DRPLN-JM dan DRPPHLN

BAPPENAS

LIST OF PLANNED PRIORITY
EXTERNAL LOANS
2017

MINISTRY OF NATIONAL DEVELOPMENT PLANNING/
NATIONAL DEVELOPMENT PLANNING AGENCY

REPUBLIC OF INDONESIA

LIST OF PLANNED PRIORITY
EXTERNAL LOANS
2017

Ministry of National Development Planning/
National Development Planning Agency
- 2017 -

Foreword


The issuance of The List of Planned Priority External Loans (DRPPLN) 2017 is
based on the mandate of Government Regulation Number 10/2011 on Procedure for the
Procurement of External Loans and Grants, and on the Decree of the Minister of National
Development Planning/Head of the National Development Planning Agency Number
4/2011, on Procedure for Planning, Proposing, Assessing, Monitoring, and Evaluation of
Projects Financed by External Loans and Grants. The projects listed in DRPPLN 2017 are
projects that have been previously listed in the DRPLN-JM (List of Medium-Term
Planned External Loans) and its revisions. The projects listed in the DRPPLN 2017 are
projects that met most criteria for project readiness as well as already have the
prospective lenders.
DRPPLN 2017 is issued through the decision of the Minister of National
Development Planning/ Head of Bappenas Number KEP. 82/ M.PPN / HK / 07/2017.
DRPPLN 2017 consists of 25 projects with a total loan value of USD 6.1 billion. The
Implementing Agency for the projects are 9 ministries/agencies and 2 State Owned
Enterprises (SOEs).
Furthermore, DRPPLN 2017 will be used as a reference in the preparation of
the Government Work Plan (RKP) for 2018, where most of those projects are planned to
be implemented starting 2018. We hope DRPPLN 2017 can also be used as a reference
for development partners in the implementation of the projects.
Ministry for National Development Planning/

Head of the National Development Planning Agency,

i

ii

List of Contents
Chapter 1 ................................................................................................................................ 1
Introduction .............................................................................................................. 1
Recapitulation and List of Projects in the DRPPLN 2017 ................................... 1
Kementerian Pekerjaan Umum dan Perumahan Rakyat/ Ministry of Public Works
and Housing ........................................................................................................................ 11
Direktorat Jenderal Bina Marga/ Directorate General of Highways ................... 13
1. The Development of Cileunyi-Sumedang-Dawuan (Cisumdawu) Toll Road Phase III................................................................................................................... 15
Direktorat Jenderal Cipta Karya/ Directorate General of Human Settlements . 17
2. Regency Settlement Infrastructure Development (RSID) ................................. 19
3. Development of National Urban Development Program (NUDP) ................. 21
4. National Urban Water Supply Project (NUWSP) .............................................. 25
Direktorat Jenderal Sumber Daya Air/ Directorate General of Water Resources29
5. The Urgent Rehabilitation of Strategic Irrigation for Western Region of

Indonesia................................................................................................................. 31
6. Integrated Participatory Development and Management of Irrigation Project Phase I ..................................................................................................................... 33
7. Engineering Service for Coastal and River Development Project ................... 36
8. Engineering Service for Dam Multipurpose Development Project ................. 38
Direktorat Penyediaan Perumahan/ Directorate General of Housing Provision 41
9. National Affordable Housing Project ................................................................. 43
Kementerian Perhubungan/ Ministry of Transportation ............................................... 45
10. Patimban Port Development Project (I) .............................................................. 47
11. Construction of Jakarta Mass Rapid Transit (MRT) North-South Line Project
Phase-II.................................................................................................................... 50
Kementerian Riset, Teknologi, dan Perguruan Tinggi/ Ministry of Research,
Technology, and Higher Education ................................................................................. 53
12. The Plan of Hasanuddin University Hospital Development ........................... 55
13. Development of World Class University with Socio Entrepreneurial Spirit at
Universitas Gadjah Mada ..................................................................................... 57
Kementerian Agama/ Ministry of Religious Affairs ..................................................... 59
14. The Development and Improvement of Six Islamic Higher Education
Institutions Project ................................................................................................. 61
Kementerian Kesehatan/ Ministry of Health .................................................................. 65
iii


15. Indonesia-Supporting Primary and Referral Health Care Reform (I-SPHERE)
in East Indonesia .................................................................................................... 67
Kementerian PPN/Bappenas/ Ministry of National Development Planning / National
Development Planning Agency ....................................................................................... 71
16. Human Resources Development for Bureaucratic Reform (HRDBR)............. 73
Kementerian Pertanian/ Ministry of Agriculture ........................................................... 75
17. Rural Empowerment and Agricultural Development Programme Scaling-up
Initiative (READ-SI) ............................................................................................... 77
Kementerian Pertahanan/ Ministry of Defense ............................................................. 81
18. Upgrading Medical Equipments for Naval Hospital Wahyu Slamet Bitung –
North Sulawesi ....................................................................................................... 83
19. Upgrading Medical Equipment and Supporting Facilities for Army Hospital
PELAMONIA ......................................................................................................... 85
20. Procurement of Medical Equipment and Supporting Facilities for Army
Hospital Putri Hijau............................................................................................... 87
21. Upgrading Medical Equipment and Supporting Facilities for Army Hospital
UDAYANA ............................................................................................................. 89
22. Upgrading Medical Equipment for Air Force Hospital Dody Sarjoto –
Makassar ................................................................................................................. 91

Badan Meteorologi Klimatologi dan Geofisika/ The Agency for Meteorology,
Climatology, and Geophysics ........................................................................................... 93
23. Strengthening Climate and Weather Service Capacity-Phase II ...................... 95
PT. SMI/ Indonesia Infrastructure Finance Company .................................................. 99
24. Increasing PT Indonesia Infrastructure Finance Financing Capacity in
Accelerating Infrastructure Development in Indonesia ................................. 101
PT. PLN/ State Electricity Company .............................................................................. 103
25. Indramayu Coal Fired Power Plant #4 (1x1000MW) Phase I ......................... 105

iv

Chapter 1

1. Introduction
Based on the National Medium Term Development Plan (RPJMN) 2015-2019, the
investment requirement for infrastructure in the period 2015-2019 is estimated at Rp.
4,796.2 trillion. The figure is calculated based on the level of infrastructure
performance required to achieve Indonesia's position as middle income country by
2025. The funding needs can be met from several sources of funding, such as the State
Budget (APBN), State-Owned Enterprises (SOEs), and private participation. Due to

the limited APBN, to meet the huge funding needs, the government uses several
other sources of funding, including external loans.
In accordance with the mandate of Government Regulation Number 10/2011 on
Procedure for the Procurement of External Loans and Grants, and on the Decree of
the Minister of National Development Planning/Head of the National Development
Planning Agency Number 4/2011, on Procedure for Planning, Proposing, Assessing,
Monitoring, and Evaluation of Projects Financed by External Loans and Grants, the
government issues The List of Planned Priority External Loans (DRPPLN) 2017.
DRPHLN 2017 is a list of projects that are ready to be implemented.
The projects listed in DRPPLN 2017 are projects that have been previously listed in
the DRPLN-JM (List of Medium-Term Planned External Loans) and its revisions, and
have indicative potential lender. In addition, these projects must have been that meet
most criteria for project readiness shown by documents Readiness Criteria (RC).
Since most of the DRPPLN 2017 projects will start their implementation from 2018.
Parallelly, those projects should be included in the External Loan and Grant
withdrawal plan in 2018.
The DRPPLN 2017 is presented in two chapters. Chapter 1 consists of the
recapitulation of the projects by the executing agencies, by the indicative sources of
financing, and by the sector allocation. While Chapter 2 consists of the summary of
each project information, such as location, scope, outputs and outcomes as well as

implementing agencies involved in project implementation (project digest).
2. Recapitulation and List of Projects in the DRPPLN 2017
DRPPLN 2017 consists of 25 projects with a total loan amount of USD 6.1 billion with
a local financing of USD 1 billion. There are 9 out of those 25 projects that have been
listed in the previous DRPPLN which has not signing yet. The recapitulation of
proposed projects in the DRPPLN 2017 on the basis of executing agencies is shown in
Table 1, while the proportion of infrastructure and non-infrastructure sector allocation
is presented in Table 2.
1

Table 1. The DRPPLN 2017 by Executing Agencies
No

Number of
Projects

Executing Agency

Ministries/Agencies


Amount (USD million)
Loans

Local Funds

23

5,569.2

942.6

1

Ministry of Public Works

9

1,784.1

478.9


2

Ministry of Transportation

2

2,894.0

90.7

3

Ministry of Research,
Technology and Higher
Education

2

103.2


8.7

4

Ministry of Religious Affairs

1

238.0

50.0

5

Ministry of Defense

5

60.0


6

Ministry of Health

1

150.0

7

Ministry of National
Development
Planning/National
Development Planning
Agency

1

150.0

8

Ministry of Agriculture

1

39.9

6.8

9

The Agency for
Meteorology, Climatology,
and Geophysics

1

150.0

20.4

State-Owned Enterprises (SOEs)

2

500.0

50.0
50.0

10

PT. PLN/State Electricity
Company

1

300.0

11

PT. SMI/Indonesia
Infrastructure Finance
Company

1

200.0

Total

25

6,069.2

2

287.1

992.6

Table 2. Recapitulation of the DRPPLN 2017 by Sector
No

Number of
Projects

Sector

Amount(USD million)
Loans

Local Funds

1

Infrastructure

13

5,178.1

619.6

2

Non-Infrastructure

12

891.1

373.0

25

6,069.2

992.6

Total

Table 3. Recapitulation of The DRPPLN 2017 by Source of Financing
No

Source of Financing

Multilateral Agencies

Loan Amount
(USD million)
1,977.5

1

World Bank

1,099.6

2

ADB

600.0

3

IDB

238.0

4

IFAD

39.9

Bilateral Partners

4,091.7

5

Japan (JICA)

3,466.7

6

Korea (EDCF)

227.5

7

China (Exim Bank)

156.0

8

France

78.9

9

USA (US Exim)

71.1

10

Austria

60.0

11

Germany (KfW)

31.5
Total

6,069.2

3

Some figures/ diagrams of the DRPPLN/ Green Book 2017 as follows:
Diagram A. Proportion of Loan Amount
by Type of Executing Agency
State-Owned
Enterprises
(SOEs)
8%

Diagram B. Proportion of Loan
Amount by Sector

NonInfrastructure
15%

14,7%

8,2%

Ministries/
Agencies
92%

Infrastructure
85%

91,8%

85,3%

Table 4. List of DRPPLN 2017
(in US$ 000)
No

Project Title

Program Title

Loan

Local Fund

Lender

Ministry of Public Works
Directorate General of Highways

1

The
Developement of
CileunyiSumedangDawuan
(Cisumdawu)Tol
l Road – Phase
III

Toll Road
Development
Program

156,000

223,000

China
(Exim
Bank)

201,000

0

JICA

Directorate General of Human Settlement

2

Regency
Settlement
Infrastructure
Development
(RSID)

Slum
Alleviation
Program

4

(in US$ 000)
No

Project Title

3

Development of
National Urban
Development
Program
(NUDP)

4

National Urban
Water Supply
Project
(NUWSP)

Program Title

Sustainable
Urban
Development
Program
Drinking
Water
Development
Program

Loan

Local Fund

Lender

49,610

0

World
Bank

100,000

184,800

World
Bank

Directorate General of Water Resources

5

The Urgent
Rehabilitation of
Strategic
Irrigation for
Western Region
of Indonesia

Development
and
Management
of Irrigation
Program

195,778

27,150

Korea

6

Integrated
Participatory
Development
and
Management of
Irrigation Project

Development
and
Management
of Irrigation
Program

600,000

41,564

ADB

7

Engineering
Service for
Coastal and
River
Development
Project

Mitigation of
Water
Hazards
Program

10,094

1,116

Korea

8

Engineering
Service for Dam
Multipurpose
Development
Project

Dam
Development
Program

21,611

1,279

Korea

5

(in US$ 000)
No

Project Title

Program Title

Loan

Local Fund

Lender

Directorate General of Housing Provision

9

National
Affordable
Housing Project

Program for
Provision of
Housing
for Low
Income
Households

450,000

0

World
Bank

Ministry of Transportation

10

Patimban Port
Development
Project (I)

Sea
Transportation
Development
Program

1,025,052

90,672

JICA

11

Construction of
Jakarta Mass
Rapid Transit
Project Phase II

Railway
Development
Program

1,869,000

0

JICA

Ministry of Research, Technology and Higher Education

12

The Plan of
Hasanuddin
University
Hospital
Development

13

Development of
World Class
University with
Socio
Entrepreneurial
Spirit at
Universitas
Gadjah Mada

Improving
Access,
Quality,
Relevance, and
Competitivene
ss of
Higher
Education
Program

6

31,520

1,667

Garmany
(KfW)

71,649

7,041

JICA

(in US$ 000)
No

Project Title

Program Title

Loan

Local Fund

Lender

Ministry of Religious Affairs

14

The
Development
and
Improvement of
Six Islamic
Higher
Education
Institutions
Project

Improving
Access,
Quality,
Relevance, and
Competitivene
ss
of Islamic
Higher
Education
Program

238,000

50,000

IDB

150,000

287,132

World
Bank

Ministry of Health

15

Indonesia
Supporting
Primary And
Refferal Health
Care Reform (ISPHERE)

Basic
Health Care
Program
Health
Services
Referral
Program

Ministry of National Development Planning/National Development Planning
Agency

16

Human
Resources
Development for
Bureaucratic
Reform
(HRDBR)

Human
Resources
Development
for
Bureaucracy
Reform
Program

150,000

0

Bank
Dunia

Agriculture
Extension,
Education,
and Training
Improvement
Program

39,885

6,799

IFAD

Ministry of Agriculture

17

Rural
Empowerment and
Agriculturel
Development
Scalling up
Innitiative (READSI)

7

(in US$ 000)
No

Project Title

Program Title

Loan

Local Fund

Lender

Ministry of Defense

18

Upgrading
Medical
Equipments for
Naval Hospital
Wahyu Slamet
Bitung-North
Sulawesi

19

Upgrading
Medical
Equipments and
Supporting
Facilities for
Army Hospital
Pelamonia

15,000

0

Austria

10,000

0

Austria

20

Procurement of
Medical
Equipments for
Army Hospital
Putri Hijau

10,000

0

Austria

21

Upgrading
Medical
Equipments and
Supporting
Facilities for
Army Hospital
Udayana

10,000

0

Austria

15,000

0

Austria

22

Upgrading
Medical
Equipments for
Air Force
Hospital Dody
Sarjoto Makassar

Military
Hospitals
Development
Program

Military
Hospitals
Development
Program

8

(in US$ 000)
No

Project Title

Program Title

Loan

Local Fund

Lender

The Agency for Meteorology, Climatology, and Geophysics

23

Strengthening
Climate and
Weather Service
Capacity – Phase
II

Program for
Development
and Guidance
of
Meteorology,
Climatology,
and
Geophysics

78,900

13,169

France

71,100

7,224

USA
(US Exim
Bank)

PT. SMI/Indonesia Infrastructure Finance Company

24

Increasing PT
Indonesia
Infrastructure
Finance
Financing
Capacity in
Accelerating
Infrastructure
Development in
Indonesia

Infrastructure
Development
Financing
Program

200,000

0

300,000

50,000

6,069,199

992,613

World
Bank

PT. PLN/State Electricity Company

25

Indramayu Coal
Fired Power
Plant #4
(1x1000MW)

Electricity
Infrastructure
Development
Program

TOTAL

9

JICA

10

Kementerian Pekerjaan Umum dan
Perumahan Rakyat/
Ministry of Public Works and Housing

11

12

Direktorat Jenderal Bina Marga/
Directorate General of Highways

13

14

GB-17-01-1
1.

Project Title

2.
3.
4.

Program Title
Executing Agency
Implementing
Agency
Duration
Location

5.
6.

: The Development of Cileunyi-Sumedang-Dawuan
(Cisumdawu) Toll Road - Phase III
: Toll Road Development Program
: Ministry of Public Works and Housing
: Directorate General of Highways, Ministry of Public Works
and Housing
: 36 months
: West Java Province

7.

Objectives
a. To strengthen the road network in West Java area in order to handle the
increasing in traffic volume.
b. To improve accessibility and capacity of road networks connecting Bandung
City and Cirebon City, as well as the proposed new airport and seaport.

8.

Scope of Project
a. Civil works: construction section I of Cileunyi-Sumedang-Dawuan Toll Road
Development for 10.57 km length.
b. Consulting services
c. Land acquisition

9.

Activities
Activities
a.
b.
c.
d.

Civil works
Consulting services
Land acquisition
Administration cost

Implementation
Locations
West
Province

15

Java

Project Implementation Units
Directorate
General
of
Highways, Ministry of Public
Works and Housing

GB-17-01-1
10. Funding Source
Funding (US $ 000)

Implementing Agency

Loan

Directorate General of
Highways, Ministry of
Public Works and
Housing
Total

Source

Grant

Local

Total

156,000

0

223,000

379,000

156,000

0

223,000

379,000

China
(Exim Bank)

11. Disbursement Plan*
Disbursement Plan (US $ 000)
1st

2nd
23,400

Total

3rd
78,000

156,000

54,600

*) Not included local fund
12. Funding Allocation
Activities

Category (US $ 000)
Services Constructions

a. Civil works
b. Consulting services

Goods

Other

3,000

c. Land acquisition

187,000

d. Others
Total

Trainings

172,000

17,000
3,000

172,000

13. Program Reference
BB-ID: BB-1519-R0-01

16

187,000

17,000

Direktorat Jenderal Cipta Karya/
Directorate General of Human Settlements

17

18

GB-17-02-0
1.
2.
3.
4.
5.
6.

Project Title

: Regency Settlement Infrastructure Development
(RSID)
Program Title
: Slum Alleviation Program
Executing Agency
: Ministry of Public Works and Housing
Implementing Agency : Directorate General of Human Settlements, Ministry of
Public Works and Housing
Duration
: 60 months
Location
: Nationwide

7.

Objectives
To prevent the spread of urban slum areas by fulfillment the minimum service
standard of settlement in peri-urban area.

8.

Scope of Project
a. Investment of infrastructure:
- Civil works (minimum service standards of infrastructure).
- Non-infrastructure works (action plan, DED, consultancy services).
b. Capacity building:
- Capacity building and campaign at national level and local government.
- Training of Management Information System (MIS).
c. Technical assistant:
- Consultant (central management, regional management and supervision
consultant).
- Management Information System (MIS) consultant.

9.

Activities
Activities

Implementation
Locations

a. Infrastructure investment
b. Capacity building

Nationwide

c. Technical assistance

19

Project Implementation
Units
Directorate General of
Human Settlements,
Ministry of Public Works
and Housing

GB-17-02-0
10. Funding Source
Funding (US $ 000)

Implementing Agency

Loan

Directorate General of
Human Settlements,
Ministry of Public Works
and Housing
Total

Grant

Local

Total

201,000

0

0

201,000

201,000

0

0

201,000

Source

JICA

11. Disbursement Plan
Disbursement Plan (US $ 000)
1st
8,196

2nd

3rd

4th

62,116

63,286

63,126

Total

5th

201,000

4,276

12. Funding Allocation
Activities
a. Infrastructure
investment

Category (US $ 000)
Services Constructions Goods Trainings
4,020

160,800

b. Capacity building
c. Technical assistance

3,500
22,630

d. Contingency
Total

Other

10,050
26,650

160,800

13. Program Reference
BB-ID: BB-1519-R0-07

20

3,500

10,050

GB-17-03-1
1.
2.
3.
4.

Project Title

: Development of National Urban Development Program
(NUDP)
Program Title
: Sustainable Urban Development Program
Executing Agency
: Ministry Public Works and Housing
Implementing Agency : a. Ministry Public Works and Housing (MPWH)
b. Ministry of National Development Planning/National
Development Planning Agency (Bappenas)
c. Ministry of Finance (MoF)
d. Ministry of Home Affairs (MoHA)
e. Ministry of Agrarian and Spatial Planning/ National
Land Agency (MASP)
f. Geospatial Information Agency (GIA)
g. Ministry of Transportation (MoT)
h. Ministry of Communication and Information
Technology (MoCI)
i. Local Governments of Selected Cities
: 30 months
: 40 cities

5.
6.

Duration
Location

7.

Objectives
a. To promote integrated urban development planning through formulation of
national urban policies consisting of urban management and financial policy,
enhancing urban planning and information, urban infrastructure, and
supporting local government capacity in urban development planning, aiming
at sustainable cities in Indonesia
b. To utilize national urban spatial system, to develop infrastructure plan in all
selected location
c. To prepare cities development project which is systematic and integrated for
creating characterized, livable, green, and smart city
d. To facilitate other implementing institutions on creating integrated
ministry/agency annual programs

8.

Scope of Project
a. Preparation of policy, institution, and finance
b. Information and planning system
c. Facilitating urban development
d. Preparation of urban master plan development

21

GB-17-03-1
9.

Activities
Activities

Implementation
Locations

Project Implementation
Units

1. Preparation
of
policy,
institution and finance
- National city policy
- National
urban
Jakarta City
development strategy
- City institution and city
coaching system
- Financial city policy

MPWH, Bappenas, MoHA

2. Information and planning
system
- Guidance of making
Regency/City Spatial Plan
Selected cities
(RTRWK) and Detailed
Spatial Plan (RDTR)
- Planning maps of 40
selected cities

MPWH, MASP, GIA, MoT,
MoCI

3. Facilitating
urban
development
- Guidance of making
Government Plan (RKP)
and Housing Provision
Jakarta City
Development Plan (RP3)
- Regulation about city
road, drinking water, city
transport, and integrated
city infrastructure

MPWH

4. Preparation
urban
development plan
- Urban baseline
- Urban
development Selected cities
strategy
- Development
scenario
and investment

MPWH, MoHA, MoF, MoT,
MoCI, Local Government

22

GB-17-03-1
10. Funding Source
Funding (US $ 000)

Implementing Agency
a.
b.

Loan

Ministry of Finance (MoF)

d.

Ministry of Home Affairs
(MoHA)

e.

Ministry of Agrarian and
Spatial Planning/ National
Land Agency (MASP)
Geospatial Information
Agency (GIA)
Ministry of Transportation
(MoT)
Ministry of Communication
and Information Technology
(MoCI)
Local Government of
Selected Cities

g.
h.

i.

Local

Source

Total

Ministry Public Works and
Housing (MPWH)
Ministry of National
Development
Planning/National
Development Planning
Agency (Bappenas)

c.

f.

Grant

Total

49,610

0

0

49,610

49,610

0

0

49,610

World
Bank

11. Disbursement Plan
Disbursement Plan (US $ 000)
1st

2nd
27,157

Total

3rd
18,188

23

4,265

49,610

GB-17-03-1
12. Funding Allocation
Activities

Category (US $ 000)
Services Constructions Goods

a.

Preparation of
policy, institution,
and finance.

b.

Information and
planning system.

14,690

c.

Facilitating urban
development

2,309

d.

Preparation of urban
development plan
(including capital
investment plan).

e.

Implementation
support.
Total

888

28,087

4,000
49,610

13. Program Reference
BB-ID: BB-1519-R1-30

24

Trainings

Other

GB-17-04-0
1.
2.
3.
4.

Project Title
:
Program Title
:
Executing Agency
:
Implementing Agency :

5.
6.

Duration
Location

7.

Objectives
a. To improve services coverage and capacity of operation on Drinking Water
Supply System (SPAM) in urban areas.
b. To improve operational performance of selected District Owned Water Supply
Operators (PDAMs)/Local Governments.
c. To strengthen the urban water supply policy framework at central and local
government level.

8.

Scope of Project
a.
b.

c.

d.

National Urban Water Supply Project (NUWSP)
Drinking Water Development Program
Ministry Public Works and Housing
a. Directorate General of Human Settlements, Ministry
Public Works and Housing
b. Directorate General of Fiscal Balance, Ministry of
Finance
c. Directorate General of Regional Development,
Ministry of Home Affairs
d. Local Governments (to be selected)

: 48 months
: Nationwide

Investment support for urban drinking water supply infrastructure through
giving seed grant, matching grant and performance based grant.
Technical assistance and capacity building for District Owned Water Supply
Operators (PDAMs)/Local Governments through performance improvement in
range of technical, financial, commercial, managerial, human resources, and
other areas.
Advisory and policy development support for central government in order to
strengthen the policies of urban water supply investment, as well as service
deliver framework and roadmap.
Project management and implementation support.

25

GB-17-04-0
9.

Activities
Activities

Implementation
Location

Project Implementation Unit

Nationwide

a. Directorate
General
of
Human
Settlements,
Ministry Public Works and
Housing
b. Directorate General of Fiscal
Balance, Ministry of Finance
c. Directorate General of
Regional Development,
Ministry of Home Affairs
d. Local Governments (to be
selected)

b. Investment support
for urban water
supply infrastructure
c. Technical assistance
and capacity building
d. Advisory and policy
development support
e. Program management
and implementation
support
10. Funding Source
Implementing Agency

Funding (US $ 000)
Loan

Grant

Directorate General of
Human Settlements,
Ministry Public Works and
Housing

74,000

Directorate General of Fiscal
Balance, Ministry of Finance

25,000

Directorate General of
Regional Development,
Ministry of Home Affairs
Total

Local

Total

0

184,800

284,800

0

184,800

284,800

Source

World
Bank

1,000
100,000

11. Disbursement Plan
Disbursement Plan (US $ 000)
1st

2nd

15,000

3rd

25,000

30,000

*) Not included local fund.

26

Total
4th
30,000

100,000

GB-17-04-0
12. Funding Allocation
Category (US $ 000)
Activities

Services

a. Investment support
for urban water
supply
infrastructure

70,000

b. Technical assistance
and capacity
building

6,500

c. Advisory and policy
development
support

5,000

d. Program
management and
implementation
support
Total

Construction
Goods Trainings Other
s

3,500

15,000

26,500

70,000

*) Not included local fund.
13. Program Reference
BB-ID: BB-1519-R0-04

27

3,500

28

Direktorat Jenderal Sumber Daya Air/
Directorate General of Water Resources

29

30

GB-17-05-2
1.

5.
6.

: The Urgent Rehabilitation of Strategic Irrigation for
Western Region of Indonesia
Program Title
: Development and Management of Irrigation Program
Executing Agency
: Ministry of Public Works and Housing
Implementing Agency : Directorate General of Water Resources, Ministry of
Public Works and Housing
Duration
: 48 months
Location
: Lampung and Banten Province

7.

Objectives

2.
3.
4.

Project Title

To increase agricultural production, create employment opportunities and improve
socio-economic conditions of the rural population in the project area through the
provision of assured irrigation & drainage facilities, improved flood control, farm
road system, and village water supply.
8.

Scope of Project
a. Rehabilitation and modernization of irrigation facilities.
b. Improvement of irrigation and drainage system.
c. Operation and maintenance capacity building.

9.

Activities
Activities
a. Construction works
b. Consulting services
c. Land acquisition

Implementation
Locations

Project Implementation
Units

Lampung and
Banten Province

Directorate General of
Water Resources, Ministry
of Public Works and
Housing

10. Funding Source
Implementing Agency

Funding (US $ 000)
Loan

Grant

Local

Total

Directorate General of
Water Resources, Ministry
of Public Works and
Housing

195,778

0

27,150

222,928

Total

195,778

0

27,150

222,928

31

Source

Korea
(EDCF)

GB-17-05-2
11. Disbursement Plan
Disbursement Plan (US $ 000)
1

st

27,837

Total

2nd

3rd

4th

5th

43,724

27,837

61,765

61,765

222,928

12. Funding Allocation
Category (US $ 000)
Activities

Services

a. Construction
works
b. Consulting
services

Constructions

Trainings

Other

143,180
11,834

c. Land acquisition

8,167

d. Contingency

41,749

e. Others
Total

Goods

17,998
11,834

143,180

13. Program Reference
BB-ID: BB-1519-R0-08

32

67,913

GB-17-06-2
1. Project Title

: Integrated Participatory Development and
Management of Irrigation Project - Phase I
2. Program Title
: Development and Management of Irrigation Program
3. Executing Agency
: Ministry of Public Works and Housing
4. Implementing Agency : a. Directorate General of Water Resource, Ministry of
Public Works and Housing
b. The Agency for Agricultural Extension and Human
Resources Development, Ministry of Agriculture
c. Ministry of Home Affairs
d. Ministry of National Development Planning/
National Development Planning Agency
e.Local Government
5. Duration
6. Location
7.

: 60 months
: Nationwide

Objectives
To increase rice production, to accelerate poverty alleviation in agriculture on
western and eastern region of Indonesia by means of the establishment of
sustainable irrigated agriculture development in the participative manner
emphasizing the empowerment of the beneficiary farmers and water user's
organization.

8.

Scope of Project
a. Supporting the integrated development of irrigation facilities through
participatory sustainable integrated development (SID), construction phase,
and operation & maintenance (O&M) activities.
b. Participatory rehabilitation of rehabilitation system.
c. Forming and empowerment of water user's association (WUAs).
d. Empowerment of O&M officers.
e. Implementation of irrigation’s asset management.
f. Improvement of tertiary and on-farm level.
g. Improvement of conservatory catchment area through public consultation and
dissemination.

33

GB-17-06-2
9.

Activities
Activities

Implementation
Location

Project Implementation Unit

Nationwide

a. Directorate General of Water
Resource, Ministry of Public
Works and Housing
b. The Agency for Agricultural
Extension and Human
Resources Development,
Ministry of Agriculture
c. Ministry of Home Affairs
d. Ministry of National
Development Planning/
National Development
Planning Agency
e. Local Government

a. Civil works
b. Procurement of
equipment
c. Consulting services
d. Training and workshop
e. Rehabilitation of
irrigation scheme
(District Level)
f. Rehabilitation of
irrigation scheme
(Province Level)

10. Funding Source
Implementing Agency
a. Ministry of Public
Works and Housing

Funding (US $ 000)
Loan

Grant

Local

Total

363,030

0

23,348

386,378

b. Ministry of Home
Affairs

22,673

0

18,224

40,897

c. Provincial Local
Government

67,172

0

0

67,172

147,125

0

0

147,125

600,000

0

41,564

641,572

d. District Local
Government
Total

Source

ADB

*) Not including IFAD loan source (has already signed) USD 100 million.

34

GB-17-06-2
11. Disbursement Plan
Disbursement Plan (US $ 000)
1

st

138,000

Total

2nd

3rd

4th

5th

150,000

138,000

102,000

72,000

600,000

*) Not included local fund

12. Funding Allocation
Activities

Category (US $ million)
Services

Constructions

a. Civil works
rehabilitation

Trainings

404.352

b. Vehicle and
equipment
c. Consulting
services

Goods

33.850
1.339

48.547

d. Workshop,
training,
socialization

10.254

e. Survey and
studies

76.107

f. Institutional
capacity building

12.486

g. Contingency
Total

Other

13.064
137.14

404.352

*) Not included local fund

13. Program Reference
BB-ID: BB-1519-R0-08

35

1.339

10.254

46.914

GB-17-07-2
1.
2.
3.
4.
5.
6.

Project Title

: Engineering Service for Coastal and River
Development Project
Program Title
: Mitigation of Water Hazard Program
Executing Agency
: Ministry of Public Works and Housing
Implementing Agency : Directorate General of Water Resources, Ministry of
Public Works and Housing
Duration
: 36 months
Location
: Nationwide

7.

Objectives
To ensure the high priority projects are implemented efficiency by advancing
preparatory activities in a systematic manner through engineering services.

8.

Scope of Project
a. Compose the documents regarding project preparations, consist of; (i) master
plan, (ii) feasibility study, (iii) detail design, (iv) environmental and social
impact assessment (AMDAL), and (v) land acquisition and resettlement action
plan (LARAP).
b. Strengthen the capabilities of human resources of river and coastal’s
stakeholder.

9.

Activities
Activities

Implementation
Location

Consulting
services

Nationwide

Project Implementation Unit
Directorate General of Water
Resources, Ministry of Public Works
and Housing

10. Funding Source
Implementing Agency

Funding (US $ 000)
Loan

Grant

Local

Total

Directorate General of
Water Resources,
Ministry of Public
Works and Housing

10,094

0

1,116

11,210

Total

10,094

0

1,116

11,210

36

Source

Korea (EDCF)

GB-17-07-2
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st

2nd
6,351

Total

3rd
3,706

11,210

1,153

12. Funding Allocation
Activities
a. Consulting services

Category (US $ 000)
Services Constructions Goods

b. Others
Total

Trainings

Other

9,842
1,368
9,842

1,368

13. Program Reference
BB-ID: BB-1519-R0-11

37

GB-17-08-2
1.
2.
3.
4.
5.
6.

Project Title

: Engineering Service for Dam Multipurpose
Development Project
Program Title
: Dam Development Program
Executing Agency
: Ministry of Public Works and Housing
Implementing Agency : Directorate General of Water Resources, Ministry of
Public Works and Housing
Duration
: 36 months
Location
: Nationwide

7.

Objectives
To ensure that high priority projects are implemented efficiently by advancing
preparatory activities in a systematic manner through engineering services.

8.

Scope of Project
a. Compose the documents regarding project preparations, consist of; (i) master
plan, (ii) feasibility study, (iii) detail design, (iv) environmental and social
impact assessment (AMDAL), and (v) land acquisition and resettlement action
plan (LARAP).
b. Strengthen the capabilities of human resources of river and dam’s stakeholder.

9.

Activities
Activities

Implementation
Location

Consulting
services

Nationwide

38

Project Implementation Unit
Directorate General of Water
Resources, Ministry of Public
Works and Housing

GB-17-08-2
10. Funding Source
Funding (US $ 000)

Implementing Agency

Loan

Directorate General of Water
Resources, Ministry of Public
Works and Housing
Total

Grant

Local

Total

21,611

0

1,279

22,890

21,611

0

1,279

22,890

Source
Korea
(EDCF)

11. Disbursement Plan
Disbursement Plan (US $ 000)
1

2nd

st

12,968

Total

3th
7,567

22,890

2,355

12. Funding Allocation
Activities
a. Consulting services

Category (US $ 000)
Services Constructions Goods

Other

20,067

b. Others
Total

Trainings

2,823
20,067

2,823

13. Program Reference
BB-ID: BB-1519-R0-10

39

40

Direktorat Penyediaan Perumahan/
Directorate General of Housing Provision

41

42

GB-17-09-2
1.
2.

5.
6.

: National Affordable Housing Project
: Program for Provision of Housing for Low Income
Households
Executing Agency
: Ministry of Public Works and Housing
Implementing Agency : a. Directorate General of Housing Finance, Ministry of
Public Works and Housing
b. Directorate General of Housing Provision, Ministry
of Public Works and Housing
Duration
: 36 months
Location
: Nationwide

7.

Objectives

3.
4.

Project Title
Program Title

To increase access to affordable housing for low-income households through
technical and financial support.
8.

Scope of Project
a. Down payment assistance for housing finance.
b. Self-help housing.
c. Technical assistance for strengthening housing sector management.

9.

Activities
Activities

Implementation
Locations

Project Implementation
Units

Nationwide

a. Directorate General of
Housing Finance,
Ministry of Public
Works and Housing
b. Directorate General of
Housing Provision,
Ministry of Public
Works and Housing

a. Down payment assistance
for housing finance.
b. Self-help housing.
c. Technical assistance for
strengthening housing
sector management.

43

GB-17-09-2
10. Funding Source
Funding (US $ 000)*

Implementing Agency

Loan

a. Directorate General of
Housing Finance,
Ministry of Public
Works and Housing
b. Directorate General of
Housing Provision,
Ministry of Public
Works and Housing
Total

Grant

Local

Source

Total

450,000

0

0

450,000

450,000

0

0

450,000

World
Bank

11. Disbursement Plan
Disbursement Plan (US $ 000)
1st

2nd

3rd

4th

95,860

158,780

162,680

32,680

Total
450,000

12. Funding Allocation
Activities

Category (US $ 000)
Services Constructions

a. Down payment
assistance for
housing finance.

215,000

b. Self-help housing.

215,000

c. Technical assistance
for strengthening
housing sector
management.
Total

20,000

20,000

430,000

13. Program Reference
BB-ID: BB-1519-R0-13

44

Goods

Trainings

Other

Kementerian Perhubungan/
Ministry of Transportation

45

46

GB-17-10-0
1.
2.
3.
4.

Project Title
Program Title
Executing Agency
Implementing
Agency

5.
6.

Duration
Location

7.

Objectives

:
:
:
:

Patimban Port Development Project (I)
Sea Transportation Development Program
Ministry of Transportation
1. Directorate General of Sea Transportation, Ministry of
Transportation.
2. Directorate General of Highways, Ministry of Public of
Works and Housing
: 84 months
: Subang Regency, West Java Province

To strengthen the port logistic capacity of Jakarta Metropolitan Area in order to
handling the excess capacity of Tanjung Priok Port by constructing an international
seaport and access road in Subang Regency of West Java Province.
8.

Scope of Project
a. Procurement/construction of: (i) Terminal phase 1-1 (land reclamation, soil
improvement, quay wall, yard pavement, building and utility within the port
facilites, port inner road at sea side, etc), dredging for Basin (depth -10m), and
other related construction works; (ii) Dredging for access channel (depth -10m),
seawall and revetment, breakwater, navigation aids, and other related
construction works; (iii) Connecting bridge, utility within the bridge facilities;
(iv) Access road at land side, utility within access road facilities; (v) Access road
around the port; (vi) Parts of terminals for phase 1-2 (land Reclamation, soil
improvement, quay wall, pavement, permanent building), extension of existing
jetty, and other related construction works; (vii) Dredging for harbor basin.
b. Consulting services for:
- Port related facilities development.
o Construction supervisory service of phase 1-1 construction works.
o Detailed design and draft P/Q documents, tender document
preparation of phase 1-2.
o Tender assistants and construction supervisory service of phase 1-2.
- Access road development.
- Port operator selection.
c. Land acquisition

47

GB-17-10-1
9.

Activities
Activities
a. Procurement/constructio
n
b. Consulting services
c. Land acquisition

Implementation
Locations

Project Implementation
Units

Subang Regency,
West Java
Province

a. Directorate General of
Sea Transportation,
Ministry of
Transportation
b. Directorate General of
Highways, Ministry of
Public of Works and
Housing

10. Funding Source
Implementing Agency

Funding (US $ 000)
Loan

Grant

Local

Total

0

85,518

1,011,130

Directorate General of
Sea Transportation,
Ministry of
Transportation

925,612

Directorate General of
Highways, Ministry of
Public of Works and
Housing

99,440

0

5,154

104,594

1,025,052

0

90,672

1,115,724

Total

Source

JICA

11. Disbursement Plan
Disbursement Plan (US $ 000)
1

st

96,103

2

nd

301,340

3rd

4th

298,034 316,158

*) Not included local funding

48

5th

6th

7th

6,546

6,526

345

Total
1,025,052

GB-17-10-1
12. Funding Allocation
Category (US $ 000)
Activities

Services

a. Procurement/
construction
b. Consulting services

Construc
-tions

Trainings

Other

975,025
50,034

c. Land acquisition

37,543

d. Others
Total

Goods

178,379
50,034

975,025

*) Not included local funding
13. Program Reference
BB-ID:BB-1519-R1-32

49

215,922

GB-17-11-1
1.
2.
3.
4.

Project Title

: Construction of Jakarta Mass Rapid Transit (MRT)
North-South Line Project Phase-II
Program Title
: Railway Development Program
Executing Agency
: Ministry of Transportation
Implementing Agency : a. Ministry of Transportation
b. Local Government of DKI Jakarta

5.
6.

Duration
Location

7.

Objectives

: 72 months
: DKI Jakarta Province

To increase the transport capacity in Jakarta Metropolitan Area which also covers
the northern region through the advanced development of Jakarta Mass Rapid
Transit System in order to reduce congestion and give contribution to improving the
investment climate in Jakarta Metropolitan Area.
8.

Scope of Project
a. Supervisory/technical assistance consulting services.
b. Construction of MRT Phase-I and MRT Phase-II with proposed plan of contract
packages as follow: (i) Additional loan of variation order MRT Phase-I (Lebak
Bulus-Bundaran HI); (ii) Underground 1 : Civil work MRT Phase-II (Bundaran
HI – Harmoni); (iii) Underground 2 : Civil work MRT Phase-II (Harmoni –
Kampung Bandan).
c. Procurement of MRT Phase II with proposed plan of contract packages as
follow: (i) Procurement of track works and systems; (ii) Procurement of rolling
stock.

9.

Activities
Activities

Implementation
Locations

Project Implementation
Units

a. Variation order
b. Civil works: (i) Underground (1)
+ (2); (ii) Railways system; (iii)
Rolling stock; (iv)Substation
building; (v) River diversion;
(vi) Elevated guide way and
station; (vii) Depot
c. Procurement
d. Consulting services

DKI Jakarta
Province

a. Ministry of
Transportation
b. Local Government
of DKI Jakarta

50

GB-17-11-1
10. Funding Source
Implementing Agency
Ministry of
Transportation
Local Government of
DKI Jakarta
Total

Funding (US $ 000)
Loan

Grant

Local

Total

1,869,000

0

0

1,869,000

1,869,000

0

0

1,869,000

Source

JICA

11. Disbursement Plan
Disbursement Plan (US $ 000)
1st

2nd

133,654

326,980

3rd
259,770

4th

5th

6th

404,255

474,296

269,864

Total
1,869,000

12. Funding Allocation*
Category (US $ 000)
Activities
a. MRT Phase-I
variation order

Services Constructions
14,241

b. MRT Phase-II
civil works and
procurement
c. MRT Phase -II
consulting
services
Total

Goods

Training
s

Other

176,693

1,185,770

458,329

1,362,463

458,329

33,786
48,027

13. Program Reference
BB-ID: BB-1519-R0-28

51

52

Kementerian Riset, Teknologi, dan
Perguruan Tinggi/
Ministry of Research, Technology, and
Higher Education

53

54

GB-17-12-2

3.
4.
5.
6.

: The Plan of Hasanuddin University Hospital
Development
Program Title
: Improving Access, Quality, Relevance, and
Competitiveness of Higher Education Program
Executing Agency
: Ministry of Research, Technology and Higher Education
Implementing Agency : Ministry of Research, Technology and Higher Education
Duration
: 48 months
Location
: Makassar City

7.

Objectives

1.
2.

Project Title

To improve the medical education quality in Hasanuddin University through
medical science and technology development by integrating education research and
health care service with international standards.
8.

Scope of Project
a. Completion of structure B, C and D building to increase the number of patient
served.
b. Procurement of equipment, covers:
i. Mandatory equipment for B class hospital accreditation.
ii. Five centers of excellence.
iii. Radiology and clinical pharmacy.
iv. Simulation center.
v. Research laboratory.
c. Human resources development.
d. Development of telemedicine and management information system.
e. Management and consulting services.

9.

Activities
Activities

Implementation
Location

Project Implementation
Unit

a. Civil works
b. Procurement of equipment.
c. Human resource development
d. System development and
telemedicine
e. Management and consulting
services.

Hasanuddin
University, South
Sulawesi

Ministry of Research,
Technology and Higher
Education

55

GB-17-12-2

10. Funding Source
Implementing Agency
Ministry of Research,
Technology and Higher
Education
Total

Funding (US $ 000)
Loan

Grant

Local

Total

31,520

0

1,667

33,187

31,520

0

1,667

33,187

Source

Germany
(KfW)

11. Disbursement Plan
Disbursement Plan (US $ 000)
1st

2nd
300

3rd

15,100

4th

10,760

Total
31,520

5,360

*) Not included local funding

12. Funding Allocation
Activities

Category (US $ 000)
Services Constructions Goods Trainings

a. Civil works
b. Procurement of
equipment

13,20
0

c. System development
and telemedicine
d. Management and
consulting services

Other

12,600

1,160
1,530

e. Contingency

3,030

Total
1,530

12,600

*) Not included local funding
13. Program Reference
BB-ID: BB-1519-R0-17

56

13,20
0

1,160

3,030

GB-17-13-2
1.

Project Title

: Development of World Class University with Socio
Entrepreneurial Spirit at Universitas Gadjah Mada
: Improving Access, Quality, Relevance, and
Competitiveness of Higher Education Program
: Ministry of Research, Technology and Higher
Education
: Universitas Gadjah Mada
: 60 months
: D.I. Yogyakarta Province

2.

Program Title

3.

Executing Agency

4.
5.
6.

Implementing Agency
Duration
Location

7.

Objectives
a. Increasing the achievement of accreditation for study programs.
b. Increasing the quality of students, study programs, and research activities.
c. Promoting the welfare of the academicians.
d. Improving the ability of teaching staff to do research in order to increase the
number of scientific publications.
e. Preparing qualified graduates who have spirit of entrepreneurship.

8.

Scope of Project
a. Construction of new buildings for:
Learning centers for smart and green, law, animal science, integrated
forest farming, agro tropical, dental, advanced pharmaceutical science,
teaching industry.
Laboratories for animal science.
Engineering research innovation center (ERIC).
Field research center.
b. Equipment procurement for:
Faculty of engineering (existing building).
Dental learning center.
Smart and green learning center.
ERIC building
Teaching industry learning center.
Advanced pharmaceutical science learning center.
c. Human resources development and curriculum design.
d. Consultant services for detailed engineering design, management and
supervision, as well as equipment procurement.
e. Project management.

57

GB-17-13-2
9.

Activities
Activities

Implementation
Location

Project
Implementation Unit

D.I. Yogyakarta
Province

Universitas Gadjah
Mada

a. Civil works
b. Equipment procurement
c. Human resources development
and curriculum design
d. Consulting services
e. Project management
10. Funding Source

Funding (US $ 000)

Implementing Agency

Loan

Universitas Gadjah Mada
Total

Source

Grant

Local

Total

71,649

0

7,041

78,690

71,649

0

7,041

78,690

Japan
(JICA)

11. Disbursement Plan
Disbursement Plan (US $ 000)

Total

1st

2nd

3rd

4th

5th

4,354

18,837

22,426

27,259

5,814

78,690

12. Funding Allocation
Activities

Category (US $ 000)
Services

Constructions

a. Civil works

Goods

b. Equipment
procurement

14,615

c. Human resources
development and
curriculum design
d. Consulting services
e. Project
management
Total

Trainings

57,038

1,455

5,227
355
5,582

57,038

13. Program Reference
BB-ID: BB-1519-R0-17
58

14,615

1,455

Other

Kementerian Agama/
Ministry of Religious Affairs

59

60

GB-17-14-2
1.
2.
3.
4.

Project Title

: The Development and Improvement of Six Islamic
Higher Education Institutions Project
Program Title
: Improving Access, Quality, Relevance, and
Competitiveness of Islamic Higher Education Program
Executing Agency
: Ministry of Religious Affairs
Implementing Agency : a. UIN Antasari
b. UIN Imam Bonjol
c. UIN Sultan Maulana Hasanuddin
d. UIN Sultan Thaha Saifuddin
e. UIN Raden Intan Lampung
f. UIN Sunan Ampel Surabaya

5.
6.

Duration
Location

: 48 Months
: South Kalimantan, West Sumatera, Banten, Jambi,
Lampung , and East Java Provinces

7.

Objectives
a. To provide advanced and sufficient infrastructure and facilities for providing a
wider access of education for people to the higher education.
b. To construct new buildings for existings and new faculties as well as academic
supporting units, including laboratories, libraries, training and study centers,
and offices, as well as other supporting facilities and infrastructures.
c. To deliver better education which is relevant to job demand and promote
Islamic moderateness.
d. To improve qualification and competence of teaching and non-teaching staffs
for building resource sharing of pedagogic insights, research findings, and good
academic practices.

8.

Scope of Project
Development and improvement of six islamic higher education institutions (UIN
Antasari, UIN