ANALISIS BATA INTERLOCK SEBAGAI ALTERNATIF BAHAN PELINDUNG TEBING SUNGAI YANG RAMAH LINGKUNGAN (STUDI KASUS KALI PEPE SURAKARTA) THE ANALYSIS OF INTERLOCK BRICK FOR RIVER BANK PROTECTION (CASE STUDY KALI PEPE SURAKARTA) SKRIPSI

  

ANALISIS BATA INTERLOCK SEBAGAI

ALTERNATIF BAHAN PELINDUNG TEBING

SUNGAI YANG RAMAH LINGKUNGAN

(STUDI KASUS KALI PEPE SURAKARTA)

  

THE ANALYSIS OF INTERLOCK BRICK FOR

RIVER BANK PROTECTION

(CASE STUDY KALI PEPE SURAKARTA)

  

SKRIPSI

Diajukan sebagai Salah Satu Syarat Memperoleh Gelar Sarjana

Pada Program Studi Teknik Sipil Fakultas Teknik

  

Universitas Sebelas Maret

Disusun Oleh :

  

IKA YULIANA

I0113063

PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK

UNIVERSITAS SEBELAS MARET

SURAKARTA

2017

  

ANALISIS BATA INTERLOCK SEBAGAI

ALTERNATIF BAHAN PELINDUNG TEBING

SUNGAI YANG RAMAH LINGKUNGAN

(STUDI KASUS KALI PEPE SURAKARTA)

  

THE ANALYSIS OF INTERLOCK BRICK FOR

RIVER BANK PROTECTION

(CASE STUDY KALI PEPE SURAKARTA)

  

SKRIPSI

Diajukan sebagai Salah Satu Syarat Memperoleh Gelar Sarjana

Pada Program Studi Teknik Sipil Fakultas Teknik

  

Universitas Sebelas Maret

Disusun Oleh :

  

IKA YULIANA

I0113063

  Telah disetujui untuk dipertahankan dihadapan Tim Penguji Pendadaran Program Studi Teknik Sipil Fakultas Teknik Universitas Sebelas Maret Surakarta

  Persetujuan : Dosen Pembimbing I, Dosen Pembimbing II,

  

Ir. Agus Hari Wahyudi, Msc Ir. Adi Yusuf Muttaqien, MT

  NIP. 19630822 198903 1 002 NIP. 19581127 1988 1 001

  PENGESAHAN SKRIPSI ANALISIS BATA INTERLOCK SEBAGAI ALTERNATIF BAHAN PELINDUNG TEBING SUNGAI YANG RAMAH LINGKUNGAN (STUDI KASUS KALI PEPE SURAKARTA) THE ANALYSIS OF INTERLOCK BRICK FOR RIVER BANK PROTECTION

  (CASE STUDY KALI PEPE SURAKARTA)

  Disusun Oleh :

IKA YULIANA I0113063

  Telah dipertahankan dihadapan Tim Penguji Pendadaran Program Studi Teknik Sipil Fakultas Teknik Universitas Sebelas Maret Surakarta pada :

  Hari : Selasa Tanggal : 28 November 2017

  Tim Penguji

  Nama/NIP Tanda Tangan

  1. Ir Agus Hari Wahyudi, Msc NIP. 19630822 198903 1 002 ..................................

  2. Ir. Adi Yusuf Muttaqien, M.T.

  NIP. 19581127 198803 1 001 ..................................

  3. Ir. Koosdaryani Soeryodarundio, M.T.

  NIP. 19541127 198601 2 001 ……………………..

  4. Ir. Solichin, M.T.

  NIP. 19600110 199803 1 002 ……………………..

  Disahkan, Tanggal : ........................................ Kepala Program Studi Teknik Sipil Fakultas Teknik UNS

  Wibowo, ST, DEA

  NIP. 19671007 199502 1 001

  

MOTTO

  Lakukan yang terbaik, karena Allah tau apa yang terbaik bagi kita Memang baik menjadi orang penting, tapi lebih penting menjadi orang baik

  Berkarya, bukan berkarir, karena karya yang besar pasti menjadi karir yang tinggi, sedang karir yang tinggi belum tentu menjadi karya yang besar Pendidikan merupakan perlengkapan paling baik untuk hari tua.(Aristoteles)

  Musuh yang berasal dari diri kita yaitu rasa malas dan rasa tidak percaya diri Bekerja dengan jujur dan cerdas, you can do anything, but not everything

  

Real leaders is an ordinary man with extraordinary determination

Finally, take care of your body, it’s the only place you have to live

  

PERSEMBAHAN

  Alhamdulillahirabbil’alamin. Sujud syukur saya persembahkan kepada Allah SWT atas terselesaikannya Skripsi ini. Sebuah karya kecil ini saya persembahkan kepada: Allah SWT : Allah yang mempunyai 99 nama mulia, yang selalu punya rencana indah untuk kehidupan, kepada-Mu lah aku memohon perlindungan dan pertolongan , Ibunda Nurhayati , Ayahanda Heri Sutrasno Terimakasih njih pak buk, atas segala kesabaran,dukungan, dan doa selama ini, akhirnya anakmu ini bisa menyelesaikan skripsi setelah sekian lama.

  Bismillah, bersabarkan sedikit lagi yaa. Semoga cita-cita untuk membahagiakan kalian satu-persatu akan terwujud. Adik Tercinta Niken Desty Wijayanti Terima kasih telah menjadi the one and only saudara perempuan yang bisa diandalkan. Yang selalu menghiburku disaat stress skripsi melanda. Semangat jugaa ya kuliahnya, yuk bareng bareng bahagiakan orangtua kita bareng- bareng. Ganbatte sis ! Dosen pembimbing skripsi Terimakasih kepada bapak Ir. Agus Hari Wahyudi,Msc dan bapak Ir. Adi Yusuf Muttaqien atas segala bimbingan dan bantuan dalam penyelesaian skripsi saya selama ini. Semoga bapak selalu diberikan kesehatan dan kebahagiakan baik di dunia maupun akhirat kelak. amin My Best Motivator Muhammad Abi Rafdi Terimakasih untuk 4 tahun ini atas segala bentuk dukungan, suport, pertolongan, motifasi yang tidak terhitung jumlahnya. Termakasih untuk rela bolak balik solo-klaten untuk menemaniku menyelesaikan skripsi ini. Sungguh Ika tak bisa menyelesaikan skripsi ini dengan baik tanpa abi. Sahabat Terbaikku Ulfandari Yudianti, Ayu Ismoyo, Avivatun Niswah Terimakasih atas segala semangat yang kalian beri padaku. Kenangan yang sudah kita lalui selama 4 tahun ini jangan sampai dilupakan yaa. Semoga kita dipertemukan lagi suatu saat dalam keadaan sukses bersama ^^

  

ABSTRAK

  Ika Yuliana, 2017. Analisis Bata Interlock Sebagai Alternatif Bahan Pelindung

  

Tebing Sugai yang Ramah Lingkungan (Studi Kasus Kali Pepe Surakarta)

Skripsi. Program Studi Teknik Sipil. Fakultas Teknik. Universitas Sebelas Maret.

  Surakarta. Percepatan pembangunan infrastuktur di Indonesia terus berkembang pesat. Perkembangan ini disertai dengan kebutuhan semen yang melonjak tinggi dan mendorong pemerintah untuk mengeksploitasi kawasan kars untuk dijadikan pabrik semen, dimana notabene akan mempersempit lahan dan merusak lingkungan. Beberapa tindakan harus dilakukan untuk meminimalisir penggunaan semen tersebut dengan menggunakan material ramah lingkungan. Salah satu material ramah lingkungan yang akan diteliti adalah bata Interlock yang terbuat dari tanah merah bakar. Bata Interlock adalah material penyusun dinding yang mempunyai pengait pada sisi-sisinya untuk mengunci pergerakan akibat gaya tekan. Penelitian ini bertujuan untuk mengetahui besarnya kuat tekan bata Interlock yang memenuhi syarat mutu SNI, juga mengetahui angka keamanan (SF) Tebing sungai sebelum dan sesudah adanya perkuatan bata Interlock berdasarkan analisis program

  

Geoslope . Metode penelitian dimulai dengan mencari data parameter bata Interlock

  berupa kuat tekan dan massa jenis. Kuat Tekan adalah parameter kelayakan mekanis dari bata Interlock sedangkan massa jenis digunakan dalam input data . Data sungai meliputi data topografi sungai, dan data tanah yang di

  Geoslope

  dapatkan dari data uji laboratorium . Setelah data-data tersebut di dapatkan,selanjutnya menginput data dalam analisis program Geoslope. Variasi perhitungan dibagi berdasarkan kemiringan Tebing. Kemiringan Tebing sungai

  o o o

  yang ditinjau adalah 30 , 50 , dan 60 Berdasarkan uji laboratorium , diperoleh nilai kuat tekan bata Interlock dari bata

  2

  merah adalah 2,637 N/mm dan untuk bata Interlock dari Semen adalah 4,631

2 N/mm . Menurut SNI 15-0021-1978 hasil perhitungan kuat tekan tersebut bisa

  dipakai sebagai bahan konstruksi bangunan. Selanjutnya berdasarkan pemodelan stabilitas perkuatan Tebing menggunakan aplikasi Geoslope menghasilkan angka

  o o o

  keamanan (SF) untuk Interlock dari bata merah kemiringan 30 , 50 , dan 60 berturut-turut 1,465 ; 1,023 ; dan 0,985

  

Kata kunci : Bata Interlock, Geoslope, penahan Tebing, material ramah

  lingkungan

  

ABSTRACT

  Ika Yuliana, 2017. Analysis Of Interlock Brick As Alternative Eco-Friendly River

  

Slope Protective Material (Case Study Kali Pepe Surakarta) Thesis of Civil

Engineering Department, Faculty of Engineering, Sebelas Maret University,

Surakarta .

  

Acceleration of infrastructure development in Indonesia continues to grow rapidly.

This development is accompanied by high cement demand and prompted the

government to exploit the area of kars to become a cement plant, which in fact will

narrow the land and damage the environment. Some measures should be taken to

minimize the use of such cement by using environmentally friendly materials. One

of the environmentally friendly materials to be studied is an Interlock brick made

from red soil fuel. Interlock brick is a wall building material that has hooks on its

sides to lock movement due to compressive force

This study aims to determine the magnitude of compressive strength of Interlock

brick that meets the SNI quality requirement, also know the safety number (SF) of

the river slope before and after the reinforcement of brick Interlock based on

Geoslope program analysis. The research method is started by finding the data of

brick Interlock parameter in the form of compressive strength and density. Strong

Press is a mechanical feasibility parameter of the Interlock brick while the density

is used in the input Geoslope data. River data includes topographic data of the

river, and soil data obtained from laboratory test data. After the data is obtained,

then input the data in the analysis of Geoslope program. The calculation variation

o

is divided based on the slope of the slope. The slopes of the river slopes are 30 ,

o o

  50 , and 60 Based on laboratory test, the value of compressive strength of brick Interlock

  2

from red brick is 2,637 N / mm and for Interlock brick from Cement is 4,631 N /

  2

mm . based on SNI 15-0021-1978 calculation results of the compressive strength

can be used as building construction materials. Furthermore, based on slope reinforcement stability modeling using Geoslope application yields security o o o number (SF) for Interlock of 30 , 50 , and 60 red bricks respectively 1,465; 1,023; and 0.985 Keywords : Interlock brick, Geoslope, retaining slope, environmentally friendly material

KATA PENGANTAR

  Puji syukur penyusun panjatkan kepada Tuhan Yang Maha Esa yang telah melimpahkan rahmat-Nya sehingga penyusun dapat menyelesaikan penelitian dengan judul “Analisis Bata Interlock Sebagai Alternatif Bahan Pelindung Tebing Sugai yang Ramah Lingkungan (Studi Kasus Kali Pepe Surakarta)

  ”. Penelitian ini merupakan salah satu persyaratan akademik untuk meraih gelar Sarjana pada Program Studi Teknik Sipil Fakultas Teknik Universitas Sebelas Maret Surakarta. Dalam penyusunan laporan ini, peneliti banyak menerima bantuan dari berbagai pihak, oleh karena itu kami ucapkan terima kasih kepada :

  1. Ir.Agus Hari Wahyudi MSc selaku dosen pembimbing 1 yang telah memberikan pengarahan selama penyusunan skripsi

  2. Ir.Adi Yusuf Muttaqien M,T selaku dosen pembimbing 2 yang telah memberikan pengarahan selama penyusunan skripsi dan selaku pembimbing akademik yang telah memberikan saran dan masukan selama proses perkuliahan dan penyusunan skripsi.

3. Seluruh rekan-rekan mahasiswa Teknik Sipil UNS 4.

  Seluruh pihak yang tidak dapat kami sebutkan satu persatu yang telah membantu kelancaran tugas kerja hingga terwujudnya laporan ini.

  Penyusun menyadari keterbatasan kemampuan dan pengetahuan yang penyusun miliki sehingga masih ada kekurangan dalam penyusunan skripsi ini, untuk itu penyusun mengharapkan kritik dan saran yang membangun dari para pembaca. Akhir kata semoga skripsi ini bermanfaat bagi penyusun khususnya dan pembaca umumnya.

  Surakarta, November 2017 Penyusun

  

DAFTAR ISI

  2.2.1 Teori Bata Interlock ......................................................................... 8

  3.3 Alat uji .................................................................................................... 19

  3.2 Lokasi Penelitian .................................................................................... 18

  3.1 Metode Penelitian ................................................................................... 18

  2.2.5 Geostudio Slope W/ ....................................................................... 16 BAB. 3 METODE PENELITIAN........................................................................... 8

  2.2.4 Analisis Stabilitas Konstruksi Tebing ........................................... 15

  2.2.3 Teori bangunan Pelindung Tebing Sungai .................................... 14

  2.2.2 Pengujian Kelayakan Mekanis ...................................................... 10

  2.2 Dasar Teori ............................................................................................... 8

  JUDUL ..................................................................................................................... i HALAMAN PERSETUJUAN ................................................................................ ii HALAMAN PENGESAHAN ................................................................................ iii MOTTO.................................................................................................................. iv PERSEMBAHAN ................................................................................................... v ABSTRAK ............................................................................................................. vi

  2.1 Tinjauan Pustaka ...................................................................................... 4

  1.5 Manfaat Penelitian .................................................................................... 3 BAB. 2 TINJAUAN PUSTAKA DAN DASAR TEORI ....................................... 4

  1.4 Batasan Masalah ....................................................................................... 3

  1.3 Tujuan Penelitian ...................................................................................... 3

  1.2 Rumusan Masalah .................................................................................... 2

  1.1 Latar Belakang.......................................................................................... 1

  KATA PENGANTAR ......................................................................................... viii DAFTAR ISI .......................................................................................................... ix DAFTAR GAMBAR ............................................................................................. xi DAFTAR TABEL ................................................................................................ xiii DAFTAR LAMPIRAN ........................................................................................ xiv BAB. 1 PENDAHULUAN ..................................................................................... 1

  

ABSTRACT ............................................................................................................ vii

  3.4 Bahan Uji ................................................................................................ 20

  3.5 Tahapan Penelitian ................................................................................. 20

  3.5.1 Pengumpulan data Hidrolika Sungai ............................................. 20

  3.5.2 Pengumpulan data tanah ................................................................ 23

  3.5.3 Pengadaaan sampel bata Interlock................................................. 23

  3.5.4 Pengujian Kelayakan Mekanis Material ....................................... 26

  3.5.5 Pemodelan Stabilitas Konstruksi Pelindung Sungai...................... 27

  3.6 Diagram Alir Penelitian .......................................................................... 34 BAB. 4 HASIL DAN PEMBAHASAN................................................................ 35

  4.1 Analisis Pengujian Kuat Tekan Bata Interlock ...................................... 35

  4.1.1 Pengujian Kuat Tekan Bata Interlock dari bata merah .................. 35

  4.1.2 Pengujian Kuat Tekan Bata Interlock dari bata semen ................. 38

  4.2 Analisis Massa Jenis Bata Interlock ....................................................... 41

  4.3 Data Bata Interlock ................................................................................. 43

  4.4 Data Tanah.............................................................................................. 43

  4.5 Data Tebing Sungai ................................................................................ 45

  4.6 Analisis Stabilitas Tebing Kali Pepe sebelum Perkuatan Bata Interlock 45

  4.6.1 Hasil Running Geoslope Tebing Kali Pepe Kemiringan 1:0 ......... 45

  4.6.2 Hasil Running Geoslope Tebing Kali Pepe Kemiringan 1:1 ......... 46

  4.6.3 Hasil Running Geoslope Tebing Kali Pepe Kemiringan 1:2 ......... 47

  4.6.4 Hasil Running Geoslope Tebing Kali Pepe Kemiringan 2:1 ......... 48

  4.7 Analisis Stabilitas Tebing Kali Pepe setelah Perkuatan Bata Interlock . 49

  4.7.1 Hasil Running Geoslope Tebing Kali Pepe Kemiringan 1:0 ......... 49

  4.7.2 Hasil Running Geoslope Tebing Kali Pepe Kemiringan 1:1 ......... 50

  4.7.3 Hasil Running Geoslope Tebing Kali Pepe Kemiringan 1:2 ......... 51

  4.7.4 Hasil Running Geoslope Tebing Kali Pepe Kemiringan 2:1 ......... 52

  4.8 Rekapitulasi Hasil Running Geoslope .................................................... 52 BAB. 5 KESIMPULAN DAN SARAN................................................................ 53

  5.1 Kesimpulan ............................................................................................ 53

  5.2 Saran ...................................................................................................... 55 DAFFTAR PUSTAKA ......................................................................................... 56

  DAFTAR GAMBAR

Gambar 2.1 Bata Interlock................................................................................. 8Gambar 2.2 Compressor Testing Machine (CTM) ............................................ 9Gambar 2.3 Sketsa Bata Sebelum Pengujian................................................... 10Gambar 2.4 Sketsa Bata Setelah Pengujian ..................................................... 10Gambar 3.1 Peta Lokasi Penelitian di Kali Pepe ........................................... 18Gambar 3.2 Compressor Testing Machine (CTM) .......................................... 19Gambar 3.3 Bahan Uji ..................................................................................... 20Gambar 3.4 Profil Tebing Kali Pepe dengan Kemiringan Rencana 1:0 .......... 21Gambar 3.5 Profil Tebing Kali Pepe dengan Kemiringan Rencana 1:1 .......... 21Gambar 3.6 Profil Tebing Kali Pepe dengan Kemiringan Rencana 1:2 .......... 21Gambar 3.7 Profil Tebing Kali Pepe dengan Kemiringan Rencana 2:1 .......... 22 Gambar 3.8 Profil Tebing Kali Pepe dengan Perkuatan Bata Interlock .............

  Kemiringan 1:0 ............................................................................ 22

Gambar 3.9 Profil Tebing Kali Pepe dengan Perkuatan Bata Interlock .............

Kemiringan 1:1 ............................................................................ 22

Gambar 3.10 Profil Tebing Kali Pepe dengan Perkuatan Bata Interlock ...........

Kemiringan 1:2 ............................................................................ 23

Gambar 3.11 Profil Tebing Kali Pepe dengan Perkuatan Bata Interlock ...........

Kemiringan 2:1 ............................................................................ 23

Gambar 3.12 Alat Cetak Bata Interlock Tampak Samping ............................. 23Gambar 3.13 Alat Cetak Bata Interlock Tampak Atas .................................... 23Gambar 3.14 Hasil Cetakan Bata Interlock Sebelum Pembakaran ................. 25Gambar 3.15 Pengeringan Bata Interlock di dalam Ruangan ......................... 25Gambar 3.16 Bata Interlock setelah dibakar ................................................... 26Gambar 3.17 Jendela Awal Geoslope.............................................................. 28Gambar 3.18 Jendela Awal KeyIn Analysis .................................................... 28Gambar 3.19 Jendela Set Page ........................................................................ 29Gambar 3.20 Jendela Pemodelan Tebing ........................................................ 29Gambar 3.21 Jendela Pendefinisian Parameter Tanah dan Bata Interlock ...... 30Gambar 3.22 Jendela Area Parameter dan Bata Interlock ............................... 30Gambar 3.23 Jendela Pembebanan Tanah ....................................................... 31Gambar 3.24 Jendela Penggambaran Slip Surface Radius .............................. 31Gambar 3.24 Jendela Penggambaran Slip Surface Grid.................................. 32Gambar 3.26 Jendela Pemeriksaan Data ......................................................... 32Gambar 3.27 Jendela Hasil Analisis ................................................................ 33Gambar 3.28 Diagram Alir Penelitian ............................................................. 34Gambar 4.1 Profil Tebing Kali Pepe dengan Kemiringan Rencana 1:0 .......... 44Gambar 4.2 Profil Tebing Kali Pepe dengan Kemiringan Rencana 1:1 .......... 44Gambar 4.3 Profil Tebing Kali Pepe dengan Kemiringan Rencana 1:2 .......... 44Gambar 4.4 Profil Tebing Kali Pepe dengan Kemiringan Rencana 2:1 .......... 45 Gambar 4.5 Hasil Running Geoslope sebelum Perkuatan Bata Interlock ..........

  Kemiringan 1:0 ............................................................................ 44

Gambar 4.6 Hasil Running Geoslope sebelum Perkuatan Bata Interlock ..........

Kemiringan 1:1 ............................................................................ 46

Gambar 4.7 Hasil Running Geoslope sebelum Perkuatan Bata Interlock ..........

Kemiringan 1:2 ............................................................................ 47

Gambar 4.8 Hasil Running Geoslope sebelum Perkuatan Bata Interlock ..........

Kemiringan 2:1 ............................................................................ 48

Gambar 4.9 Hasil Running Geoslope setelah Perkuatan Bata Interlock ............

dari Bata Merah Kemiringan 1:0 ................................................. 49

Gambar 4.10 Hasil Running Geoslope setelah Perkuatan Bata Interlock ..........

dari Bata Merah Kemiringan 1:1 ................................................. 50

Gambar 4.11 Hasil Running Geoslope setelah Perkuatan Bata Interlock ..........

dari Bata Merah Kemiringan 1:2 .................................................. 51

Gambar 4.12 Hasil Running Geoslope setelah Perkuatan Bata Interlock ..........

dari Bata Merah Kemiringan 2:1 .................................................. 52

  

DAFTAR TABEL

Tabel 2.1 Novelty Penelitian dan Metode yang Digunakan ................................. 6Tabel 2.2 Contoh Analisis Kuat Tekan Bata ..................................................... 11Tabel 2.3 Contoh Rekapitulasi Hasil Perhitungan Kuat Tekan Bata Merah ..... 12Tabel 2.4 Kekuatan tekan rata-rata batu bata (SNI-0021-1978) ....................... 13Tabel 2.5 Nilai Safety Factor untuk Perancangan Tebing ................................ 15Tabel 2.6 Hubungan nilai Safety dan Kemungkinan Kelongsoran Tebing ...... 16Tabel 4.1 Data Kuat Tekan Bata Interlock dari Bata Merah ............................. 35Tabel 4.2 Rekapitulasi Hasil Perhitungan Kuat Tekan Bata Interlock dari Bata

  ............. Merah ................................................................................................. 37

Tabel 4.3 Data Kuat Tekan Bata Interlock dari Semen ..................................... 38Tabel 4.4 Rekapitulasi Hasil Perhitungan Kuat Tekan Bata Interlock dari

  ................. Semen ................................................................................................ 40

Tabel 4.5 Data Massa Jenis Bata Interlock dari Bata Merah ............................ 41Tabel 4.6 Rekapitulasi Hasil Perhitungan Massa Jenis Bata Interlock dari Bata

  ............. Merah ................................................................................................ 42