perpustakaan.uns.ac.id digilib.uns.ac.id
Tugas Akhir
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung RSUD
108
Beban bracing = 10
x beban kuda-kuda = 10
x 184,4 = 18,44 kg Beban reaksi
= 2×reaksi jurai+reaksi setengah kuda-kuda = 2x 346.94 + 312.40
= 1006,28 kg
Tabel 3.23. Rekapitulasi pembebanan kuda-kuda utama
Beban Beban
Atap kg
Beban gording
kg Beban
Kuda - kuda
kg Beban
Bracing kg
Beban Plat Penyambung
kg Beban
Plafon kg
Beban Reaksi
kg Jumlah
Beban kg
Input SAP
kg
P
1
= P
13
350 44
34,52 3,452
10,35 119,52
- 561,84
562 P
2
= P
12
300 44
64,78 6,478
19,4 -
- 434,65
435 P
3
= P
11
300 44
80,52 8,052
24,15 -
- 456,42
457 P
4
= P
10
294 44
95,89 9,589
28,76 -
- 472,23
473 P
5
= P
9
250 36.74
118,95 11,89
35,6 -
- 453,09
454 P
6
= P
8
200 29.37
130,90 13,09
39,27 -
- 412,63
413 P
7
162 22
91,5 9,15
27,45 -
2111,99
2424,09 2425
P
14
= P
24
- -
41,60 4,160
7,5 95.76
- 149,02
150 P
15
= P
23
- -
60,6 6,06
18,2 62.082
- 146,94
147 P
16
= P
22
- -
85,53 8,553
25,6 93.42
- 213,10
214 P
17
= P
21
- -
100,8 10,08
30,26 79.74
- 220,26
221 P
18
= P
20
- -
118,34 11,83
35,5 63.72
- 229,39
230 P
19
- -
184,4 18,44
55,33 51.48
1006,28
1315,93 1316
2. Beban Hidup
Beban hidup bekerja pada P
1
,P
2
, P
3
, P
4
, P
5,
P
7
, P
8
, P
9
, P
10,
P
11
P
12,
P
13
=100 kg
perpustakaan.uns.ac.id digilib.uns.ac.id
Tugas Akhir
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung RSUD
109
1 13
16 15
14 25
22 21
20 19
18
23 17
24 26
27 28 29
43 44
45 38
39 40 41 42
31 32 33
34 35
36 37 30
2 3
4 5
6 7
8 9
10 11
12
3. Beban Angin
Perhitungan beban angin :
Gambar 3.27. Pembebanan kuda-kuda utama akibat beban angin
Beban angin kondisi normal, minimum = 25 kgm
2
a Koefisien angin tekan = 0,02
0,40 = 0,02 x 30 – 0,40 = 0,2
1 W
1
= luasan x koef. angin tekan x beban angin
= 7 x 0,2 x 25
= 35 kg 2 W
2
= luasan x koef. angin tekan x beban angin
= 6 x 0,2 x 25
= 30 kg 3 W
3
= luasan x koef. angin tekan x beban angin = 6 x 0,2 x 25
= 30 kg 4 W
4
= luasan x koef. angin tekan x beban angin = 5,88 x 0,2 x 25
= 29,4kg 5 W
5
= luasan x koef. angin tekan x beban angin = 5 x 0,2 x 25 = 25 kg
perpustakaan.uns.ac.id digilib.uns.ac.id
Tugas Akhir
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung RSUD
110
6 W
6
= luasan x koef. angin tekan x beban angin = 4 x 0,2 x 25
= 20 kg 7 W
7
= luasan x koef. angin tekan x beban angin = 1,62 x 0,2 x 25
= 8,1 kg b
Koefisien angin hisap = - 0,40 1 W
8
= luasan x koef. angin hisap x beban angin
= 1,62 x -0,4 x 25
= -16,2 kg 2 W
9
= luasan x koef. angin hisap x beban angin
= 4x -0,4 x 25
= -40 kg 3 W
10
= luasan x koef. angin hisap x beban angin
= 5 x -0,4 x 25
= -50 kg 4 W
11
= luasan x koef. angin hisap x beban angin = 5,88 x -0,4 x 25
= -58,8 kg 5 W
12
= luasan x koef. angin hisap x beban angin = 6 x -0,4 x 25
= -60 kg 6 W
13
= luasan x koef. angin hisap x beban angin = 6 x -0,4 x 25
= -60 kg 7 W
14
= luasan x koef. angin hisap x beban angin = 7 x -0,4 x 25
= -70 kg
perpustakaan.uns.ac.id digilib.uns.ac.id
Tugas Akhir
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung RSUD
111
Tabel 3.24. Perhitungan beban angin
Beban Angin
Beban kg
W x Cos kg
Input SAP2000
W y Sin kg
Input SAP2000
W
1
35 30.31
31 17.5
18 W
2
30 25.98
26 15
15 W
3
30 25.98
26 15
15 W
4
29 25.4604
26 14.7
15 W
5
25 21.65
22 12.5
13 W
6
20 17.32
18 10
10 W
7
8 7.0146
8 4.05
5 W
8
-16.2 -14.029
-15 -8,1
-9 W
9
-40 -34.64
-35 -15
-15 W
10
-50 -43.3
-44 -25
-25 W
11
-58.8 -50.921
-51 -29,4
30 W
12
-60 -51.96
-52 -30
-30 W
13
-60 -51.96
-52 -30
-30 W
14
-70 -60.62
-61 -35
-35
Dari perhitungan mekanika dengan menggunakan program SAP 2000 diperoleh gaya batang yang bekerja pada batang kuda-kuda utama sebagai berikut :
perpustakaan.uns.ac.id digilib.uns.ac.id
Tugas Akhir
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung RSUD
112
Tabel 3.25. Rekapitulasi gaya batang kuda-kuda utama A
Batang
Kombinasi
Batang
kombinasi
Tarik + kg
Tekan- Kg
Tarik + kg
Tekan- kg
1 12383.43
- 28
- 1173.77
2 12427.11
- 29
1119.58 -
3 11842.00
- 30
- 1957.91
4 11106.04
- 31
1984.03 -
5 10187.85
- 32
- 1762.54
6 9473.17
- 33
1843.69 -
7 9548.13
- 34
- 2410.79
8 10283.16
- 35
6607.21 -
9 11069.55
- 36
- 2838.98
10 11857.78
- 37
1897.13 -
11 12522.30
- 38
- 1840.49
12
12481.08 -
39
1699.08 -
13
-
14241.02 40
- 1660.36
14 -
13597.90 41
1145.87 -
15 -
12754.88 42
- 1202.28
16 -
11896.86 43
581.77 -
17 -
10728.70 44
- 747.83
18 -
9944.02 45
99.40 -
19
- 10136.30
20
- 10798.17
21 -
11799.71
22 -
12710.97
23 -
13553.16
24 -
14197.04
25 99.00
-
26 -
728.56
27 567.02
-
perpustakaan.uns.ac.id digilib.uns.ac.id
Tugas Akhir
Perencanaan Struktur dan Rencana Anggaran Biaya Gedung RSUD
113
3.7.4. Perencanaan Profil Kuda- kuda Utama A a. Perhitungan profil batang tarik