EO PMOS SWG Improved way of expressing the timeliness of EO Product acquisition and processing
All Fields marked with * are mandatory.
Change Request 316
#:
Assigned OGC 13-093
Document #:
Name: *Steven Smolders
Organization: *GIM nv
Email: *steven.smolders@gim.be
Document
Name/Version:
*+-",+/-#('--)+(2%( ,+/-#(',,.+&'-,
OGC Project
Document:
*
+
-"#,#,+/#,#('( )+/#(.,,.,,#(''1(."/"'!*.,-.&+then check here:
'-+-"'.&+"+
'-+-"/,#('.&+-"-1(.++/#,#'!"+
Title:
Source:
*
[EO PMOS SWG] Improved way of expressing the timeliness of EO Product acqu
*
Work item code:
Category:
*
B (Addition of feature)
Reason for *
change:
Allow better expression of the timeliness of EO product acquisition and processing.
Summary of *
change:
Addition within the EarthObservationResult/product/ProductInformation
class of a new optional property �timeliness� that
specifies the timeliness of the product acquiistion, such as
"near real time" or "rush". Possible values are
mission specific and shall refer to mission/ground segment dedicated
codeSpace. Example of values are "NRT" or
"NOMINAL"
The current ProcessingInformation/processingMode element is
constrained to a fixed enumeration with values that are not generally
applicable and through which the timeliness cannot be correctly
expressed. It is proposed to change the type of this element to a
mission/ground segment specific codelist . Examples of values are
�NRT�, �NOMINAL�, NOMINAL,
REPROCESSED, BACKLOGGED, VALIDATE
(
Consequences if
not approved:
Clauses affected: *
Section 8.1.1 and 8.1.4: UML diagrams and tables.
Additional ('
Documents
affected:
Supporting
Documentation:
Comments:
Status:
Assigned To:
Disposition:
Assigned
EO PMOS SWG
Referred
(
Change Request 316
#:
Assigned OGC 13-093
Document #:
Name: *Steven Smolders
Organization: *GIM nv
Email: *steven.smolders@gim.be
Document
Name/Version:
*+-",+/-#('--)+(2%( ,+/-#(',,.+&'-,
OGC Project
Document:
*
+
-"#,#,+/#,#('( )+/#(.,,.,,#(''1(."/"'!*.,-.&+then check here:
'-+-"'.&+"+
'-+-"/,#('.&+-"-1(.++/#,#'!"+
Title:
Source:
*
[EO PMOS SWG] Improved way of expressing the timeliness of EO Product acqu
*
Work item code:
Category:
*
B (Addition of feature)
Reason for *
change:
Allow better expression of the timeliness of EO product acquisition and processing.
Summary of *
change:
Addition within the EarthObservationResult/product/ProductInformation
class of a new optional property �timeliness� that
specifies the timeliness of the product acquiistion, such as
"near real time" or "rush". Possible values are
mission specific and shall refer to mission/ground segment dedicated
codeSpace. Example of values are "NRT" or
"NOMINAL"
The current ProcessingInformation/processingMode element is
constrained to a fixed enumeration with values that are not generally
applicable and through which the timeliness cannot be correctly
expressed. It is proposed to change the type of this element to a
mission/ground segment specific codelist . Examples of values are
�NRT�, �NOMINAL�, NOMINAL,
REPROCESSED, BACKLOGGED, VALIDATE
(
Consequences if
not approved:
Clauses affected: *
Section 8.1.1 and 8.1.4: UML diagrams and tables.
Additional ('
Documents
affected:
Supporting
Documentation:
Comments:
Status:
Assigned To:
Disposition:
Assigned
EO PMOS SWG
Referred
(