Document Deficiencies. If any document has deficiencies, return it to the
c. Evaluate Maintenance Organization. Ensure the following:
1 The inspection system is in place see chapter V of this SI to ensure: a Employees are familiar with and are capable of performing their assigned duties, b The system for reporting serious defects or unairworthy conditions is in place to ensure compliance with CASR Part 145.221, c The maintenance recordkeeping system is in place to ensure compliance with part 43 and CASR Part 145.219, and d The AMO has a QC system in place that ensures the articles upon which the AMO or any of its contractors perform a maintenance function are Airworthy. 2 There are a sufficient number of personnel to satisfy the volume and type of work to perform, as required by part 145 subpart D: a Ensure the AMO designates an employee as the accountable manager;Parts
» 47 PERATURAN DIRJEN HUBUD NO KP 463 TAHUN 2013
» Accountable Manager. The certificated AMO designates the accountable
» AMO Manual. The manual describes the procedures and policies of an
» Article. An article is an aircraft, airframe, aircraft engine, propeller,
» Capability List. A capability list CL is a list of articles on which the AMO
» Certificated AMO. A certificated AMO is an AMO that has a fixed main
» Class Ratings. Class ratings are issued if the AMO can prove its
» Contracting. Contracting means entering into an agreement between two
» Correction. A correction is an action to eliminate a detected
» Corrective Action. Corrective action is an action to eliminate the cause of
» Correspondence Acceptable to the DAAO—Documents, Manual or a
» Directly in Charge. The person directly in charge is responsible for the
» Domestic AMO. A domestic AMO is an automated Operations
» Exemptio Exemption is an authorization that permits an alternate
» Limited Ratings. AMOs are issued limited ratings for the performance of
» Limited Specialized Service Ratings. Limited specialized service ratings
» Line Maintenance. Line maintenance is unscheduled maintenance
» Satellite AMO. A satellite AMO is an additional certificated facility or
» Supervisor. Supervisors must oversee the work performed by any
» CAPABILITY LIST CL. A certificated AMO with a limited rating may perform maintenance,
» Contract Maintenance: An AMO must have the material and equipment
» MAINTENANCE PERFORMED AT ANOTHER LOCATION.
» TAKING CORRECTIVE ACTIONS ON DEFICIENCIES.
» Accept the CL. If the submission or revision is acceptable, DAAO
» Reject the CL. If the submission or revision is not acceptable, the DAAO
» Contract Maintenance. AMO that do not intend to contract out
» Extended Maintenance Away From Main Base Station. If the AMO
» Recurring Maintenance Away From Main Base Station. If the AMO is
» Airframe Maintenance or Alteration.
» Ratings. AIRFRAME RATINGS AND CLASSIFICATIONS.
» Limited Ratings. AIRFRAME RATINGS AND CLASSIFICATIONS.
» Line Maintenance Authorization. AIRFRAME RATINGS AND CLASSIFICATIONS.
» Other Issues. AIRFRAME RATINGS AND CLASSIFICATIONS.
» Limited Powerplant Ratings. Limited powerplant ratings must identify
» Auxiliary Power Units APU. Currently, confusion exists when
» PROPELLER LIMITED RATINGS. Mechanical
» RATING EXAMPLE. – GENERAL PROCEDURES
» The Certification Process This process provides for interaction between
» Previously Surrendered or Revoked Certificate. If an applicant
» Topics for Discussion. Discuss with the applicant the following subjects:
» Paperwork and Timeframe. The DAAO will give Form 120-01 – Pre
» Initiate the Certification Process.
» Evaluate the Application Package. Based on the initial survey of the
» Conduct an Application Meeting. Answer any open questions
» Review Documentation. One document may contain the AMO
» Document Deficiencies. If any document has deficiencies, return it to the
» Evaluate Maintenance Organization. Ensure the following:
» Distribute Certification Report. Retain the original certification report in
» Document the task. File all supporting paperwork in the DAAO office file. 8. FUTURE ACTIVITIES.
» The Renewal Process. This process provides for interaction between the
» Application Submission Time Frame. The AMO is responsible for
» Tracking Program. The DAAO must track renewal dates to establish an
» Documents. Ensure that all documents for the formal application package
» Line Station Authorization Surveillance. An AMO QCQA system audit
» Prepare Certificate of Approval. See Chapter III paragraph 6b of this
» TASK OUTCOMES. FUTURE ACTIVITIES.
» FORMAL APPLICATION PHASE – AMENDMENT OF DOMESTIC AMO
» DOCUMENT COMPLIANCE PHASE. – AMENDMENT OF DOMESTIC AMO
» DEMONSTRATION AND INSPECTION PHASE.
» CERTIFICATION PHASE – AMENDMENT OF DOMESTIC AMO
» TASK OUTCOMES. – AMENDMENT OF DOMESTIC AMO
» FUTURE ACTIVITIES. – AMENDMENT OF DOMESTIC AMO
» Documentation, Inspections, and Training. A certificated AMO must
» Manual References. Where applicable, the manual should contain
» Inspection and Maintenance Forms. A sample of each of the inspection
» Rejection. Reject the manuals or revisions by doing the following:
» Approval Once the applicantcertificate holder receives the approval of
» FUTURE ACTIVITIES. Continue inspection as required by SI 8900-6.9
» A satellite facility inspection is conducted in the same manner as a AMO
» Each certificated AMO must provide the following:
» A certificated AMO with an airframe rating must provide suitable
» A certificated AMO may perform those maintenance functions for which it
» A certificated AMO may perform maintenance, preventive maintenance,
» A certificated AMO may be authorized to perform line maintenance for an
» Evaluate the Housing and Facilities. Inspect the following: