Studi Penerapan Total Productive Maintenance (TPM) Pada Mesin Pengaduk Ko-Kneader di Anode Green Plant PT. Indonesia Asahan Aluminium (Persero)

DAFTAR PUSTAKA
Jr. Patton DJoseph. 1996.Preventive Maintenance. Instrument of America,
Prentice-Hall, Inc. Englewood Cliffs, N.J 07632.
SUHARTO. IR, Sistem Perawatan Terpadu, jakarta : RINEKA CIPTA
Keith, R. M. 1957.Maintenance Engineering Handbook-Seventh Edition. United
State of Amerika : The McGraw-Hill Companies, Inc.
Ljungberg, O. 1998.Measurement of overall equipment effectiveness as a basis for
TPM activities. International Journal of Operations & Production
Management.
Nakajima, S. 1988.Introduction to Total Productive Maintenance. Cambridge:
MA,Productive Press, Inc.
Springer. 2003.Handbook of reliability engineering. New Jersey USA : Sunrise
Setting Ltd, Torquay, Devon, UK

S.,Nehete, E., Narhede, and K., Mahajan.Total Productive Maintenance: A
Critical Review.
Dunant,

Evin.

2016.STUDI


PENERAPAN

MAINTENANCEMENGGUNAKAN

TOTAL
METODE

PRODUCTIVE
OVERALL

EQUIPMENT EFFECTIVENESS (OEE) DAN SIX BIG LOSSES PADA
GENERATOR DIESEL TYPE 700 DI PT. PP LONDON SUMATERA
INDONESIA Tbk BAGERPANG POM(Skripsi Sarjana). Medan :
Fakultas Teknik Sumatera Utara.
http://www.plant-maintenance.com/articles/RCMvTPM.shtml
www.oee.com/world-class-oee.html, diakses pada 09 Mei 2016Pabrik Peleburan
Aluminium”,

diakses


dari

http://www.inalum.co.id/article/pabrik-peleburan-

aluminium.html, pada tanggal 3 Juni 2016 pukul 21.20 WIB.
http://www.leanproduction.com/tpm.html, diakses pada 01 Juli 2016, 05.23 WIB
http://www.leanproduction.com/oee.html, diakses pada 01 Juli 2016, 05.25 WIB
http://www.oee.com/oee-six-big-losses.html, diakses pada 01 Juli 2016, 05.28
WIB

xiv

Universitas Sumatera Utara