PT PELABUHAN INDONESIA II / IPC
Pelindo I
16 Branches
Pelindo IV
22 Branches
D
11
8
B
9
6
12
C
10
7
IPC
12 Branches
5
3 2
A1
4
3
Pelindo III
20 Branches
IPC Branches
1.
2.
3.
4.
5.
6.
Port
Port
Port
Port
Port
Port
of
of
of
of
of
of
Tanjung Priok
Sunda Kelapa
Ciwandan, Banten
Cirebon
Panjang, Lampung
Palembang
IPC New Development Project
7.
8.
9.
10.
11.
12.
Port
Port
Port
Port
Port
Port
of
of
of
of
of
of
Pulau Baai, Bengkulu
Teluk Bayur, Padang
Pangkal Balam
Tanjung Pandan
Talang Duku, Jambi
Pont ianak
A.
B.
C.
D.
NEW PRIOK PORT
PORT DEVELOPM ENT IN TANJUNG
CARAT-SOUTH SUM ATRA
SORONG WEST PASIFIC HUB PORT
KIJING PORT DEVELOPM ENT – WEST
KALIM ANTAN
Background
– The growt h of t he cont ainer volum e in 2008- 2012 > 20%
– Cont ainer t hroughput realizat ion in 2013 is 6,2 Million TEU’s
– The exist ing capacit y const raint : 7,5- 8 m illion TEU’s
– The capabilit y of t he port t o handle ship size < 6000 TEUs
– The Governm ent of I ndonesia has assigned I ndonesia Por t Corporat ion I I t o
develop and operat e Kalibar u Ter m inal ( NewPriok Ter m inal) as an expansion
Port of Tanj ung Priok t hrough President ial Decr ee and awarded 70 years
concession
NewPriok Tim e line
PROJECT
CONSTRUCTION
STARTED
Jan 2013
Environmental Assessment Permit
December 2012
Concession Agreement
August 2012
Presidential Degree
April 2012
Project Initiation
June 2010
PORT OF TANJUNG PRIOK (EXISTING)
(source : Google Map)
Kalibaru ( Newpriok) Term inal
Kalibaru ( Newpriok) Term inal
Expansion Plan
Jet t y and CY 1A Progress
Piling Progress
Container Yard 1A 5,688 pcs of 9,185 pcs
Jett y 1A 1,534 pcs of 2,106 pcs
Total Product ivit y : 35 pcs/ day
Jet t y and CY 1A Progress
Access Road Progress
Piling Progress
Access Road 640 pcs of 917 pcs
Break
Wat er
Progress
Breakwater
Progress
Driving Clust er Bambu: 201,447.00 unit
Install of M att ress Bamboo: 145,631.73 m2
Placing Bat u 50 - 75 kg & 400 kg: 588,226.45 m3
Product & St ocking A-Jack: 21,879 unit
Break
Wat er
Progress
Breakwater
Progress
Dredging and Reclam at ion Act ivit ies
Dredging Volume: 3,682,713.20 m3
1 unit Grab Dregder
1 unit TSHD
Thank You
Ta n j u n g Pr iok Ex pa n sion :
Ka liba r u ( N e w Pr iok ) Pr oj e ct
12 nd ASEAN Port and Shipping 2014
Present ed by
D a n i Ru sli Ut a m a
President Direct or of PT Pengem bang Pelabuhan I ndonesia
( I ndonesia Port Developer)
A Subsidiary Com pany of I PC
PT Pelabuhan I ndonesia I I ( Persero)
Jakart a,
June 2014
PT PELABUHAN INDONESIA II / IPC
Pelindo I
16 Branches
Pelindo IV
22 Branches
D
11
8
B
9
6
12
C
10
7
IPC
12 Branches
5
3 2
A1
4
3
Pelindo III
20 Branches
IPC Branches
1.
2.
3.
4.
5.
6.
Port
Port
Port
Port
Port
Port
of
of
of
of
of
of
Tanjung Priok
Sunda Kelapa
Ciwandan, Banten
Cirebon
Panjang, Lampung
Palembang
IPC New Development Project
7.
8.
9.
10.
11.
12.
Port
Port
Port
Port
Port
Port
of
of
of
of
of
of
Pulau Baai, Bengkulu
Teluk Bayur, Padang
Pangkal Balam
Tanjung Pandan
Talang Duku, Jambi
Pont ianak
A.
B.
C.
D.
NEW PRIOK PORT
PORT DEVELOPM ENT IN TANJUNG
CARAT-SOUTH SUM ATRA
SORONG WEST PASIFIC HUB PORT
KIJING PORT DEVELOPM ENT – WEST
KALIM ANTAN
Background
– The growt h of t he cont ainer volum e in 2008- 2012 > 20%
– Cont ainer t hroughput realizat ion in 2013 is 6,2 Million TEU’s
– The exist ing capacit y const raint : 7,5- 8 m illion TEU’s
– The capabilit y of t he port t o handle ship size < 6000 TEUs
– The Governm ent of I ndonesia has assigned I ndonesia Por t Corporat ion I I t o
develop and operat e Kalibar u Ter m inal ( NewPriok Ter m inal) as an expansion
Port of Tanj ung Priok t hrough President ial Decr ee and awarded 70 years
concession
NewPriok Tim e line
PROJECT
CONSTRUCTION
STARTED
Jan 2013
Environmental Assessment Permit
December 2012
Concession Agreement
August 2012
Presidential Degree
April 2012
Project Initiation
June 2010
PORT OF TANJUNG PRIOK (EXISTING)
(source : Google Map)
Kalibaru ( Newpriok) Term inal
Kalibaru ( Newpriok) Term inal
Expansion Plan
Jet t y and CY 1A Progress
Piling Progress
Container Yard 1A 5,688 pcs of 9,185 pcs
Jett y 1A 1,534 pcs of 2,106 pcs
Total Product ivit y : 35 pcs/ day
Jet t y and CY 1A Progress
Access Road Progress
Piling Progress
Access Road 640 pcs of 917 pcs
Break
Wat er
Progress
Breakwater
Progress
Driving Clust er Bambu: 201,447.00 unit
Install of M att ress Bamboo: 145,631.73 m2
Placing Bat u 50 - 75 kg & 400 kg: 588,226.45 m3
Product & St ocking A-Jack: 21,879 unit
Break
Wat er
Progress
Breakwater
Progress
Dredging and Reclam at ion Act ivit ies
Dredging Volume: 3,682,713.20 m3
1 unit Grab Dregder
1 unit TSHD
Thank You