  2

  7

  1 ,5

  3

  7

  8 ,5

  7

  65

  4 ,6

  70

  75

  65

  70

  75

  80 % % %

%

G A RIS

  IM PIT ST A

  1

  1

  7

  POTONGAN MEMANJANG STA 1+200 - STA 1+500 JUMLAH GAMBAR

  3

  18

  5 JUDUL GAMBAR NO GAMBAR SKALA DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA Hor : 1:1000 Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN Ir. EFFENDY SUSILO.,MT. NIP. 195202271998022003 NIM. 061330100739 NIP. 197609072001121002 RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752

  6

  8 ,4

  8

  4

  7

  5 ,9

  4

  7 ,0

  7

  1 ,0

  3

  9

  7

  7 ,2

  5

  6

  % % 1,32 %

  • 80
  • 5

  I M P

  2 ,5

  4

  6 G

  A RI S

  IM PI T ST A

  1

  00 G A R

  IS

  IT S T A

  7 ,0

  1

  % % % 46,081 338,062

  R 130 m PI.3 SPIRAL - SPIRAL

  VR

  50 Km/Jam ? 74,498 ° Ls 169,031 m e 8,2 % m m

  L m ? S 37,249

  P 10,163 m K ° 83,238 m

  Ts Es 189,817

  8

  2

  POTONGAN MEMANJANG STA 1+500 - STA 1+800 JUMLAH GAMBAR

  8

  18

  6 JUDUL GAMBAR NO GAMBAR SKALA DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA Hor : 1:1000 Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN Ir. EFFENDY SUSILO.,MT. NIP. 195202271998022003 NIM. 061330100739 NIP. 197609072001121002 RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752

  7

  1 ,5

  3

  7

  8 ,5

  7

  7

  2

  4 ,2

  7

  6

  7

  9 ,9

  6

  5 ,0

  8

  1 ,2

  

1,32 %

  POTONGAN MEMANJANG STA 1+800 - STA 2+100 JUMLAH GAMBAR

  4 Y =

  9

  9

  4 Y =

  9

  5

  9

  4

  9

  9

  9

  9

  5

  9

  4

  9

  9

  4 % % %

  Gorong-gorong Ø 0,8 m 1,32 % 6,667 %

  0 % PPV 3 STA = 1 + 910 ELEVASI = 84,601

  LV = 90 m EV = 0,601 PTV 3 PLV 3

  PLV 4 PPV 4 STA = 2 +030 ELEVASI = 91,167 LV = 100 m EV = 0,833

  4

  5

  18

  3 ,8

  7 JUDUL GAMBAR NO GAMBAR SKALA DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA Hor : 1:1000 Ver : 1:400 POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN Ir. EFFENDY SUSILO.,MT. NIP. 195202271998022003 NIM. 061330100739 NIP. 197609072001121002 RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752

  ,0

  8

  2 ,5

  4

  6 ,6

  3

  7

  8

  6

  9

  8 ,3

  8

  4

  8

  9 ,8

  6 ,8

  6

  9

  2 ,0

  

X = 365884 X = 365984 X = 366084

Y =

  PTV 4

  POTONGAN MEMANJANG STA 2+100 - STA 2+400 JUMLAH GAMBAR

  18

  8 JUDUL GAMBAR NO GAMBAR SKALA DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA Hor : 1:1000 Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN Ir. EFFENDY SUSILO.,MT. NIP. 195202271998022003 NIM. 061330100739 NIP. 197609072001121002 RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752

  94 Y =

84 Y

  2 ,0

  59

  60

  84 X =

  36

  61

  =

  9

  59

  49

  94 Y =

  9

  49

  84 X =

  8

  9

  59

  48

  94 Y =

  9

  59

  47

  94 % % % %

  0 % 1,45 % PLV 5

  PPV 5 STA = 2 + 290 ELEVASI = 92,064 LV = 35 m EV = 0,064 PTV 5

  36

  62

  3

  6

  1

  9

  2 ,1

  4

  6

  9

  9

  3 ,5

  9

  4

  9

  36

  2 ,0

  100 105

  95

  90

  88 100 105

  95

  90

  88 X =

  36

  63

  9

  84 X =

  POTONGAN MEMANJANG STA 2+400 - STA 2+700 JUMLAH GAMBAR

  4

  9

  4 Y =

  9

  5

  9

  4

  

6

  

9

  

4

Y =

  9

  5

  9

  6

  4

  9

  4 % % % % % %

  11,509 207,056 R 286 m

  PI.5 SPIRAL - CIRCLE - SPIRAL

  VR

  60 Km/Jam ? 31,463 ° Ls 50 m e 6,3 % m m

  L m ? S

  5,008 P 0,365 m K Xs 49,962 m

  Ys 1,457 ° 24,995 m m

  Ts Es 105,658

  Gorong-gorong Ø 0,8 m 1,45 % 2,833 % PLV 6

  PPV 6 STA = 2 + 600 ELEVASI = 96,56 LV = 35 m EV = 0,0604 PTV 6

  7

  9

  18

  9 JUDUL GAMBAR NO GAMBAR SKALA DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA Hor : 1:1000 Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN Ir. EFFENDY SUSILO.,MT. NIP. 195202271998022003 NIM. 061330100739 NIP. 197609072001121002 RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752

4 Y

  =

  9

  9

  5

  9

  9

  5 ,0

  4

  3

  8

  4

  9

  6 ,5

  9 ,3

  36 638

  5

  3

  9

  9

  3 ,5

  9

  4 X =

  36 648

  4 X =

  36 658

  4 X =

  3

  POTONGAN MEMANJANG STA 2+700 - STA 3+000 JUMLAH GAMBAR

  18

  10 JUDUL GAMBAR NO GAMBAR SKALA DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA Hor : 1:1000 Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN Ir. EFFENDY SUSILO.,MT. NIP. 195202271998022003 NIM. 061330100739 NIP. 197609072001121002 RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752

PI.6 FULL CIRCLE

  1

  9

  PPV 7 STA = 2 + 900 ELEVASI = 104,897 LV = 38 m EV = 0,103 PTV 7

  2,833 % 0,7 % PLV 7

  Tc Ec 53,430

  60 Km/Jam ? 12,199 ° e 4 % m m Lc m

  VR

  2,874 106,456 R 500 m

  3 % % % %

  3

  9 ,3

  7

  1

  6

  2

  1

  9

  7 ,5

  6

  5 ,6

  1

  9 ,0

  4 ,8

  2 ,1

  POTONGAN MEMANJANG STA 3+000 - STA 3+300 JUMLAH GAMBAR

  5

  0,7 % 3,043 % PLV 8

  % 7 % % %

  5

  3 ,9

  1

  9

  6 ,7

  1

  7

  18

  6

  5 ,6

  1

  3

  3

  6 ,3

  1

  5

  11 JUDUL GAMBAR NO GAMBAR SKALA DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA Hor : 1:1000 Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN Ir. EFFENDY SUSILO.,MT. NIP. 195202271998022003 NIM. 061330100739 NIP. 197609072001121002 RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752

  PPV 8 STA = 3 + 200 ELEVASI = 106,791 LV = 45 m EV = 0,209 PTV 8

  DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR JUDUL GAMBAR NO GAMBAR NO GAMBAR SKALA SKALA PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH

  12 POLITEKNIK NEGERI SRIWIJAYA Hor : 1:1000 Ir. EFFENDY SUSILO.,MT. ANDI HERIUS.,ST.,MT RISKI RIPAN DWI RAFIKA ALBAIS KABUPATEN MUARA ENIM

POTONGAN MEMANJANG JURUSAN TEKNIK SIPIL

  JUMLAH GAMBAR STA 0+000 - STA 6+000 NIP. 195202271998022003 NIP. 197609072001121002 NIM. 061330100739 NIM. 061330100752 STA 3+300 - STA 3+600 Ver : 1:200 PROVINSI SUMATERA SELATAN

  18

  4

  4

  9

  9

  4

  3

  4

  4

  9

  84

  9

  84

  5

  72

  5

  74

  9

  36

  9

  36 X = =

  X = = Y

  Y

  4

  4

  9

  9

  4

  3

  4

  4

  9

  84

  9

  84

  5

  71

  5

  73

  36

  9

  9

  36 X = =

  = X = Y Y

  4

  9

  3

  4

  9

  84

  5

  72

  9

36 X =

  = Y

  4

  4

  9

  9

  3

  2

  4

  4

  9

  84

  9

  84

  5

  71

  5

  73

  9

  36

  9

  36 X = =

  X = = Y

  Y 3,043 % PLV 9

  PPV 9 PTV 9 0 % Gorong-gorong Ø 0,8 m

  STA = 3 + 430 ELEVASI = 100,133 LV = 35 m EV = 0,133

  7

  3

  5

  1 ,9 ,9 ,0 ,0

  3

  1

  1

  1

  1

  6

  9

  POTONGAN MEMANJANG STA 3+600 - STA 3+900 JUMLAH GAMBAR

  4 Y

=

  4 Y =

  9

  2

  4

  9

  5

  9

  9

  5

  2

  4

  9

  5

  9

  4 Y =

  9

  9

  9

  4

  9

  9

  1

  4

  9

  5

  9

  4 Y =

  2

  4

  4

  9

  5

  9

  4 Y =

  9

  1

  3

  9

  18

  36

  73

  36

  84 X =

  76

  36

  84 X =

  75

  90 X =

  36

  95 105

  100

  1 ,0

  1 ,0

  1 ,0

  1 ,0

  13 JUDUL GAMBAR NO GAMBAR SKALA DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA Hor : 1:1000 Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN Ir. EFFENDY SUSILO.,MT. NIP. 195202271998022003 NIM. 061330100739 NIP. 197609072001121002 RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752

  84 X =

  74

  5

  9

  9

  4 Y =

  9

  2

  4

  9

  5

  84 Y =

  84 X =

  74

  36

  84 X =

  76

  36

  84 X =

  75

  36

  4 Gorong-gorong Ø 0,8 m 0 %

  POTONGAN MEMANJANG STA 3+900 - STA 4+200 JUMLAH GAMBAR

  18

  14 JUDUL GAMBAR NO GAMBAR SKALA DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA Hor : 1:1000 Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN Ir. EFFENDY SUSILO.,MT. NIP. 195202271998022003 NIM. 061330100739 NIP. 197609072001121002 RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752

PI.6 FULL CIRCLE

  3

  95 105

  Gorong-gorong Ø 0,8 m 0 %

  Tc Ec 57,560

  60 Km/Jam ? 13,134 ° e 4 % m m Lc m

  VR

  R 500 m

  90 % % % % 3,302 114,616

  100

  5

  1 ,0

  1 ,0

  1

  1 ,0

  6

  1

  1 ,0

  5

  POTONGAN MEMANJANG STA 4+200 - STA 4+500 JUMLAH GAMBAR

  18

  15 JUDUL GAMBAR NO GAMBAR SKALA DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA Hor : 1:1000 Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN Ir. EFFENDY SUSILO.,MT. NIP. 195202271998022003 NIM. 061330100739 NIP. 197609072001121002 RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752

  ,9

  5

  3

  1 ,0

  ,0

  1 ,0

  3

  1 ,0

  ,3

  1

  5

  1 ,0 % % % %

  0 %

  POTONGAN MEMANJANG STA 4+500 - STA 4+800 JUMLAH GAMBAR

  18

  16 JUDUL GAMBAR NO GAMBAR SKALA DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA Hor : 1:1000 Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN Ir. EFFENDY SUSILO.,MT. NIP. 195202271998022003 NIM. 061330100739 NIP. 197609072001121002 RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752

PI.6 FULL CIRCLE

  9

  8 ,3

  3

  3

  1 ,0

  5 ,0

  1 ,0 % % % %

  7,647 173,791 R 500 m

  VR

  60 Km/Jam ? 19,915 ° e 4 % m m Lc m

  Tc Ec 87,781

  0 % PLV 10

  9

  POTONGAN MEMANJANG STA 4+800 - STA 5+100 JUMLAH GAMBAR

  18

  17 JUDUL GAMBAR NO GAMBAR SKALA DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA Hor : 1:1000 Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL ANDI HERIUS.,ST.,MT PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN Ir. EFFENDY SUSILO.,MT. NIP. 195202271998022003 NIM. 061330100739 NIP. 197609072001121002 RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752

  4 Y =

  9

  6

  3

  9

  5

4 Y

  3 ,4

  

5

  1 ,8

  9

  8

  8

  ,9

  

9

  

5

  

9

  

3

  

9

  9

  

4

Y =

  9

  5

  9

  3

  5

  9

  4 % % % %

  Gorong-gorong Ø 0,8 m PTV 11

  5

  =

  8

  6

  9

  5 ,5

  7

  1

  5 ,7

  3

  4

  9

  1 ,6

  7 ,9

  36 848

  9

  9

  9

  5 ,0

  X =

  7

  4 X =

  36 868

  4 X =

  36 858

ANDI HERIUS.,ST.,MT

  6

  0 %

  PTV 12 Gorong-gorong Ø 0,8 m 3,714 %

  

PLV 12

PPV 12 STA = 5 + 300 ELEVASI = 102,79 LV = 45 m EV = 0,209

  3 ,0

  1

  ,0

  3 ,0

  1

  9 ,0

  2 ,7

  1

  POTONGAN MEMANJANG STA 5+100 - STA 5+450,011 JUMLAH GAMBAR

  18

  6

  8

  9 ,2

  9

  1 ,0

  7

  5 ,5

  9

  8

  3 ,4

  PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH KABUPATEN MUARA ENIM STA 0+000 - STA 6+000 PROVINSI SUMATERA SELATAN Ir. EFFENDY SUSILO.,MT. NIP. 195202271998022003 NIM. 061330100739 NIP. 197609072001121002 RISKI RIPAN DWI RAFIKA ALBAIS NIM. 061330100752

  18 JUDUL GAMBAR NO GAMBAR SKALA DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA Hor : 1:1000 Ver : 1:200 POLITEKNIK NEGERI SRIWIJAYA JURUSAN TEKNIK SIPIL

  3 ,0

DISETUJUI OLEH

  NO GAMBAR SKALA DIGAMBAR OLEH JUDUL GAMBAR

PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN

  POLITEKNIK NEGERI SRIWIJAYA PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH

  1 POTONGAN MELINTANG Ir. EFFENDY SUSILO.,MT. ANDI HERIUS.,ST.,MT.

  Hor : 1:200 JURUSAN TEKNIK SIPIL KABUPATEN MUARA ENIM RISKI RIPAN DWI RAFIKA ALBAIS JUMLAH GAMBAR NIP. 195202271998022003 Ver : 1:200 STA 0+000 - STA 6+000 NIP. 197609072001121002 NIM. 061330100739 NIM. 061330100752 STA 0+000 - STA 0+700 PROVINSI SUMATERA SELATAN

  7 47,000

  65,463

  66 0+410,166

  47 2 % 2 % 66,076 5 % 5 % 1:

  1 65,845

  1 1: 0+000

  45

  64 60,754

  62

  43 42,726 41,652

  1: 1 5 % 0 % 2 %

  1 5 % 41,438 1:

  60

  41 50,667

  68,715

  68 66,933 68,411 2 % 2 % 5 % 5 % 1:

  1

  1

  50 1:

  66 0+100

  0+477,8433

  48 62,446

  64 46,745 1:

  46 45,262 1 5 % 6,3 % 6,3 %

  1 5 % 1:

  62 44,445

  44 69,231 54,333 2 % 2 %

  68 5 % 5 % 1:

  1 68,511

  1 1:

  53 64,138

  66 66,448

  0+200

  51 49,719 50,514

  1:

  64 1 2 % 0+545,5206 5 % 0 % 5 %

  1 1:

  49 47,144

  47 74,698 57,450

  71,405

  73 2 % 2 % 5 % 5 % 1:

  1

  1 1:

  71

  56 0+600 0+300

  69

  54 68,828 53,193 51,820

  65,50

  52

  67 1: 1 5 % 2 % 2 %

  1: 1 5 %

  65

  50 50,000

  75,000 65,242

  75 75,000

  65 65,238 65,000

  73,934

  73 0+700

  63

  71 60,50

  0+400 61 1:

  1

  1 2 % 2 % 1: 5 % 5 %

  69 67,44

  59 1:

  1

  1 2 % 2 % 1: 5 % 5 %

  67

  DISETUJUI OLEH JUDUL GAMBAR NO GAMBAR SKALA

  PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN DIGAMBAR OLEH POLITEKNIK NEGERI SRIWIJAYA PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH

  2 POTONGAN MELINTANG

  KABUPATEN MUARA ENIM Ir. EFFENDY SUSILO.,MT. RISKI RIPAN DWI RAFIKA ALBAIS Hor : 1:200 JURUSAN TEKNIK SIPIL

  ANDI HERIUS.,ST.,MT.

  STA 0+700 - STA 1+456,901 JUMLAH GAMBAR NIM. 061330100739 NIM. 061330100752

  STA 0+000 - STA 6+000 NIP. 195202271998022003 NIP. 197609072001121002 Ver : 1:200

  7 PROVINSI SUMATERA SELATAN

  75,338 70,622

  5 % 6,3 % 6,3 %

  1

  75 5 % 1: 1:

  1 69,322 70,987 0+800

  1+254,943

  70

  73 1:

  1 2 % 2 % 5 % 1: 1 5 %

  71

  68 68,102

  69,167 70,000 70,000 70,644

  69 75,338 2 % 2 % 5 % 5 % 1:

  1

  1 70 1:

  2 % 5 % 0 % 5 % 1 1:

  1 76 1:

  68 1+353,81 0+900

  74

  66 69,859

  72

  64

  70 70,237 61,414 62,429

  62

  68 60,770

  60 66,595

  66 77,256 74,658

  74 71,966

  2 % 2 % 5 % 5 %

  77 1:

  1

  1 1: 71,711 1: 72 2 %

  1 2 % 5 % 5 % 1:

  1 1+000

  75

  70 73,599 69,276

  73 1+400

  71,039

  71 73,29

  74 2 % 2 % 5 % 5 % 1:

  69

  1

  1 69,005 1:

  1+100

  72 78,008 70,000 70,463

  78

  70 2 % 0 % 5 % 5 % 1: 70,000

  1

  1 1:

  76 1+456,901

  74,638

  74 73,29

  71,304 72,389 74 0 % 2 %

  72 5 % 5 % 1:

  1 1:

  1

  72 70,000 71,348

  1+156,076

  70 70,000

  JARAK

STA JARAK

15 5,5 3,5 3,5 5,5

  15 STA

  DISETUJUI OLEH DIGAMBAR OLEH JUDUL GAMBAR NO GAMBAR SKALA

PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN

  POLITEKNIK NEGERI SRIWIJAYA PADA JALAN MUARA ENIM - SUBAN JERIJI - LECAH

  3

POTONGAN MELINTANG

  KABUPATEN MUARA ENIM Ir. EFFENDY SUSILO.,MT. ANDI HERIUS.,ST.,MT. RISKI RIPAN DWI RAFIKA ALBAIS Hor : 1:200

JURUSAN TEKNIK SIPIL

  JUMLAH GAMBAR NIP. 195202271998022003 NIP. 197609072001121002 STA 1+456,901 - STA 2+213,674 Ver : 1:200

  STA 0+000 - STA 6+000

NIM. 061330100739 NIM. 061330100752

  7 PROVINSI SUMATERA SELATAN 79,804

  2 % 2 % 5 % 5 % 1:

  1

  83 8,2 % 1: 8,2 %

  1 1: 5 %

  1 5 %

  79

  1 83,868 1:

  1+592,789

  81 1+900

  77 74,076

  79

  75 75,000

  77,689

  77

  73 74,637

  75 71,593

  71

  73 81,602

  84,941 72,068 2 % 0 % 5 % 5 % 1:

  1

  1 1: 0 % 2 % 5 % 5 % 1:

  1

  1 1:

  80

  84 1+728,677

  1+918,079

  82

  78

  80

  76

  78

Dokumen yang terkait

PENAMBANGAN BATUBARA OLEH RAKYAT DI DESA TANJUNG LALANG KECAMATAN TANJUNG AGUNG KABUPATEN MUARA ENIM PROVINSI SUMATERA SELATAN

0 15 57

PERENCANAAN GEOMETRIK DAN PERKERASAN JALAN TOL PANDAAN-MALANG DENGAN JENIS PERKERASAN LENTUR

2 26 6

PENGGUNAAN INTERBLOCK SEBAGAI LAPISAN ULANGOVERLAY PERKERASAN LENTUR JALAN RAYA (KASUS RUAS JALAN LEGUNDI-BUNDER STA 15+800 – 18+800 KABUPATEN GRESIK)

1 0 8

ANALISA FAKTOR PENYEBAB KECELAKAAN LALU LINTAS DI RUAS JALAN SISINGAMANGARAJA (STA 00+000 – STA 10 + 000 ) KOTA MEDAN

0 0 20

PEMERINTAH KABUPATEN MUARA ENIM SMAN 1 UNGGULAN MUARA ENIM

1 21 19

PERENCANAAN PERKERASAN LENTUR PADA RUAS JALAN BLITAR – SRENGAT STA 3+450 SAMPAI STA 10+350 DENGAN METODE AASHTO TUGAS AKHIR Untuk memenuhi persyaratan dalam memperoleh Gelar Sarjana (Strata-1) Program Studi Teknik Sipil

0 0 21

PERENCANAAN PENINGKATAN JALAN SIDOARJO - KRIAN (LINK 172) STA 6+650 – 12+100 DENGAN METODE PERKERASAN LENTUR DAN PERKUATAN GEOTEKSTIL TUGAS AKHIR - PERENCANAAN PENINGKATAN JALAN SIDOARJO -KRIAN (LINK 172) STA 6+650 – 12+100 DENGAN METODE PERKERASAN LENTUR

0 0 23

PERBANDINGAN PERKERASAN LENTUR DAN PERKERASAN KAKU TERHADAP BEBAN OPERASIONAL LALU LINTAS DENGAN METODE AASHTO PADA RUAS JALAN KALIANAK STA 0+000 – 5+350 SURABAYA TUGAS AKHIR - PERBANDINGAN PERKERASAN LENTUR DAN PERKERASAN KAKU TERHADAP BEBAN OPERASIONAL

0 1 13

PERENCANAAN PERKERASAN LENTUR DENGAN METODE KONSTRUKSI BERTAHAP PADA RUAS JALAN DURENAN-BANDUNG-BESUKI PADA STA 171+550 – 182+350 DI KABUPATEN TULUNGAGUNG TUGAS AKHIR - PERENCANAAN PERKERASAN LENTUR DENGAN METODE KONSTRUKSI BERTAHAP PADA RUAS JALAN DURENA

0 0 19

KALANGAN MINGGU DI DESA MUARA DUA KECAMATAN SEMENDO KABUPATEN MUARA ENIM SUMATERA SELATAN DALAM PERSPEKTIF HUKUM ISLAM DAN HUKUM POSITIF - Raden Intan Repository

0 0 89