EO PMOS SWG Improved way of expressing the timeliness of EO Product acquisition and processing

All Fields marked with * are mandatory.
Change Request 316
#:
Assigned OGC 13-093
Document #:
Name: *Steven Smolders
Organization: *GIM nv
Email: *steven.smolders@gim.be
Document
Name/Version:

*+-",+/-#('--)+(2%( ,+/-#(',,.+&'-, 

OGC Project
Document:

* 
+

 -"#,#,+/#,#('( )+/#(.,,.&#,,#(''1(."/"'!*.,-.&+then check here:
'-+-"'.&+"+

'-+-"/,#('.&+-"-1(.++/#,#'!"+

Title:
Source:

*

[EO PMOS SWG] Improved way of expressing the timeliness of EO Product acqu

*

Work item code:

Category:

*

B (Addition of feature)

Reason for *

change:

Allow better expression of the timeliness of EO product acquisition and processing.

Summary of *
change:

Addition within the EarthObservationResult/product/ProductInformation
class of a new optional property �timeliness� that
specifies the timeliness of the product acquiistion, such as
"near real time" or "rush". Possible values are
mission specific and shall refer to mission/ground segment dedicated
codeSpace. Example of values are "NRT" or
"NOMINAL"

The current ProcessingInformation/processingMode element is
constrained to a fixed enumeration with values that are not generally
applicable and through which the timeliness cannot be correctly
expressed. It is proposed to change the type of this element to a
mission/ground segment specific codelist . Examples of values are

�NRT�, �NOMINAL�, NOMINAL,
REPROCESSED, BACKLOGGED, VALIDATE

( 


Consequences if
not approved:

Clauses affected: *
Section 8.1.1 and 8.1.4: UML diagrams and tables.

Additional ('
Documents
affected:
Supporting
Documentation:
Comments:
Status:
Assigned To:

Disposition:

Assigned

EO PMOS SWG

Referred


(