Evaluasi Rekayasa Nilai (Value Engineering) Pada Pembangunan Proyek Ketenagalistrikan Pasca Reformasi Di Indonesia (Studi Kasus, Pltu Pangkalan Susu)

DAFTAR PUSTAKA

[1] C. DR. Suriana Chandra, MAXIMIZING CONSTRUCTION PROJECY AND INVESTMENT
BUDGET EFFICIENCY WITH VALUE ENGINEERING, Jakarta: Kompas Gramedia, 2014.
[2] WEST VIRGINIA DEPARTMENT OF TRANSPORTATION, Value Engineering Manual,
Virginia: WVDOH OFFICE SERVICES DIVISON, 2004.
[3] J.Supantor, Ekonometrik Buku Satu, Jakarta: Lembaga Penerbit Fakultas Ekonomi Indonesia,
1983.
[4] Y. Oktopianto, "Analisis Keterlambatan Proyek Konstruksi Dengan Konsep Earned Value
Analysis Pada Proyek Gedung Dinas Komunikasi dan Informasi Jawa Timue," 2012.
[5] S. Herawati Zetha Rahman, "Analisa Penerapan Metode Value Engineering Pada Industri
Konstruksi di Indonesia," JURNAL TEKNIK FTUP, vol. 27, pp. 119-126, 2014.
[6] M. P. D. Ir. Chaidir Anwar Makarim, Value Engineering e-learning 2007 Module, Jakarta:
LAWRENCE D. MILES VALUE FOUNDATION, 2007.

37
Universitas Sumatera Utara