017 Lampiran BA Aanwijzing Pengadaan Pembangunan Data Center

Lampiran BA Aanwijzing No. 017/LL/SAR/AA/KCI/I/2018, Tanggal 04 Januari 2018
RENCANA ANGGARAN BIAYA
PEMBANGUNAN DATA CENTER KCI STASIUN JUANDA
No.
I
A
1
2

3
4
5
6
7
8
9

10

B
1


2
3
4
5
C

Description
CIVIL & INTERIOR
PREPARATION
Including :
Proteksi area kerja
Kebersihan
- Selama proses pekerjaan
- Setelah pekerjaan selesai
Mobilisasi dan Transportasi
Listrik dan air kerja
Keamanan
Peralatan Perlindungan Diri Pekerja dan Officer HSE
Peralatan Kesehatan Kerja

Peralatan dan Perlengkapan Kerja
Alat dan biaya Komunikasi
- Handy Talkie
- Telepon
- Koneksi Internet
Dokumentasi
- Shop Drawing
- Laporan Mingguan
- Laporan Bulanan
- As-Built Drawing
- SOP Pengoperasian Perangkat
RAISED FLOOR
Including :
Raised Floor Panel
Type : Solid Panel
Size : 600 x 600 x 35mm
Sub Structur Steel Pedestal Galvanized 60 cm
Perforated Raised Floor Panel
Double Cup Lifter / Veribor
PE Insulation

Installation

PARTITION
Including :
1 Gypsum Partition Fire Rated 1 hr
Fire Rates Gypsum 13mm, 2 layers
Metal Stud Frame 7,6mm
Insulation Glasswool, thickness 2 inch
2 Painting (Wall + Gypsum Partition)

Price (Rp.)

Qty.

1

lot
1
1


lot
lot

1
1
1
1
1
1
1

lot
lot
lot
lot
lot
lot
lot

1


lot

1

Unit

Total

.........................

.....................
.....................

lot
30

10
1
38

1

......................

m2

...............

...................

pcs
pcs
m2
lot

....................
..................
...................
...................


...................
..................
....................
...................

1

lot

....................

170

m2

.................

...................

70


m2

.......................

..................

No.

Description

D

DOORS
Including :
1 Double Steel Door
Dimension : (90x220)cm + (90x220)cm
Steel Frame
Accessories


E
1
2
3
4

II
A

CEILING
Including :
Metal Ceiling
Perforated Metal Ceiling
Support Material
Installation

ELECTRICAL SYSTEM
ELECTRICAL SYSTEMS
Including :
1 NYY 4x50mm2 + NYA 1x25mm2 - Panel PLN to MSB

2 NYY 4x50mm2 + NYA 1x25mm2 - Panel GENSET to MSB
3
5
7

8
10

B
1
2
3
4

C
1
2
3
4
5

6
7

Price (Rp.)

Qty.
1

Unit
lot

1

1

pcs

.....................
......................

lot
30
10
1
1

1

m2
pcs
lot
lot

Total

...................

.......................
.................
.................
.................
.................

.................
.................
.................
.................

...................
..................

lot
50
30

m
m

.................
.................

.................
.................

8
NYY 4x16mm2 + NYA 1x16mm2 - Panel MSB to INPUT UPS.1
NYY 4x16mm2 + NYA 1x16mm2 - Panel MSB to OUTPUT
8
UPS.1
NYY 4x16mm2 + NYA 1x16mm2 - Panel MSB to P-UPS
8
(Maintenance Bypass)
15
NYY 4x16mm2 + NYA 1x10mm2 - Panel MSB to PAC.1
Jasa Instalasi
1
a. Penarikan kabel
b. Marking Tape
c. Terminasi & testing termasuk material skun, vinil, dan lainnya

m

.................

.................

m

.................

.................

m

.................

.................

m
lot

.................
.................

.................
.................

DISTRIBUTION CABLES
1
Including :
NYM Cable 3x2.5mm for ligthing on Hi impact Conduit
150
NYM Cable 3x2.5mm for SSO on Hi impact Conduit
150
NYY Cable 3x6mm Cee-form 32A/1P
200
Jasa Instalasi
1
a. Penarikan kabel
b. Marking Tape
c. Terminasi & testing termasuk material skun, vinil, dan lainnya

lot

Power Outlet and Lighting
Including :
Fluorescent Lamp 3 x 18 Watt
Emergency Light
Exit Light (incl. Battery)
Switch Double Outlet Box
Single Socket Outlet 220V/5A
Cee-form 32A, 1 P
Accessories

unit

1
8
2
1
1
6
20
1

m
m
m
lot

set
unit
unit
unit
pcs
pcs
lot

.................
...............
...............
...............
...............

...............
...............
...............
...............

.................
...............
...............
...............
...............
...............
...............
...............

...............
...............
...............
...............
...............
...............
...............

No.

Description

Price (Rp.)

Qty.

8 Jasa Instalasi
a. Penarikan kabel
b. Marking Tape
c. Terminasi & testing termasuk material skun, vinil, dan lainnya

1

lot

D

PANEL MSB-DC
Including :

1

unit

E

P-UPS

1

unit

F

SISTEM GROUNDING
Including :
Copper Bar 3mm x 30 mm
Terminal grounding bar
NYA 1 x 6mm
NYA 1 x 35mm (in galvanize pipe)
Grounding Point (