  Implementation of a information systems computer-based can be viewed as an attempt introduction of new technology. Therefore, before information system computer-based is implemented there should be planning for the new system can be received well by users [2]. Process activity carried out by an organization will not run properly, effectively and efficiently if not supported by reliable information.

  1. Increase understanding and transparency of costs, risks, and benefits resulting from

  Several benefits can be obtained from the implementation of the Val IT are as follows [20]:

  IT Governance Institute (ITGI), the agency that issued a framework for IT governance, about a month April 2006 issued a complementary framework that can be used to measure IT value, called Val IT. Today, ITGI has released Val IT Framework 2.0 in the year 2008 and an improvement of the previous version [7].

  2.1 Theory

  IMPLEMENTATION

  2 THEORY, MODEL, ANALYSIS, DESIGN, AND

  In an effort to achieve the desired productivity according to the organization's business objectives with information technology support, we need a measurement that can show the value obtained. In this research presents the method of measuring the readiness of the application of information technology has an impact on the IT objectives and business goals of an organization will use the Val IT framework.

  Higher Education as an institution that requires the support of information technology in improving quality of education both in terms of the education provider and its customers such as students not optimally applied. It all can be seen from the results of research conducted by the EDUCAUSE Center for Applied Research (ECAR) in december 2002, found that of 480 respondents colleges that implement ERP as an IT support as much as 54% of respondents found universities decreased productivity [10]. This shows that, when applied in information technology, the company is experiencing changes in completing the work environment of each job, so that necessary adjustments both in the user should or organization itself. Because each organization's existing change in expectations is that there is a value that can be obtained tangible and intengible.

  SLCM

  

MATURITY MEASUREMENT OF ERP IMPLEMENTATION IN

STUDENT LIFE CYCLE MANAGEMENT BASED VAL IT

FRAMEWORK

  Keywords: Val IT, Framework, Maturity, ERP,

  In the application of information technology (IT) in an enterprise often need more time to adapt, because the new information technology is a new environment for the user or the organization in completing the work [10]. University as an institution that provides services to its customers in this case the students need the support of information technology that can enhance productivity and apply their IT course will provide value, and so far the lack of measurement of IT implementation to achieve the desired value by the company using Val IT Framework. Based on the results of research conducted by the ITGI in Building the Business Case for COBIT and Val IT: Executive Briefing [3], explains that there are multiple domains of the Val IT processes [6] which has a high impact on IT goals and have high impact with business goals of an enterprise. Next will be used to measure the application of ERP[11] in SLCM. From this research will show how to measure the ERP implementation of information technology in the SLCM using Val IT has a high impact on the IT goals and having a high impact with a company's business goals.

  2 ABSTRACT

  [email protected]

  1 ,

  Gedung Teknik Informatika, Kampus ITS, Surabaya, Indonesia Email: [email protected]

  1

  , Riyanarto Sarno

  1

  Abdul Rozaq

1 INTRODUCTION

  th

  VIII-48 The 6 International Conference on Information & Communication Technology and Systems decisions based management by adequate have different modules such as assets management, information. control, financial accounting, manufacturing,

  2. human resources, planning and development and so

  Improving the ability of selecting investments that have the greatest potential return benefits. forth [18], and has many benefits provided into the

  3. system [14][18]. improving the likelihood of success in implementing the selected investment so that investment can yield benefits as expected.

  4. Reduce costs by just doing what should be done and immediately take corrective action or stop investments that do not produce the expected potential benefits.

5. Reduce the risk of failure, especially high risk of failure.

  6. Reduce the “shock” associated with cost and delivery of IT, thus increasing business value, reduce unnecessary costs and increase

  Figure 2. ERP Implementation Step[1] confidence in the overall IT.

  Figure 2. describes the stages that must be made in Val IT can be applied to IT investments that the implementation of ERP in an organization, so support the business, the sustainability of business what the objectives of the ERP implementation can investments, growth or business transformation be achieved. with IT support to critical components where IT provides full support end-to-end to the whole process of value creation in the enterprise [20].

  2.2 Model

  This research will measure the implementation In this section we will discuss a conceptual of ERP using Val IT Framework which consists of framework to clarify the issues raised in this study, domain three processes, i.e.: Value Governance, as for the conceptual framework can be seen in

  Portfolio Management, Investment Management Figure 3.

  Figure 1. The linkage between the three Val IT Processes [7] Figure 3. Conceptual Framework

  Val IT process objectives [20]: 1.

  VG objective is to optimize the value obtained Based on the conceptual framework in figure 3. for the IT investment

  Hypotheses can be formulated as follows: 2. PM objective is to ensure that all IT

  H0. ERP implementation does not give value IT? investment portfolio in line and make an H1. ERP Implementation give value IT? optimal contribution to the organization's

  2.3

  strategic objectives

   Design 3.

  IM objective is to ensure that IT investment To answer the hypotheses, this research will be program in the organization can provide conducted in several stages i.e.: data collection, optimal results with reasonable cost and within calculation of the level of maturity. the limits of acceptable risk

  Enterprise Resource Planning (ERP)

  2.4 Data Collection

  Enterprise Resource Planning (ERP) is a At this stage of data collection will be carried out software system that integrates and automates several steps in accordance with a predefined data processes in large companies [14]. ERP packages points. The technique applied in data collection, i.e.:

  ISSN 2085-1944 Maturity Measurement of ERP Implementation in Student Life Cycle Management based Val IT

  VIII-49 Framework-Abdul Rozaq 1. determined based on achievement of specified

  Documentation Review 2. criteria in the Val IT Maturity Model. The formula

  Interview 3. that can be used to calculate the maturity level are:

  Observation

  n 4.

  Questionnaires After the data collected through the four stages MLvco

  nn

  above, the data obtained will be used as reference

  1 

  MLv  for the assessment to be undertaken. n

  Where :

2.5 MLv = Maturity Level Domain Process v Maturity Level Assessment

  v = 1,2, …

  At this phase will be measured levels of maturity MLvco Maturity Level control objectives

  n = (maturity level) using Val IT Maturity Model.

  Domain Process v

  Table 1. Maturity Level Criteria[6][7]

  2.5.1 Existence Level Domain Val IT Processes

  In the year 2008 ITGI conducted a study that aims to determine the relationship between organizational performance and corporate governance with IT support based on COBIT 4.1, Val IT 2.0 [3] and the results can be seen in figures 5 and 6.

  Assessment of maturity levels used in this study can be seen in figure 4.

  Figure 4. The assessment process maturity levels Figure 5. High Impact IT Goals and High Impact Business Goal[2]

  For score calculation process level maturity can be In the figure 5. Is a relationship that has a seen in table 2. strong impact among the business goals with IT

  Table 2. Maturity Level Scoring

  goals, where there are business objectives that are included in the top ten business goal, i.e. B_Int1 "Improve and maintain business process functionality" that relate to IT goals are included in the Top Ten IT goals, i.e.

  IT_Corp5 “Improve IT’s

  cost-efficiency

  ”, IT_Corp6 “Align the IT Strategy to

  The Business Strategy

  ”, IT_User3 “Translate

  business functional and control requirements into effective and efficient automated solution

  ”[3] In the calculation for determining the level maturity [4][6][17]. level using a range of values 0 (non existent) to 5

  From the research that has been done on the (optimized) [6][7]. For the assessment level is

  IT and business managers from 538 companies VIII-50 The 6

  th

  IT processes VG2, VG5, VG6, PM1, IM7 [3] [4] [6] [17].

  IT

  3.1 Maturity Level Measurement Val

  3 RESULT

  Furthermore, we will see the level of the existence of the Val IT domain. COBIT process are chosen based on relationships with the IT business goal BG_10/ IT goal ITG_6 and having a High Impact COBIT Processes, namely AI_1, AI_2, and AI_16 [6][17]. Because AI_16 not included in the High Impact COBIT Processes will not be done his calculations ML [3], COBIT process only(AI_1, AI_2) which will be calculated Maturity Level (ML), which aims to find out, whether with the support of good IT processes (ML high) will support Val IT is good.

  Figure 8. Explaining the relationship between the High Impact Val IT Processes (VG2, VG5, VG6, PM1, IM7) against IT_User3/ITG_6 and their relationship with B_Int1/BG_10 "Improve and maintain business process functionality" which is the Top Ten Business Goal [3][4][5][17].

  Figure 8. KGI and KPI scema[1] [3][5][15]

  IT_User3 (ITG6) "Defining how business functional and control requirements are translated into automated solutions that effectively and efficiently" in alignment with business purpose 10/B_Int1 number (BG_10) "improvement and maintenance of the functionality of business processes" [3][ 6][17].

  Based on the mapping, obtained by objective

  Indicators (KPI)), an indicator for measuring how well the performance of IT processes to enable the achievement of goals [17].

  The results are shown in Figure 5 and 6 will be the basis of key indicators in determining the destination (Key Goal Indicators (KGI)) is a target or targets to be achieved by a process or activity within the organization. [15] and determination of key performance indicators (Key Performance

  IT_Corp6 "Align the IT Strategy to the Business Strategy" and IT_User1 "Provider service offering and service levels in line with business requirements" is the second IT Goals included in the top 10 IT Goals [3], a related domain of the Val

  International Conference on Information & Communication Technology and Systems

  IT_User1, IT_Fut1, and IT_Fut3, where IT Goal

  Figure 6. shows that the IT Goal IT_Corp6,

  Figure 6. High Impact IT Processes and High Impact IT Goals[3]

  5. RET represents companies from the retail, distribution and transportation industries.

  4. MFT includes companies from the manufacturing and pharmaceutical industry.

  3. ITM represents companies from IT professional services, telecommunications and media.

  2. GIH includes government institutions, utilities (e.g., energy, oil and gas) and the healthcare sector.

  FIN represents banks, financial and insurance companies.

  Industry segment that represents the sector [3] : 1.

  ISACA members who have been surveyed for the application of 56 IT governance processes related to COBIT and Val IT and firm performance of 18 goals and 20 objectives of IT business. Group of respondents came from different regions around the world, with the majority of North America (40 percent), Asia (26 percent) and Europe (19 percent).

  ISSN 2085-1944

  Results of measurement maturity level that has been conducted to determine the value gained in the Maturity Measurement of ERP Implementation in Student Life Cycle Management based Val IT

  VIII-51 Framework-Abdul Rozaq implementation of ERP in universities can be seen

  Non- Initial/ Repeatable Defined Managed and Optimised

  in table 3:

  existent ad hoc but intuitive Process Measurable

  1

  2

  3

  4

  5 Table 3. Recapitulation of the average maturity level Val IT Process 2,96 3.01 3,02 figure 11. Maturity Scale [4]

  Where : Enterprise Current Status Industry Average Enterprise Target

  From the results shown in table 3, can be displayed ML Value Governance in graphical form for each level of maturity value of each domain name on the Val IT processes figure 6 ML Portfolio Management and figure 7.

  ML Investment Management Description Ranking used:

  • – Management processes are not applied at all 1 – Processes are ad hoc and disorganized

  2

  • – Processes follow regular pattern 3 – Processes are documented and communicated

  4

  • – Processes are monitored and measured 5 – Good practices are followed and automated Figure 11 shows that the implementation of ERP in

  Figure 9. Score for maturity level Val IT Processes

  the SLCM to Value Governance and Portfolio Management at the level of "Define Proses" that is processes has been documented and communicated at the level of institution, for Investment Management processes are still at the level of Repeatable but intuitive, which means in this process still need to do a little maintenance, thereby increasing the value gained in the implementation of ERP in the SLCM. However, overall the process domain third if the average is taken at the level of "Define Process".

1. ML Value Governance

  ML Portfolio Management 3.

  3.2 Existence Level Domain Val IT 2.

  Processes

  IM Investment Management From the results of measuring the degree of domain

  Figure 10. Maturity Level Val IT Processes existence Val IT processes shown in the figure 8.

  [1], the result as shown in Figure 12 To know more clearly the results of the calculation process maturity level and Val IT can be described by using Maturity Scale, as shown in Figure 11. VIII-52 The 6

  th

  3.3 Measurement Results COBIT Processes Maturity Level

  IT and COBIT are grouped by level of process, namely 1. Val IT Low Level, 2. Val IT High Level,

  In table 6 indicated an average score of the ML Val

  Table 6. Average of ML Val IT and CoBit processes

  After scoring ML Val IT and COBIT is established, then the next step is to conduct statistical tests using One Way Anova which hypothesis i.e.: H0 : the mean of each group is the same method H1: are the mean of two or more groups are not the same method

  3.4.1 One Way Anova Test

  3.4 Statistical Test Results Calculation Process Maturity Level COBIT and Val IT

  In Table 5 shows that the domain ML COBIT process AI_1: 3.02 and AI_2: 2.99. So if the average is taken from both domains COBIT processes (AI_1, AI_2) is 3.00, which indicates that the application of ERP in SLCM with IT support at the level of Define Process, which means that the processes are documented and communicated to the institution level widely.

  0.00 0.20 0.40 0.60 0.80 1.00 1.20 1 2 3 4 5 6 AI-1 AI_2 Figure 13. scores of each maturity level COBIT processes

  The measurement results COBIT process maturity level and maturity level to know the domain name and AI_2 AI_1 process can be seen in table 3.

  IM7 72% On the implementation of ERP in the SLCM was to update the portfolio affected by the programs, projects, services, assets, and IT resources

  International Conference on Information & Communication Technology and Systems

  VG6 65% On the implementation of ERP in SLCM've done as a form of self- evaluation and improvement of the sustainability of increases in the value management practice. PM1 76% On the implementation of ERP in the SLCM to the executive level has memahi about strategic IT issues and his understanding of the potential impact of IT on institutional strategies.

  VG5 71% On the implementation of ERP in SLCM has done an effective governance monitoring well, with monitoring reports indicated the existence of the work

  VG2 75% On the implementation of ERP in SLCM already defining and implementing good processes, such as forming the governance framework for an appropriate and consistent with the institutional environment, and provide support accountability (responsibility or obligation to give answer and explain the performance and actions of a person / body corporate / leadership organizations include the successful mission and failure to inform the authorities hold accountable) institutions.

  Percentage of Existence "Good" Discription

  Table 4. Existence of Val IT Processes Val IT Processes

  IT Framework on implementation of ERP in SLCM highest average at both levels, namely 72%., which means the implementation of ERP in SLCM can be seen in the table 4:

  In the figure 13. explain that to the level of domain existence process VG2, VG5, VG6, PM1, IM7 Val

  Figure 12. Implementation of the existence of the Val IT processes

  ISSN 2085-1944

  3. COBIT Low Level, 4. COBIT High Level. Maturity Measurement of ERP Implementation in Student Life Cycle Management based Val IT

  VIII-53 Framework-Abdul Rozaq

  Table 7. Result Homogenety of Variances Test

  Homogeneity test results-of-Variance boxes on the table 7 indicates sig. (P-value) of 0.105, indicating that H0 is accepted, it can be proved that the mean of two or more groups of the same ML.

  Table 8. Result One Way Anova Test figure 14. Graphs of Variant Analysis

  3.5 Recommendations for Val IT Processes

  Based on calculations Val IT process maturity level, there are several proposals that could One way ANOVA test results that have been be given to each process, i.e.: conducted indicate that the value-F test is not

  3.5.1

  significant in test group, was indicated by the value

   Recommendations for Value

  F value of 2.151 which is smaller than F (3.9),

  Governance Processes

  reinforced with p = 0195 larger than the critical

  a. Governance

  2. Defining and Value val ue α = 0.05. This means p-value shows implementing processes significant similarities.

  For proposals that are designated to process VG2, i.e.:

  Table 9. Result Post Hoct Test 1.

  The budget is used for IT investments should be prioritized and continue to be considered for institutional advancement.

  2. Defines the processes to clarify the relationship between institutional goals with IT goals, and can be implemented in a consistent and sustainable.

  b.

  Value Governance 5. Establish effective governance monitoring.

  1. The regulatory process requires a technique which can provide Tukey post hoc test for multiple comparisons information in brief, clear, looking at indicate that the average difference between the ML the overall portfolio, program and IT is not statistically significant and the mean performance and support decision significantly. making, perealisasi decisions and

  From One Way ANOVA test results can be monitoring results expected from what concluded that the calculation of ML for Val IT and is being achieved COBIT has similar values and can be interpreted c. that when applied with good IT processes, it will Value Governance 6. Continuously improve value management practices. generate a value or Val IT is good too. This can be 1. seen in Figure 14.

  Lessons from value management should be reviewed regularly and necessary changes must be planned, implemented and monitored to increase the value system, portfolio management and investment management processes and practices so that they can continue to improve th

  VIII-54 The 6 International Conference on Information & Communication Technology and Systems value management practices and

  REFERENCES maximize the value of.

  [1] Edwin T. Cornelius III (2006) Seven Steps in

3.5.2 Recommendation for Portfolio

  the ERP Process, An Overview of the Higher

  Management processes Ed ERP Journey, Collegiate Project Services.

  a.

  Portfolio Management 1 Establish strategic [2] Frenzell, Caroll W (1996) Management of direction and target investment mix.

  Information Technology, Boy & Fraser 1. Alignment between the strategic role Publishing Company, USA. of institutions with Information

  [3]

  IT Governance Institute (2009) Building the Technology at the institution

  Business Case for CobiT and Val IT: 2. the direction of

  Determining Executive Briefing, IT Governance Institute. investment business in determining

  [4]

  IT Governance Institute (2008) the alignment of Information Understanding How Business Goals Drive

  Technology and business strategy

  IT Goals, Executive Briefing, IT Governance goals and objectives. Institute.

3. Thorough understanding of alignment

  [5] (2007) A

  IT Governance Institute between business functions with IT

  Cosmological Approach to IT Governance:

  functions, the impact of IT and

  Val IT and COBIT Lessons Learned at the

  communicating the broad assurance in

  United Nations, IT Governance Institute.

  institutions.

  [6]

  IT Governance Institute (2007) COBIT 4.1

  3.5.3 Recommendation for Investment Framework Control Objectives, Management

  Management processes Guidelines, Maturity Models, IT Governance a. Investment Management 7 Update operational Institute.

  IT portfolio [7]

  IT Governance Institute (2008) Enterprise 1. Update the contents of all IT

  Value: Governance of IT Investments, The portfolios affected by the investment Val IT Framework 2.0, IT Governance program. These can include, but are Institute. not limited to, the portfolio of IT

  [8]

  IT Governance Institute (2008) Enterprise projects, IT services, IT applications, Value: Governance of IT Investments, IT assets and other IT resources. Getting Started With Value Management, IT Governance Institute.

4 CONCLUSION AND DISCUSSION

  [9]

  IT Governance Institute (2007) IT Based on that research, which measured the Governance Implementation Guide 2nd. implementation of ERP in SLCM using Val IT [10]

  Jogiyanto Hartono (1999) Analisis dan Framework can be concluded that: design: Sistem Informasi Pendekatan 1.

  Terstruktur Teori dan Praktek Aplikasi In this research only measured values that are intangible, because it related to Bisnis, Andi Yogyakarta. financial data were not obtained. [11]

  Kimberling E, 7 Critical Success Factors to 2.

  Make Your ERP or IT Project Successful, The measurement results can illustrate the value gained from the implementation of ERP and Business Consultant, Panorama

  ERP, with the support of good IT Consulting Group. Available at: processes produce Val IT is good to be on http://it.toolbox.com/blogs/erp-roi/7-critical- the level of maturity levels define the success-factors-to-make-your-erp-or-it- meaning Val IT has been well documented project-successful-12058 and has been communicated to the [12]

  Monk, Ellen and Wagner, Brett (2009) institutional environment. Concepts in Enterprise Resource Planning.

  3.

  3rd.ed. Course Technology Cengage Implementation of ERP as a form of support tenologi provide information on Learning. Boston, Massachusetts. college grades, which can increase the [13]

  Richard West, Stephen L. Daigle (2004) productivity of teaching and learning Total Cost of Ownership: A Strategic Tool process both in terms of students and for ERP Planning and Implementation, teaching staff and further in general terms California State University, January 6, 2004. of organization. [14]

  Rico, David F., ERP in Higher Education For the future work of the research is the Master Thesis. measurement of SLCM Implementation of ERP in [15]

  SAP® Student Life Cycle Management The the case of heterogeneous (tangible and intangible).

  Solution for Today’s universities SAP

  ISSN 2085-1944 Maturity Measurement of ERP Implementation in Student Life Cycle Management based Val IT Framework-Abdul Rozaq

  VIII-55 Solution in Detail - SAP Student Lifecycle Management. Available at: www.sap.com/industries/highered/featuresfunctio ns/studentlifecyclemanagement.epx

  Planning (ERP) Systems Projects, Master’s Thesis in Advanced Financial Information Systems.

  Kerja Evaluasi Investasi Teknologi Informasi [24]

  [23] Wina Witanti and Falahan (2007) Kerangka

  Nurhadi Suharsono (2008) Penggunaan Val It Framework Untuk Menilai Perencanaan Investasi Teknologi Informasi

  [22] Teguh

  Comparation of CobiT Maturity Model and Structural Equation Model for Alignment Measurement of University Academic Regulations and Information Technology Goals, International Journal of Computer Science and Network Security 10(6).

  [21] Tanuwijaya, H. and Sarno, R. (2010) The

  [20] Tadinen, Helena (2005) Human resources management aspects of Enterprise Resource

  [16] Sarno, Riyanarto (2009) Sistem Strategi

  Service Portfolio for an Enterprise Resource Planning, International Journal of Computer Science and Network Security 10(3): 144- 156.

  [19] Sarno, R. and Herdiyanti, A. (2010) A

  Information Technology Policies for Enterprise Resource Planning Practices to Improve Customer Orientation and Service, International Journal of Computer Science and Network Security 10(5): 82-94.

  [18] Sarno, R. and Herdiyanti, A. (2010)

  [17] Sarno, Riyanarto (2009) Audit Sistem & Teknologi Informasi, ITS Press.

  Sukses Bisnis dengan Teknologi Informasi Berbasis Balanced Scorecard dan COBIT, ITS Press.

  Wasilah (2007) Perancangan IT Governance Untuk Peningkatan Kualitas Layanan Akademik VIII-56 The 6

  th

  International Conference on Information & Communication Technology and Systems

  ISSN 2085-1944 [This page is intentionally left blank]