WINRIP DOC CRO Laporan Pengamatan Bid Opening Paket 07 20150820 00313

ANTI CORRUPTION ACTION PLAN (ACAP)
RENCANA TINDAK ANTI KORUPSI (RTAK)

LAPORAN PEMANTAUAN KEGIATAN PEMBUKAAN PENAWARAN
PENGADAAN JASA PEKERJAAN KONSTRUKSI
Oleh:

WAKIL PENGAMAT DARI MASYARAKAT (WPM)
Nama WPM : Ir. Riswandi, M.Si
Nama Paket : 07, Indrapura – Tapan
Provinsi
: Sumatera Barat

Laporan Hasil Pengamatan Proses Pengadaan Jasa Pekerjaan Konstruksi

DAFTAR ISI

DAFTAR ISI
I.
II.
III.

IV.

i
IKLAN PELELANGAN
PEMASUKAN PENAWARAN
PEMBUKAAN PENAWARAN
PENGUMUMAN PENAWARAN

1
1
2
4

LAMPIRAN

i

K E M E N T E R I A N P E K E R J A A N U M U M
D A N P E R U M A H A N R A K Y A T
DI REK T ORAT J EN DERAL BI N A M ARGA


DI REK T ORAT PEN GEM BAN GAN J ARI N GAN J ALAN

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT (WINRIP)
IBRD LOAN No. 8043-ID

RENCANA TINDAK ANTI KORUPSI (RTAK)
ANTI-CORRUPTION ACTION PLAN (ACAP)

LAPORAN HASIL PENGAMATAN
PROSES PENGADAAN JASA KONSTRUKSI

Nama WPM
Nomor Paket
Nama Paket
Provinsi

:
:
:

:

Ir. Riswandi, M.Si
07
Indrapura – Tapan
Sumatera Barat

LAPORAN HASIL PENGAMATAN PROSES PENGADAAN JASA
KONSTRUKSI
TAHAP KEDUA

LAPORAN TAHAP 2
Pemasukan/Pembukaan Penawaran (Bid Opening)
Laporan mencakup kegiatan Iklan Pelelangan, Pemasukan Penawaran, dan Pembukaan
Penawaran.

Bagian ini melaporkan tentang Iklan Pelelangan
Sebutkan metode procurement paket yang dipantau:
Full e-procurement
Sebutkan media pemasangan iklan :

Website Kementerian Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia
http://www.pu.go.id
Pembukaan dokumen penawaran dilakukan pada hari Kamis tanggal 13 Agustus 2015
bertempat di Ruang Rapat Kantor Balai Besar Pelaksanaan Jalan Nasional (BBPJN) II Padang,
Jl. Jati No. 109 Padang. Dokumen penawaran diterima paling lambat tanggal 13 Agustus 2015
pukul 10.00 waktu setempat.

Bagian ini melaporkan tentang Pemasukan Penawaran

Berdasarkan pengamatan Saudara, berapa jumlah
memasukkan Dokumen Penawaran: 11
Sebutkan nama-nama rekanan/perusahaan tersebut:
1. PT Jaya Konstruksi M. P. Alamat : Jakarta
2. PT Multi Structure. Alamat : Jakarta
3. PT MUK (JO) PT Suburo. Alamat : Jakarta
4. PT Adhi Karya (Persero). Alamat: Medan
5. PT Conbloc Infratecno. Alamat : Jakarta
6. PT Bumi Karsa. Alamat : Makassar
7. PT Nindya Karya. Alamat : Medan
8. PT Hutama Karya. Alamat : Medan

9. PT Yasa Patria Perkasa. Alamat : Jakarta

rekanan/perusahaan

yang

1

Laporan Hasil Pengamatan Proses Pengadaan Jasa Konstruksi

10. PT PP (JO) PT Perkasa JIP. Alamat : Pekanbaru
11. PT Waskita Karya. Alamat : Padang

Bagian ini melaporkan tentang kegiatan Pembukaan Penawaran
Tanggal pembukaan penawaran: 13 Agustus 2015 Lokasi:
Pelaksanaan Jalan Nasional II Padang, Jl. Jati No. 109 Padang..

Ruang Rapat, Balai Besar

Apakah kegiatan ini berlangsung sesuai tanggal dan lokasi yang dicantumkan dalam dokumen

pelelangan/atau Dokumen Perubahan yang telah disetujui?
Ya
Berapa jumlah peserta pelelangan orang hadir? 12 orang
Sebutkan nama rekanan/perusahaan yang diwakilinya ?
1. A. Muhaimin Syakur/ PT PP – PJIP KSO
2. Wiwien Iskandar/
3. Sugianto/ PT Hutama Karya
4. Muhali/ PT Yasa Patria Perkasa
5. Hartono Teguh/ PT Multi Structure
6. Afandi Heru. P/ PT Adhi Karya
7. Herli Fajri/ PT Nindya Karya
8. Rindi Silvia/ PT Nindya Karya
9. Prasetyo Utomo/ PT Jaya Konstruksi
10. Sri Rahmayanti/ PT Nindya Karya
11. Subhan Faozi/ PT Conbloc Infratecno
12. Abik Supriadi/ PT Waskita Karya (Persero), Tbk

Apakah ada rekanan/perusahaan yang ‘mengundurkan diri’?
Tidak Ada
Pada saat pemeriksaaan kelengkapan dokumen penawaran, apakah ada saksi dari Peserta

Lelang dipilih oleh para Peserta Lelang lainnya ? Sebutkan:
Ada
1. Dokumen PT Jaya Konstruksi M.P
Saksi : Sri Rahmayanti (PT Nindya Karya) dan Subhan Faozi (PT Conbloc
Infratecno)
2. Dokumen PT Multi Structure
Saksi : Sri Rahmayanti (PT Nindya Karya) dan Subhan Faozi (PT Conbloc
Infratecno)
3. Dokumen PT Mutu Utama Konstruksi (JO) PT Suburo Jayana Indah Corp.
Western Indonesia National Roads Improvement Project (WINRIP) IBRD Loan No: 8043-ID

2

Laporan Hasil Pengamatan Proses Pengadaan Jasa Konstruksi

Saksi : Sri Rahmayanti (PT Nindya Karya) dan Subhan Faozi (PT Conbloc
Infratecno)
4. Dokumen PT Adhi Karya
Saksi : Sri Rahmayanti (PT Nindya Karya) dan Subhan Faozi (PT Conbloc
Infratecno)

5. Dokumen PT Conbloc Infratecno
Saksi : Sri Rahmayanti (PT Nindya Karya) dan Afandi Heru P. (PT Adhi
Karya (Persero), Tbk)
6. Dokumen PT Bumi Karsa
Saksi : Sri Rahmayanti (PT Nindya Karya) dan Subhan Faozi (PT Conbloc
Infratecno)
7. Dokumen PT Nindya Karya
Saksi : Afandi Heru P. (PT Adhi Karya (Persero), Tbk) dan Subhan Faozi (PT
Conbloc Infratecno)
8. Dokumen Hutama Karya
Saksi : Sri Rahmayanti (PT Nindya Karya) dan Subhan Faozi (PT Conbloc
Infratecno)
9. Dokumen PT Yasa Patria Perkasa
Saksi : Sri Rahmayanti (PT Nindya Karya) dan Subhan Faozi (PT Conbloc
Infratecno)
10. Dokumen PT Pembangunan Perumahan (JO) PT Perkasa Jaya Inti Persada
Saksi : Sri Rahmayanti (PT Nindya Karya) dan Subhan Faozi (PT Conbloc
Infratecno)
11. Dokumen PT Waskita Karya
Saksi : Sri Rahmayanti (PT Nindya Karya) dan Subhan Faozi (PT Conbloc

Infratecno)
Apakah penawaran yang ada unsur harga dari perusahaan Peserta Lelang sudah diparaf oleh
semua Panitia Lelang serta saksi dari peserta lelang?
Sudah
Berdasarkan pengamatan Saudara, sampai dengan batas waktu pemasukan, apakah ada
Dokumen Penawaran yang terlambat dimasukkan tetapi dokumen tersebut dibuka oleh Pokja
Pengadaan?
Tidak ada
Berdasarkan pengamatan Saudara, apakah ada penawaran dari Peserta Lelang yang
digugurkan?
Tidak ada
Berdasarkan pengamatan Saudara, apakah ada dokumen penawaran yang sudah dibuka oleh
Pokja Pengadaan, tetapi nilai penawarannya tidak dibacakan?
Tidak ada

Western Indonesia National Roads Improvement Project (WINRIP) IBRD Loan No: 8043-ID

3

Laporan Hasil Pengamatan Proses Pengadaan Jasa Konstruksi


Apakah setiap lembar Berita Acara ditandatangani oleh semua anggota Pokja Pengadaan dan
para saksi yang hadir?
Ya
Berdasarkan pengamatan Saudara, apakah ada unsur-unsur KKN mulai dari tahap pemasukan
sampai berakhirnya pembukakan penawaran?
Tidak
Apakah ada komentar lain pada tahap ini ?
Tidak

Bagian ini melaporkan tentang Pengumuman Pemenang
Pokja Pengadaan akan mengumumkan pemenang dan memberitahukan kepada Peserta Lelang
mengenai keputusan ini.
Apakah Anda selaku WPM menerima foto copy surat formal dari Pokja Pengadaan tentang
pengumuman pemenang lelang?
Ya
Apakah Anda mendapat penjelasan lengkap dan meyakinkan dari Pokja Pengadaan (atau
wakilnya) mengenai kenapa pemenang dipilih diatas penawar yang lain?
Tidak
WPM sudah menerima copy No Objection Letter (NOL) dari Bank Dunia terhadap

Bid Evaluation Report (BER) dan Notification of Award dari POKJA.
Berdasarkan pengamatan Saudara, apakah
pengumuman/penjelasan untuk pemenang lelang?
Tidak

ada

pengaduan

tertulis

pada

saat

Apakah ada permintaan tanya jawab berkaitan dengan pengumuman Pemenang Lelang ?
Tidak

Western Indonesia National Roads Improvement Project (WINRIP) IBRD Loan No: 8043-ID

4

 
 

 
  
  

DAFTARLAMPIRAN
Lampiran 1.

Undangan Pemasukan dan Pembukaan Dokumen Penawaran

Lampiran 2.

Berita Acara Pemasukan dan Pembukaan Dokumen Penawaran

Lampiran 3.

Persetujuan Bank Dunia terhadap Bid Evaluation Report

Lampiran 4.

Surat Penetapan Pemenang Pelelangan Umum

ii

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

IDIREKTORAT JENDERAL BINA MARGA

DIREKTORAT PENGETBAilGAN JARIilGAN JALAN
Jdan

Nornor
Tanggal
Lampiran

Hinura

lto. 20

F.dryan

Bmr

- Jakarta Sddar

(121 10)

T@1

021-7200n1,7393928 Fax. 021-72017ffi

7sm 1r'ts /6? lptq
(

9 oktober 2015

2 bmbar

Yth : Bapak Direktur Pembangunan J*[s
: Direktur Pengembangan Jaringan Jalan
Dari
Fe+[hal : Penyampaian Perset,,iuan Bank Dunia terhadap Bidding Evaluation Repod

Kepada

Faket ffo,07: Indrapura
80/B-lD

-

Tapan di Provinsi Sumatra Barat; WNRIP Loan IBRD

Bersanra ini kami sampaikan surat dai Bank Dunia Ref. WlNRlPfrzSE tanggal 12 Oktaber ffi{Sperf,ial
tersebut diatas (copy surat terlampir). Dalam suratnya disampaikan hal-halsebagai berikut :
Tapan sesuai
1, Bank Dunia menyetujui calon pemenang kontrak paket no. 07: Indrapura
rcRomen