PERENCANAAN KAPAL GENERAL CARGO MV âEL-JALLALUDDIN RUMMYâ 3250 BRT. - Diponegoro University | Institutional Repository (UNDIP-IR)
BAB II
PERHITUNGAN RENCANA GARIS (LINES PLAN)
A. PERHITUNGAN DASAR
A.1. Panjang Garis Air Muat (Lwl) Lwl = Lpp + 2 % x Lpp Lwl = 116,1 + 2 % x 116,1 Lwl = 118,42 m
A.2. Panjang Displacement (L.Displ) L Displ = 0,5 x (Lwl + Lpp) L Displ = 0,5 x (118,42 + 116,1) L Displ = 117,26 m
A.3. Coefisien Midship (Cm) Formula Arkent Bont Shocker Cm = 0,90 + 0,10 x Cb
Cm = 0,90 + 0,10 x 0,69
Cm = 0,98 Memenuhi Syarat kapal barang sedang (Cm = 0,95 ~ 0,99)
A.4. Coefisien Prismatik (Cp) Formula Troast
Cp =
Cm Cb
Cp =
98 , 0
69 , 0
Cp = 0,704 Memenuhi Syarat kapal barang sedang (Cp = 0,68 ~ 0,82)
A.5. Coefisien Garis Air (Cw) Formula Troast Cw = Cb0,025
(2)
Cw = 0,690,025
Cw = 0,805 Memenuhi Syarat kapal barang sedang (Cw = 0,80 ~ 0,87)
A.6. Luas Garis Air (Awl)
Awl = Lwl x B x Cw (m2) Awl = 118,42 x 19,00 x 0,805 Awl = 1811,23 m2
A.7. Luas Midship (Am)
Am = B x T x Cm (m2) Am = 19,00 x 7,8 x 0,98
Am = 145,230 m2
A.8. Volume Displacement (C Displ)
V Displ = Lpp x B x T x Cb (m3) V Displ = 116,1 x 19,00 x 7,80 x 0,69 V Displ = 11872,15 m2
A.9. Coefisien Prismatik Displacement (Cp Displ) Cp Displ = (
Displ L
Lpp
. ) x Cp
Cp Displ = ) 26 , 117
1 , 116
( x 0,704
Cp Displ = 0,69
A.10.Displacement (D)
D = Vol Displ x
x m (Ton) Dimana :
= 1,025 Berat jenis air laut(3)
Maka :
D = 11872,15 x 1,025 x 1,004 D = 12217,62 Ton
B. MENENTUKAN LETAK LCB
B.1. Dengan menggunakan Cp Displacement pada grafik NSP pada Cp Displacement = 0,685 didapat letak titik LCB (Longitudinal Centre Bouyancy) = 0,52 % x L Displ. Dimana L Displ = 113,12 m.
Cp Displ = (
Displ L
Lpp
. ) x Cp
Cp Displ = (
9 , 109
1 , 116
) x 0,704 Cp Displ = 0,69
a. Letak LCB Displ menurut grafik NSP LCB Displ = 1,5 % x L Displ LCB Displ = 1,5 % x 116,10
LCB Displ = 1,758 m (Di depan midship Lpp) b. Jarak midship () L Displ ke FP
Displ = 0,5 x L Displ Displ = 0,5 x 117,26 Displ = 58,63 m c. Jarak midship () Lpp ke FP
Lpp = 0,5 x Lpp Lpp = 0,5 x 116,10 Lpp = 58,05 m
d. Jarak antara midship () L Displ dengan midship () Lpp = Displ - Lpp
= 58,63 – 58,05
(4)
e. Jarak antara LCB terhadap midship () Lpp = 1,758 - 0,58
= 1,178 m (Di depan Lpp)
B.2. Menurut Diagram NSP Dengan Luas Tiap Station (Am) = 145,23 m2
ordinat %
% thd
AM FS Hasil FM HASIL
AP 0 0 1 0 -10 0
1 0.12 17.4276 4 69.7104 -9 -627.394 2 0.251 36.45273 2 72.90546 -8 -583.244 3 0.421 61.14183 4 244.5673 -7 -1711.97 4 0.701 101.8062 2 203.6125 -6 -1221.67 5 0.85 123.4455 4 493.782 -5 -2468.91 6 0.914 132.7402 2 265.4804 -4 -1061.92 7 0.95 137.9685 4 551.874 -3 -1655.62 8 0.978 142.0349 2 284.0699 -2 -568.14
9 1 145.23 4 580.92 -1 -580.92
10 1 145.23 2 290.46 0 0
2 = -10479.8
11 1 145.23 4 580.92 1 580.92
12 1 145.23 2 290.46 2 580.92
13 0.988 143.4872 4 573.949 3 1721.847 14 0.943 136.9519 2 273.9038 4 1095.615 15 0.842 122.2837 4 489.1346 5 2445.673 16 0.747 108.4868 2 216.9736 6 1301.842 17 0.546 79.29558 4 317.1823 7 2220.276 18 0.345 50.10435 2 100.2087 8 801.6696 19 0.131 19.02513 4 76.10052 9 684.9047
FP 0 0 1 0 10 0
1 = 5976.215 3 = 11433.67 a. h =
20 .Displ L
h = 20
26 , 117
h = 5,863 m b. Volume Displacement
(5)
V Displ =
3 1
x 5,863 x 5976,215 V Displ = 11667,83 m3
c. Letak LCB NSP LCB NSP =
1 3 2
x h
LCB NSP =
215 , 5976 11433,67 8 , 10479
x 5,863
LCB NSP = 0,159 x 5,863
LCB NSP = 0,932 m ( di depan L Displ ) d. Koreksi prosentase penyimpangan LCB
= Displ L NSP LCB -Displ LCB
x 100 %
=
117,26 0,932 -1,758
x 100 % = 0.00075 x 100 %
= 0,075 % < 0,1 % ( Memenuhi) e. Koreksi prosentase penyimpangan untuk volume Displ
= Awal Displ Vol NSP Displ Vol -Awal Displ Vol
x 100 %
=
11872,15 11667,83
-11872,15
x 100 % = 0,0021 x 100 %
= 0,21 % < 0,5 % (Memenuhi)
B.3. Perhitungan prismatik depan (Qf) dan koefisien prismatik belakang (Qa) berdasarkan label “Van Lamerent”.
Dimana :
Qf = Koefisien prismatik bagian depan midship Lpp Qa = Koefisien prismatik bagian belakang midship Lpp e = Perbandingan jarak LCB terhadap Lpp
(6)
= (
1 , 116
178 , 1
) x 100 % = 1,014 %
Dengan rumus tersebut diatas dapat dihitung harga Qa dan Qf dengan rumus berikut :
Qa = Qf = Cp (1,4 + Cp) x e Dimana :
Qf = Cp + (1,40 + Cp) x e
= 0,704 + (1,40 + 0,704) x 0,001014 = 0,725
Qa = Cp - (1,40 + Cp) x e
= 0,704 - (1,40 + 0,704) x 0,001014 = 0,682
Tabel CSA lama menurut Van Lamerent (Lama) Am = 145,253 m2 No. Ord % Luas Station % Luas station thd Am
AP 0 0
0,25 0,088 12,780
0,5 0,187 17,158
0,75 0,291 42,261
1 0,395 57,365
1,5 0,595 86,411
2 0,758 110,084
2,5 0,879 127,657
3 0,953 138,404
4 0,999 145,084
5 1 145,23
6 0,991 145,021
7 0,906 131,578
7,5 0,808 117,345
(7)
8,5 0,504 73,195
9 0,324 47,054
9,25 0,234 33,983
9,5 0,148 21,494
9,75 0,069 10,020
FP 0 0
∑ = 1335,607
Tabel luas tiap section terhadap Am menurut Van Lamerent ( Baru ) Am = 145,23 m2
ordinat % % thd AM FS Hasil FM HASIL AP 0.009 1.30707 0.25 0.326768 -5 -1.63384 0.25 0.089 12.92547 1 12.92547 -4.75 -61.396 0.5 0.125 18.15375 0.5 9.076875 -4.5 -40.8459 0.75 0.296 42.98808 1 42.98808 -4.25 -182.699 1 0.4 58.092 0.75 43.569 -4 -174.276 1.5 0.579 84.08817 2 168.1763 -3.5 -588.617 2 0.695 100.9349 1 100.9349 -3 -302.805 2.5 0.817 118.6529 2 237.3058 -2.5 -593.265 3 0.936 135.9353 1.5 203.9029 -2 -407.806 4 0.998 144.9395 4 579.7582 -1 -579.758
5 1 145.23 2 290.46 0 0
2 = -2933.1 6 0.998 144.9395 4 579.7582 1 579.7582 7 0.942 136.8067 1.5 205.21 2 410.42 7.5 0.865 125.624 2 251.2479 2.5 628.1198 8 0.679 98.61117 1 98.61117 3 295.8335 8.5 0.547 79.44081 2 158.8816 3.5 556.0857 9 0.391 56.78493 0.75 42.5887 4 170.3548 9.25 0.272 39.50256 1 39.50256 4.25 167.8859 9.5 0.261 37.90503 0.5 18.95252 4.5 85.28632 9.75 0.072 10.45656 1 10.45656 4.75 49.66866
FP 0 0 0.25 0 5 0
(8)
a. h =
10
Lpp
= 10
1 , 116
= 11,61 m
b. Volume Displacement pada Main Part V Displ =
3 1
x 10 Lpp
x 1
= 3 1
x 10
1 , 116
x 3094.307 = 11875,15 m3
c. Letak LCB pada Main Part =
1 3 2
x h
=
3094.307 2943.413 2933.1
-
x 11,61 = 1,037 m
d. Perhitungan pada Cant Part
No Ord Luas Station FS Hasil FM Hasil X
Y A
11,658 5,829
0
1 4 1
11,658 23,216
0
0 1 2
0 23,216
0 1= 34,974 2= 23,316
(9)
e =
2 Lpp -Lwl
=
2 1 , 116 42 , 118
= 1,16 m e. Volume Cant Part
= 3 1
x e x 1
= 3 1
x 1,16 x 34,974
= 13,509 m3
(10)
LCB Cant Part terhadap () AP
=
1 2
x e
=
34,974 23,316
x 1,16
= 0,773 m
g. Jarak LCB Cant Part terhadap () Lpp
= 2 1
x Lpp + LCB Cant Part
= 2 1
x 116,1 + 0,773 = 58,82 m ( di depan ) h. Volume Displacement total
V Displ Total = V Displ Main Part + V Displ Cant Part = 11875,15 + 13,509
= 11888,66 m3 i. LCB total terhadap () Lpp
= Awal nt Displecema Vol CP Vol CPx LCB MP MPxVol LCB . . ) . . . ( ) . . ( = 15 , 11875 ) 509 , 13 82 , 58 ( ) 15 , 11875 037 , 1
( x x
(11)
B.4. Koreksi Hasil Perhitungan
a. Koreksi untuk Volume Displacement
= VolumeDisplacement Awal
Awal nt Displaceme Volume
Total Volume
. .
. .
. .
.
x 100 %
=
66 , 11888
15 , 11872 66
,
11888
x 100 %
= 0,13 % < 0,5 % (Memenuhi) b. Koreksi untuk prosentase penyimpangan LCB
= Lpp
dshipLpp TerhadapMi
Total LCB Awal
LCB. . .
x 100 %
=
1 , 116
103 , 1 178 ,
1
x 100 %
(12)
C. RENCANA BENTUK GARIS AIR
C.1. Perhitungan Besarnya Sudut Masuk (α)
Untuk menghitung besarnya sudut masuk garis air berdasarkan Coefisien Prismatik Depan ( Qf ).
Dimana :
Pada perhitungan penentuan letak LCB, Qf = 0,725 Dari grafik Latsiun sudut masuk = 12˚
Penyimpangan = ±3˚ dipakai + 3˚
Maka besarnya sudut masuk yang diperoleh = 12˚ + 3˚ = 15˚ C.2. Perhitungan Luas Bidang Garis Air
ord y=1/2 B fs hasil
AP 3.2 0.25 0.8
0.25 3.9 1 3.9
0.5 4.8 0.5 2.4
0.75 5.3 1 5.3
1 5.5 0.75 4.125
1.5 5.7 2 11.4
2 6.1 1 6.1
2.5 7 2 14
3 8.1 1.5 12.15
4 9.5 4 38
5 9.5 2 19
6 9.5 4 38
7 8.5 1.5 12.75
7.5 7.9 2 15.8
8 6.1 1 6.1
8.5 5.2 2 10.4
9 4.6 0.75 3.45
9.25 3.8 1 3.8
9.5 2.7 0.5 1.35
9.75 1.4 1 1.4
FP 0 0.25 0
Σ 1 232,952
a. Luas garis air pada Main Part
AWL MP = 2 x 3 1
x ( 10 Lpp
(13)
= 2 x 3 1 x ( 10 1 , 116
) x 232,952 = 1801,25 m²
b. Rencana bentuk garis air pada Cant Part
No Ord 0,5 B FS Hasil
AP ½ AP 0 3,2 1,6 0 1 4 1 3,2 6,4 0 1
= 9,6
c. e = 2
Lpp -Lwl = 2 1 , 116 42 , 118
= 1,16 m
d. Luas garis air pada Cant Part (Awl Cp) Awl Cp = 2 x e x 1
= 2 x 1,16 x 9,6 = 7,416 m² e. Luas total garis air (Awl Total)
Awl Total = Luas Main Part + Luas Cant Part = 1801,25 + 7,416
= 1808,66 m² f. Koreksi luas garis air
= Awal Luas Awal Luas Total Luas . . . . .
x 100 %
= 23 , 1811 66 , 1808 23 , 1811
x 100 %
(14)
D. PERHITUNGAN RADIUS BILGA Dimana : B = 19,00 m
H = 10,80 m T = 7,80 m A = Rise Of Floor
= 0,01 x B = 0,01 x 19,00 = 0,19 m
R = Jari – jari Bilga
M = Titik pusat kelelngkungan bilga
D.1. Dalam Segitiga ABC
Tg α2 =
BC AB
=
181 , 0
050 , 9
α2 = 88,854º
α1 = 0,5 x (180 – a2) = 0,5 x (180 – 88,854) = 0,5 x 91,146
= 45,575º
D.2. Perhitungan
a. Luas Trapesium ACED
= ½ B x 0,5 {T + (T - a )}
= 0,5 x 19,00 x 0,5 {7,80 + (7,80 - 0,181)} = 73,197 m²
b. Luas AFHEDA
= ½ Luas Midship = ½ x B x T x Cm = ½ x 19,00 x 7,80 x 0,98 = 72,618 m²
c. Luas FGHCF
(15)
= 73,197 – 72,618 = 0,579 m² d. Luas FCG
= ½ x Luas FGHCF = ½ x 0,579
= 0,289 m² e. Luas MFC
= ½ x MF x FC = ½ x R x R Tg α1
Luas juring MFG = α1/360 x лR2
= Luas MFC - Luas juring MFG = (0,5 R2Tgα1) – (α1/360 x лR2)
Jadi Luas ACED - Luas AFHEDA = Luas MFC - Luas juring MFG 73,197 – 72,618 = (0,5 R2 Tg α1) – (α1/360 x лR2)
0,579 = (0,5 R2 Tg 44,425) – (44,425/360x 3,14R2)
0,579 = 0,377 R2
R2 = 5,174
R = 2,273 m
E. MERENCANAKAN BENTUK BODY PLAN a. Merencanakan bentuk body plan adalah
Merencanakan atau membuat bentuk garis air lengkung padapotongan ordinat.
b. Langkah – langkah
1) Membuat empat persegi panjang dengan sisi ½ B dan T
2) Pada garis air T diukurkan garis b yang besarnya = ½ luas station dibagi T.
3) Dibuat persegi panjang ABCD
(16)
5) Dari titik E kita merencanakan bentuk station sedemikian sehingga luas ODE = luas OAB letak titik O dari station – station harus merupakan garis lengkung yang stream line.
6) Setelah bentuk station selesai dibuat, dilakukan pengecekan volume displacement dari bentuk-bentuk station.
7) Kebenaran dari lengkung – lengkung dapat dicek dengan menggunakan Planimeter.
E.1. Rencana Bentuk Body Plan T = 7,80m
2 T = 15,6 m
ord L station Y=1/2 B B = L sta/2T
AP 3.5 2 0.224
0.25 11.548 3.9 0.740
0.5 26.527 4.8 1.700
0.75 32.421 5.3 2.078
1 50.041 5.5 3.208
1.5 74.112 5.7 4.751
2 97.845 6.1 6.272
2.5 114.961 7 7.369
3 136.746 8.1 8.766
4 143.25 9.5 9.183
5 145.23 9.5 9.310
6 145.23 9.5 9.310
7 134.056 8.5 8.593
7.5 119.255 7.9 7.645
8 102.412 6.1 6.565
C
E D
B A
(17)
8.5 89.256 5.2 5.722
9 67.45 4.6 4.324
9.25 45.219 3.8 2.899
9.5 27.032 2.7 1.733
9.75 19.749 1.4 1.266
FP 0 0 0.000
E.2. Perhitungan Koreksi Volume Displacement Rencana Body Plan Pada Main Part
no.ord L station Fs Hasil
AP 3.5 0.25 0.875
0.25 11.548 1 11.548 0.5 26.527 0.5 13.2635 0.75 32.421 1 32.421
1 50.041 0.75 37.53075 1.5 74.112 2 148.224
2 97.845 1 97.845
2.5 114.961 2 229.922 3 136.746 1.5 205.119
4 143.25 4 573
5 145.23 2 290.46
6 145.23 4 580.92
7 134.056 1.5 201.084 7.5 119.255 2 238.51
8 102.412 1 102.412 8.5 89.256 2 178.512 9 67.45 0.75 50.5875 9.25 45.219 1 45.219
9.5 27.032 0.5 13.516 9.75 19.749 1 19.749
FP 0 0.25 0
Σ 1 3070.718 a. Displasment perhitungan
= Lpp x B x T x Cb
= 116,1 x 19,00 x 7,80 x 0,69 = 11872,15 m3
b. Volume displasment main part = 1/3 x Lpp/10 x
(18)
= 0,333 x 11,6 x 3070.718 = 11871,794 m3
c. Perhitungan Koreksi Volume Displacement Rencana Body Plan Pada Cant Part
No Ord Luas Station FS Hasil FM Hasil
X 3,5 1 3,5 0 0
Y 1,75 4 7 1 7
A 0 1 0 2 0
1
= 10,5 2 = 7 d. e =
2 LPP LWL
=
2 1 , 116 42 , 118
= 1,16 m e. Volume Cant Part
= 1/3 x e x 1 = 1/3 x 1,16 x 10,5 = 4,055 m3
f. Volume Displacement perencanaan Total = Vol Displ MP + Vol Displ CP = 11871,794 + 4,055
= 11875,849 m3
g. Koreksi penyimpangan volume displacement body plan
= 100%
. .
. . .
.
x Awal
Displ Vol
awal Displ Vo ntotal Perencanaa Displ
Vol
=
11872,15 11872,15
11875,849
x 100 % = 0,00185 x 100%
(19)
F. PERHITUNGAN CHAMBER, SHEER DAN BANGUNAN ATAS F.1. Perhitungan Chamber
Chamber = 1/50 x B = 1/50 x 19,00 = 0,38 m F.2. Perhitungan Sheer Standart
a. Bagian Buritan (Belakang)
1) AP = 25 (Lpp/3 + 10) = 25 (116,1/3 + 10) = 1217,5 mm 2) 1/6 Lpp dari AP = 11,1 (Lpp/3 + 10)
= 11,1(116,1/3 + 10) = 540,57 mm 3) 1/3 Lpp dari AP = 2,8 (Lpp/3 + 10)
= 2,8 (116,1/3 + 10) = 136,36 mm b. Bagian Midship (Tengan) = 0 m
c. Bagian Haluan (Depan)
1) FP = 50 (Lpp/3 + 10) = 50 (116,1/3 + 10) = 2435 mm
2) 1/6 Lpp dari FP = 22,2 (Lpp/3+10) = 22,2 (116,1/3 + 10) = 10081,14 mm 3) 1/3 Lpp dari FP = 5,6 (Lpp/3 + 10)
= 5,6 (116,1/3 + 10) = 272,72 mm
F.3. Rencana Bangunan Atas (Menurut methode Varian) a. Perhitungan Jumlah Gading
(20)
a =
500
Lpp
+ 0,48
= 500
1 , 116
+ 0,48 = 0,704 m Jarak gading besar
= 4 x Jarak gading = 4 x 0,6
= 2,4 m
Jarak Gading Besar = 4 x 0,6 = 2,4 M Jarak Gading Mayor = 187 x 0,6 = 112,2 M
Jarak gading Minor = 3 x 0.5 = 1,5 M +
Jumlah = 116,10 M
Jarak gading :
AP – frame 191 = 0,6 x 191 = 114,6 m frame 191 – frame FP = 0,5 x 3 = 1,5 m +
Lpp = 116,1 m Jumlah jarak gading keseluruhan = 194 gading
b. Poop Deck (Geladak Kimbul)
Panjang Poop Deck (20 % - 30 %) Lpp dari AP Panjang = 20 % x Lpp
= 0,20 x 116,1
= 23,22 m, direncanakan 23,4 m dari AP
Rencana letak gading
39 jarak gading x 0,6 = 23,4 m 39 jarak gading dari AP = 23,4 m
Tinggi poop deck 2,0 s/d 2,4 m, direncanakan 2,2 m dari main deck bentuk disesuaikan dengan bentuk buttock line.
(21)
c. Fore Castle Deck (Deck Akil)
Panjang fore castle deck (10% - 15 %) Lpp dari FP Panjang = 10 % x Lpp
= 10 % x 116
= 11,6 m, direncanakan 11,7 m dari FP Rencana letak gading
17 jarak gading x 0,6 = 10,2 m 3 jarak gading x 0,5 = 1,5 m + 19 jarak gading dari FP = 11,7 m dari FP
Tinggi deck akil 2,0 s/d 2,4 m diambil 2,2 m dari main deck.
G. PERHITUNGAN UKURAN DAUN KEMUDI Perhitungan ukuran daun kemudi
Perhitungan kemudi menurut BKI 2006 Vol II (hal 14 Sec.14-1. A.3) A = C1 x C2 x C3 x C4 x
100 T x L x 1,75
(m2) Dimana :
A = Luas daun kemudi dalam m2
L = Panjang kapal = 116,10 m
T = Sarat kapal = 7,80 m
C1 = Faktor untuk type kapal = 1 C2 = Faktor untuk type kemudi = 0.7 C3 = Faktor untuk profil kemudi = 0,8
C4 = Faktor untuk rancangan type kemudi = 1,5 untuk kemudi dengan jet propeller.
Jadi :
A = 1,0 x 0,7 x 0,8 x 1,5 x
100 80 , 7 10 , 116 75 ,
1 x x
(m2) = 13,3 m2
(22)
=
3 -6,2
B x Cb Lpp 0,023 < T x Lpp A <
3 -7,2
B x Cb Lpp 0,03 = 2 , 6 00 , 19 69 , 0 10 , 116 023 , 0 x < 80 , 7 10 , 116 974 , 13 x < 2 , 7 00 , 19 69 , 0 10 , 116 03 , 0 x = 426 , 1 023 , 0 < 56 , 798 974 , 13 < 238 , 1 03 , 0
= 0,016 < 0,017 < 0,024 (Memenuhi)
G.1. Ukuran Daun Kemudi A = h x b
Dimana : h = Tinggi daun kemudi b = Lebar daun kemudi
Menurut ketentuan perlengkapan kapal ITS halaman 53 harga perbandingan h/b = 1,5 – 2,0
Diambil 1,8 sehingga 1,8= h/b h = 1,8 x b A = h x b
A = 1,8 x b xb 13,974 = 1,8 x b2
b = 13,3/1,8
= 2,68 m diambil 2,7 m
h = A/b Maka b = 2,7 m
= 13,5/2,7 h = 4,8 m
= 4,8 m diambil 5 m
Luas bagian yang dibalansir dianjurkan < 23 %, diambil 20 % dari Seluruh luas kemudi (buku perlengkapan kapal hal 52)
A’ = 20 % x A = 20 % x 13,5 =3,9 m2
(23)
Lebar bagian yang dibalansir pada potongan sembarang horizontal < 35 % dari lebar sayap kemudi (buku perlengkapan kapal hal 52). Di ambil 35 %
b’ = 30 % x b = 30 % x 2,7 = 0,8 m
Dari ukuran diatas dapat diambil ukuran daun kemudi :
Luas daun kemudi (A) = 13 m2
Luas bagian balansir (A’) = 3,9 m2
Tinggi daun kemudi (h’) = 5 m
Lebar daun kemudi (b’) = 2,7 m
Lebar bagian balansir = 0,8 m G.2. Perhitungan Gaya Kemudi
Menurut BKI 2006 Vol II (hal 14-3 Sec B.1.1) tentang gaya kemudi adalah :
Cr = 132 x A x V2 x k1 x k2 x k3 x kt (N) Dimana :
A = Luas daun kemudi = 13 m² V = Kecepatan dinas kapal = 15,4 Knots k1 = Koefisien yang bergantung pada aspek ratio (Δ)
Δ = h²/A = (5)²/13 = 1,88
k1 = 3
2 =
3 2 88 ,
1
, dimana besarnya Δ tidak boleh lebih dari 2 = 1,29
(24)
k3 = 1,15 untuk kemudi dibelakang propeller kt = 1,0 (normal)
Jadi :
Cr = 132 x 13 x (15,4)2 x 1,9 x 1,4 x 1,15 x 1,0 = 867305,467 N
H. PERHITUNGAN SEPATU KEMUDI H.1. Modulus Penampang Sepatu Kemudi
Modulus penampang dari sepatu kemudi terhadap sumbu Z, menurut BKI 2006 Vol II hal 13-3
Dimana :
Bl = Gaya kemudi dalam resultan B1 = Cr /2
Cr = Gaya Kemudi Cr = 867305,467 N B1 =
2 867305,467
= 433652,73 N
X = Jarak masing-masing irisan penampang yang bersangkutan terhadap sumbu kemudi
X = 0,5 x L50 (X minimum) L50 = L (X maximum) Dimana :
L50 = 3 10 Pr x
Cr
Dimana Pr = 3
10 x 10 L
Cr
L10 = Tinggi daun kemudi h = 5 m
Pr = 3
x10 5
867305,467
(25)
L50 = 3
10 Pr x
Cr
L50 = 3
x10 177,214
867305,467
= 4,89 m, di ambil 2,7 m X min = 0,5 x L50
= 0,5 x 2,7 = 1,35 m
k = Faktor bahan = 1,0 Wz =
80 k x X x B1
=
80
0 , 1 35 , 1
433652,73x x
= 7317,88 cm3 Wy = 1/3 x Wz
= 1/3 x 7317,88 = 1607,452 cm3
H.2. Perencanaan profil sepatu kemudi dengan plat dengan ukuran sebagai berikut :
Tinggi (h) = 30 cm = 300 mm Tebal (s) = 2 x 3 = 6 cm = 60 mm Lebar (b) = 300 mm
No b h f = b x h a F x a² Iz = 1/12 x b x h³
I 30 6 180 0 0 540
II 6 26 156 12 22464 8788
III 6 26 156 0 0 8788
IV 6 26 156 12 22464 8788
V 30 6 180 0 0 540
Σ1= 44928 Σ2= 27444
IZ = 1 + 2
(26)
Harga Wz yang akan direncanakan WZ’ = IZ/Amax, dimana Amax = 15 cm
= 72372/15 = 4824,8 cm3 Wy’ = WZ’/3 = 4824,8/3
= 1608,267 cm3
Koreksi perhitungan Wz
= 100%
.
. . . .
x n
Perhitunga Wz
n Perhitunga Wz
n Perencanaa
Wz
= 100%
356 , 4822
356 , 4822 8
, 4824
x
= 0,0005 x 100%
= 0,05 % < 0,5 % (Memenuhi Syarat)
I. STERN CLEARANCE
Ukuran diameter propeller ideal adalah (0,6 – 0,7) T Dimana T = Sarat kapal
Diambil 0,6 x T
D Propeller Ideal adalah = 0,6 x T
= 0,6 x 7,8 = 4,68 m R (Jari – jari Propeller)
= 0,5 x D Propeller = 0,5 x 4,08 = 2,34 m
Diameter Boss Propeller = 1/6 x D
= 1/6 x 4,68 = 0,78 m
(27)
Menurut konstruksi lambung BKI, untuk kapal baling - baling tunggal jarak minimal antara baling – baling dengan linggi buritan menurut aturan konstruksi BKI 2006 Vol II Sec 13 – 1 adalah sebagai berikut :
a. 0,1 x D = 0,1 x 4,68 = 0,468 m b. 0,09 x D = 0,09 x 4,68
= 0,4212 m c. 0,17 x D = 0,17 x 4,68
= 0,7956 m d. 0,15 x D = 0,15 x 4,68
= 0,702 m e. 0,18 x D = 0,18 x 4,68
= 0,8424 m f. 0,04 x D = 0,04 x 4,68
= 0,187 m
g. 2” – 3” Diambil 2,5” = 2,5 x 25,4 = 63,5 mm
Jarak poros propeller dengan Base Line adalah : = R Propeller + f + Tinggi sepatu kemudi = 3,9 + 0,1872 + 0,29
(1)
=
3
-
6,2
B
x
Cb
Lpp
0,023
<
T
x
Lpp
A
<
3
-
7,2
B
x
Cb
Lpp
0,03
=
2
,
6
00
,
19
69
,
0
10
,
116
023
,
0
x
<
80
,
7
10
,
116
974
,
13
x
<
2
,
7
00
,
19
69
,
0
10
,
116
03
,
0
x
=
426
,
1
023
,
0
<
56
,
798
974
,
13
<
238
,
1
03
,
0
= 0,016
< 0,017
< 0,024
(Memenuhi)
G.1. Ukuran Daun Kemudi
A
= h x b
Dimana : h = Tinggi daun kemudi
b = Lebar daun kemudi
Menurut ketentuan perlengkapan kapal ITS halaman 53 harga
perbandingan h/b = 1,5 – 2,0
Diambil 1,8 sehingga 1,8= h/b
h = 1,8 x b
A
= h x b
A
= 1,8 x b xb
13,974 = 1,8 x b
2b
=
13
,
3
/
1
,
8
= 2,68 m diambil 2,7 m
h
= A/b
Maka b = 2,7 m
= 13,5/2,7
h = 4,8 m
= 4,8 m diambil 5 m
Luas bagian yang dibalansir dianjurkan < 23 %, diambil 20 % dari
Seluruh luas kemudi (buku perlengkapan kapal hal 52)
A’
= 20 % x A
= 20 % x 13,5
=3,9 m
2(2)
Lebar bagian yang dibalansir pada potongan sembarang horizontal < 35
% dari lebar sayap kemudi (buku perlengkapan kapal hal 52). Di ambil
35 %
b’
= 30 % x b
= 30 % x 2,7
= 0,8 m
Dari ukuran diatas dapat diambil ukuran daun kemudi :
Luas daun kemudi (A)
= 13
m
2
Luas bagian balansir (A’)
= 3,9
m
2
Tinggi daun kemudi (h’)
= 5
m
Lebar daun kemudi (b’)
= 2,7
m
Lebar bagian balansir
= 0,8
m
G.2. Perhitungan Gaya Kemudi
Menurut BKI 2006 Vol II (hal 14-3 Sec B.1.1) tentang gaya kemudi
adalah :
Cr
= 132 x A x V
2x k1 x k2 x k3 x kt
(N)
Dimana :
A
= Luas daun kemudi
= 13 m²
V
= Kecepatan dinas kapal
= 15,4 Knots
k1
=
Koefisien yang bergantung pada aspek ratio (Δ)
Δ
= h²/A
= (5)²/13
= 1,88
k1 =
3
2
=
3
2
88
,
1
, dimana besarnya Δ tidak boleh lebih dari 2
= 1,29
(3)
k3
= 1,15 untuk kemudi dibelakang propeller
kt
= 1,0 (normal)
Jadi :
Cr
= 132 x 13 x (15,4)
2x 1,9 x 1,4 x 1,15 x 1,0
= 867305,467 N
H. PERHITUNGAN SEPATU KEMUDI
H.1. Modulus Penampang Sepatu Kemudi
Modulus penampang dari sepatu kemudi terhadap sumbu Z, menurut BKI
2006 Vol II hal 13-3
Dimana :
Bl
= Gaya kemudi dalam resultan
B1 = Cr /2
Cr
= Gaya Kemudi
Cr
= 867305,467 N
B1 =
2
867305,467
= 433652,73 N
X
= Jarak masing-masing irisan penampang yang bersangkutan terhadap
sumbu kemudi
X
= 0,5 x L
50(X minimum)
L
50= L (X maximum)
Dimana :
L
50=
310
Pr x
Cr
Dimana Pr =
3 10x
10
L
Cr
L
10= Tinggi daun kemudi h = 5 m
Pr
=
3x10
5
867305,467
(4)
L
50=
310
Pr x
Cr
L
50=
3x10
177,214
867305,467
= 4,89 m, di ambil 2,7 m
X min = 0,5 x L50
= 0,5 x 2,7
= 1,35 m
k
= Faktor bahan = 1,0
Wz
=
80
k
x
X
x
B1
=
80
0
,
1
35
,
1
433652,73
x
x
= 7317,88 cm
3Wy
= 1/3 x Wz
= 1/3 x 7317,88
= 1607,452 cm
3H.2. Perencanaan profil sepatu kemudi dengan plat dengan ukuran sebagai
berikut :
Tinggi (h) = 30 cm = 300 mm
Tebal (s) = 2 x 3 = 6 cm = 60 mm
Lebar (b) = 300 mm
No
b
h
f = b x h
a
F x a²
Iz = 1/12 x b x h³
I
30
6
180
0
0
540
II
6
26
156
12
22464
8788
III
6
26
156
0
0
8788
IV
6
26
156
12
22464
8788
V
30
6
180
0
0
540
Σ
1= 44928
Σ
2= 27444
I
Z=
1+
2= 44928 + 27444
= 72372 cm
4(5)
Harga Wz yang akan direncanakan
W
Z’
= I
Z/Amax, dimana Amax = 15 cm
= 72372/15
= 4824,8 cm
3Wy’ = WZ’/3
= 4824,8/3
= 1608,267 cm
3Koreksi perhitungan Wz
=
100
%
.
.
.
.
.
x
n
Perhitunga
Wz
n
Perhitunga
Wz
n
Perencanaa
Wz
=
100
%
356
,
4822
356
,
4822
8
,
4824
x
= 0,0005 x 100%
= 0,05 % < 0,5 %
(Memenuhi Syarat)
I. STERN CLEARANCE
Ukuran diameter propeller ideal adalah (0,6 – 0,7) T
Dimana T = Sarat kapal
Diambil 0,6 x T
D Propeller Ideal adalah
= 0,6 x T
= 0,6 x 7,8
= 4,68 m
R (Jari – jari Propeller)
= 0,5 x D Propeller
= 0,5 x 4,08
= 2,34 m
Diameter Boss Propeller
= 1/6 x D
= 1/6 x 4,68
= 0,78 m
(6)