Penjadwalan Flowshop Berdasarkan Algoritma Nawaz, Enscore dan Ham (NEH) dengan Pendekatan Shortest Processing Time (SPT) dan Longest Processing Time (LPT) di PT Growth Sumatra Industry, Ltd

DAFTAR PUSTAKA

Baker, Kenneth. 2001. Elements of Sequencing And Scheduling. New York: Wiley
Faizal, Achmad et al. 2014. Pengembangan Penjadwalan Re-entrant Flowshop
Berdasarkan Algoritma Nawaz, Enscore, dan Ham (NEH) dengan
Pendekatan Dispatching Rule. Diakses tanggal 5 September 2016.
Gozali, Lina et al. 2013. Usulan Penjadwalan Job Dengan Metode Campbell,
Dudek And Smith (CDS) dan Metode Nawaz, Enscore And Ham (NEH)
Untuk Meminimasi Makespan Proses Stamping Part Isuzu di Line B PT
XYZ. Diakses tanggal 5 September 2016
Ginting, Rosnani. 2007. Sistem Produksi. Yogyakarta : Graha Ilmu
Masudin, Ilyas et al. 2014. Penjadwalan Flowshop Menggunakan Algoritma
Nawaz Enscore Ham. Diakses tanggal 5 September 2016.
Pinedo, Michael. 1999. Operation Scheduling With Application in Manufacturing
and Services. USA: McGraw Hill International Editions.
Groover, Mikell. 2007. Work Systems and the Methods,

Measurement,

and


Management of Work. USA: Pearson prentice hall.
Sutalaksana, Iftikar. Z. 2005. Teknik Tata Cara Kerja. Bandung: ITB.
Wibowo, Rudi et al. 2016. Optimalisasi dan Evaluasi Panjadwalan Aliran
Produksi Flowshop N-Jobs, M-Machines Menggunakan Metode Heuristic
Algorithm. Diakses tanggal 5 September 2016.
Wignjosoebroto, Sritomo. 2003. Ergonomi Studi Gerak dan Waktu. Jakarta: Guna
Widya.

Universitas Sumatera Utara

Dokumen yang terkait

Analisis Perbandingan Kinerja Antara Algoritma Heuristic Pour Dan Algoritma Nawaz, Enscore Dan Ham (NEH) Dalam Menyelesaikan Penjadwalan Flowshop Pada PT Cakra Compact Aluminium Industries Medan

6 46 157

ANALISIS PENJADWALAN PRODUKSI MENGGUNAKAN METODE FCFS (FIRST COME FIRST SERVED), SPT (SHORT PROCESSING TIME), LPT (LONGEST PROCESSING TIME) DAN EDD (EARLIEST DUE DATE) PADA IYAN JAYA GARMENT JEMBER

19 89 99

Penjadwalan Flowshop Menggunakan Algoritma Nawaz Enscore HAM

1 4 6

Penjadwalan Flowshop Berdasarkan Algoritma Nawaz, Enscore dan Ham (NEH) dengan Pendekatan Shortest Processing Time (SPT) dan Longest Processing Time (LPT) di PT Growth Sumatra Industry, Ltd

0 5 160

Penjadwalan Flowshop Berdasarkan Algoritma Nawaz, Enscore dan Ham (NEH) dengan Pendekatan Shortest Processing Time (SPT) dan Longest Processing Time (LPT) di PT Growth Sumatra Industry, Ltd

1 0 21

Penjadwalan Flowshop Berdasarkan Algoritma Nawaz, Enscore dan Ham (NEH) dengan Pendekatan Shortest Processing Time (SPT) dan Longest Processing Time (LPT) di PT Growth Sumatra Industry, Ltd

0 0 1

Penjadwalan Flowshop Berdasarkan Algoritma Nawaz, Enscore dan Ham (NEH) dengan Pendekatan Shortest Processing Time (SPT) dan Longest Processing Time (LPT) di PT Growth Sumatra Industry, Ltd

0 0 6

Penjadwalan Flowshop Berdasarkan Algoritma Nawaz, Enscore dan Ham (NEH) dengan Pendekatan Shortest Processing Time (SPT) dan Longest Processing Time (LPT) di PT Growth Sumatra Industry, Ltd

0 0 39

Penjadwalan Flowshop Berdasarkan Algoritma Nawaz, Enscore dan Ham (NEH) dengan Pendekatan Shortest Processing Time (SPT) dan Longest Processing Time (LPT) di PT Growth Sumatra Industry, Ltd

0 0 13

Kata kunci : Ignall-Scharge, makespan, Nawaz Enscore Ham (NEH), penjadwalan produksi

4 5 13