Tanjung Priok Expansion, Kalibaru (NewPriok) Project

Energizing Trade, Energizing Indonesia

Ta n j u n g Pr iok Ex pa n sion :
Ka liba r u ( N e w Pr iok ) Pr oj e ct
12 nd ASEAN Port and Shipping 2014
Present ed by
D a n i Ru sli Ut a m a
President Direct or of PT Pengem bang Pelabuhan I ndonesia
( I ndonesia Port Developer)
A Subsidiary Com pany of I PC
PT Pelabuhan I ndonesia I I ( Persero)
Jakart a,

June 2014

PT PELABUHAN INDONESIA II / IPC

Pelindo I
16 Branches

Pelindo IV

22 Branches

D
11

8

B

9

6

12

C

10

7


IPC
12 Branches

5
3 2

A1
4

3

Pelindo III
20 Branches

IPC Branches
1.
2.
3.
4.

5.
6.

Port
Port
Port
Port
Port
Port

of
of
of
of
of
of

Tanjung Priok
Sunda Kelapa
Ciwandan, Banten

Cirebon
Panjang, Lampung
Palembang

IPC New Development Project
7.
8.
9.
10.
11.
12.

Port
Port
Port
Port
Port
Port

of

of
of
of
of
of

Pulau Baai, Bengkulu
Teluk Bayur, Padang
Pangkal Balam
Tanjung Pandan
Talang Duku, Jambi
Pont ianak

A.
B.

C.
D.

NEW PRIOK PORT

PORT DEVELOPM ENT IN TANJUNG
CARAT-SOUTH SUM ATRA
SORONG WEST PASIFIC HUB PORT
KIJING PORT DEVELOPM ENT – WEST
KALIM ANTAN

Background
– The growt h of t he cont ainer volum e in 2008- 2012 > 20%
– Cont ainer t hroughput realizat ion in 2013 is 6,2 Million TEU’s
– The exist ing capacit y const raint : 7,5- 8 m illion TEU’s
– The capabilit y of t he port t o handle ship size < 6000 TEUs
– The Governm ent of I ndonesia has assigned I ndonesia Por t Corporat ion I I t o
develop and operat e Kalibar u Ter m inal ( NewPriok Ter m inal) as an expansion
Port of Tanj ung Priok t hrough President ial Decr ee and awarded 70 years
concession

NewPriok Tim e line

PROJECT
CONSTRUCTION

STARTED
Jan 2013
Environmental Assessment Permit
December 2012
Concession Agreement
August 2012
Presidential Degree
April 2012

Project Initiation
June 2010

PORT OF TANJUNG PRIOK (EXISTING)

(source : Google Map)

Kalibaru ( Newpriok) Term inal

Kalibaru ( Newpriok) Term inal


Expansion Plan

Jet t y and CY 1A Progress

Piling Progress
Container Yard 1A 5,688 pcs of 9,185 pcs
Jett y 1A 1,534 pcs of 2,106 pcs
Total Product ivit y : 35 pcs/ day

Jet t y and CY 1A Progress

Access Road Progress

Piling Progress
Access Road 640 pcs of 917 pcs

Break
Wat er
Progress
Breakwater

Progress

Driving Clust er Bambu: 201,447.00 unit
Install of M att ress Bamboo: 145,631.73 m2
Placing Bat u 50 - 75 kg & 400 kg: 588,226.45 m3
Product & St ocking A-Jack: 21,879 unit

Break
Wat er
Progress
Breakwater
Progress

Dredging and Reclam at ion Act ivit ies

Dredging Volume: 3,682,713.20 m3
1 unit Grab Dregder
1 unit TSHD

Thank You