eVALUASI HASIL RENJA TW 1 Th 2014 Bag PDE_02

2

Penyedia
an
Peralatan
dan
Perlengka
pan
Kantor
Penyedia
an
Makanan
dan
Minuman
Rapat
Koordinas
i
dan
konsultasi
ke
Luar

Daerah
PROGRA
Terpenuhinya
kebutuhan sarana dan M
PENINGK
prasarana aparatur
ATAN
SARANA
DAN
PRASAR
ANA
APARAT
UR
Pengadaa
n
Perlengka
pan
Gedung
Kantor
Pengadaa

n
Peralatan
Gedung
Kantor
Pengadaa
n
Mebeleur
Pemelihar
aan Rutin
/ Berkala
Gedung
Kantor
Pemelihar
aan Rutin
/Berkala
Kendaraa
n Dinas/
Operasion
al


Tersedianya peralatan dan
perlengkapan kantor

2 paket

139,052,500

1 paket

139,052,500

-

0

-

-

0


-

0

100%

0%

1 paket

139,052,500

50.00%

100.00%

Bag. PDE Setda.

16 kali


115,626,720

-

32,199,100

4 kali

15,334,000

0 kali

2 kali

6,196,000

2 kali

6,196,000


50%

40%

2 kali

32,199,100

56.25%

27.85%

Bag. PDE Setda.

470 kali

475,436,080

188 kali


156,310,000

94 kali

106,930,000

0 kali

4 kali

25,200,000

4 kali

25,200,000

4.25%

24%


192 kali

181,510,000

86.17%

38.18%

Bag. PDE Setda.

43,600,000

3 jenis

41,100,000

2 jenis

28,100,000


2 jenis

28,100,000

66.60%

68%

0

0

0.00%

Tersedianya
kebutuhan
Makan Minum Perkantoran

Terlaksananya

Rapat
Koordinasi dan konsultasi

Terpenuhinya
sarana dan
aparatur

kebutuhan
prasarana

Terlaksananya
kegiatan
pengadaan perlengkapan
gedung

Terlaksananya
pengadaan
gedung

kegiatan

peralatan

Terlaksananya
pengadaan
kantor

kegiatan
mebeleur

27 jenis

839,608,880

27 jenis

302,634,100

27 jenis

803,245,000

0 jenis

27 jenis

409,187,000

27 jenis

409,187,000

100%

51%

27 jenis

711,821,100

100.00%

84.78%

Bag. PDE Setda.

3 set
mebeleur

12,736,000

1 set
mebeleur

9,200,000

1 set
mebeleur

8,000,000

-

-

0

-

0

0%

0%

1 set mebeleur

9,200,000

33.33%

72.24%

Bag. PDE Setda.

27 jenis

46,486,000

27 jenis

74,467,000

27 jenis

2,531,000

27 jenis

27 jenis

1,051,000

27 jenis

1,051,000

100%

42%

27 jenis

75,518,000

100.00%

162.45%

Bag. PDE Setda.

15 mobil dan
15 motor

179,400,000

3 mobil dan 3
motor

159,334,300

3 mobil dan 3
motor

96,050,000

3 mobil dan 3
motor

3 mobil dan
3 motor

25,326,200

3 mobil dan 3
motor

25,326,200

100%

26%

3 mobil dan 3
motor

184,660,500

80.00%

102.93%

Bag. PDE Setda.

7,000,000

28 set
pakaian PDH

9,660,000

-

28 set
pakaian PDH

9,660,000

28 set
pakaian PDH

9,660,000

100%

100%

28 set pakaian
PDH

16,660,000

93.33%

93.33%

Bag. PDE Setda.

102,900,000

156 ohk

59,150,000

0 ohk

24 ohk

36,200,000

24 ohk

36,200,000

15.38%

61%

336 ohk

139,100,000

66.15%

63.04%

Bag. PDE Setda.

Terlaksananya
kegiatan
pemeliharaan gedung

Terlaksananya
kegiatan
pemeliharaan
rutin
kendaraan operasional

PROGRA
M
PENINGK
ATAN
DISIPLIN
APARAT
UR
Pengadaa
n Pakaian
Dinas
beserta
perlengka
pannya

3

PROGRA
Terwujudnya
peningkatkan
kualitas M
PENINGK
sumber daya aparatur
ATAN
KAPASIT
AS
SUMBER
DAYA
APARAT
UR
Pendidika
n
dan
Pelatihan
Formal

Peningkatan Kualitas SDA
melalui
pendidikan/pelatihan
formal

Terlaksananya pengiriman
karyawan untuk mengikuti
pendidikan/pelatihan
formal

780 ohk

220,663,200

312 ohk