BAHAN PERALATAN JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN A + B + C BAHAN PERALATAN JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN A + B + C

Lampiran 4 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK : No. PAKET KONTRAK : NAMA PAKET : PROP KAB KODYA : ITEM PEMBAYARAN NO. : 7.1 3 PERKIRAAN VOL. PEK. 71.30 JENIS PEKERJAAN : Beton K-350 TOTAL HARGA Rp. 33,042,007.14 SATUAN PEMBAYARAN : M3 THD. BIAYA PROYEK 0.79 PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA Rp. Rp A. TENAGA 1. Pekerja L01 jam 5.3012 1,800.00 9,542.17 2. Tukang L02 jam 1.7671 2,500.00 4,417.67 3. Mandor L03 jam 0.4418 2,750.00 1,214.86 JUMLAH HARGA TENAGA 15,174.70

B. BAHAN

1. Semen M12 Kg 384.3750 575.00 221,015.63 2. Pasir M01 M3 0.4271 33,800.00 14,435.42 3. Agregat Kasar M03 M3 0.6406 57,676.45 36,948.97 4. Kayu Perancah M19 M3 0.1500 650,000.00 97,500.00 5. Paku M18 Kg 1.5000 4,000.00 6,000.00 JUMLAH HARGA BAHAN 375,900.02

C. PERALATAN

1. Conc. Mixer E06 jam 0.4418 12,290.01 5,429.32 2. Water Tanker E23 jam 0.0521 29,327.95 1,527.96 3. Con. Vibrator E20 jam 0.4418 7,304.22 3,226.76 4. Con, Pump E28 jam 0.4418 43,991.98 19,434.21 5. Alat Bantu Ls 1.0000 600.00 600.00 JUMLAH HARGA PERALATAN 30,218.25 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN A + B + C 421,292.97 E. OVERHEAD PROFIT 10.0 x D 42,129.30 F. HARGA SATUAN PEKERJAAN D + E 463,422.26 Universitas Kristen Maranatha Lampiran 5 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK : No. PAKET KONTRAK : NAMA PAKET : PROP KAB KODYA : ITEM PEMBAYARAN NO. : 7.1 5 PERKIRAAN VOL. PEK. 71.50 JENIS PEKERJAAN : Beton K-250 TOTAL HARGA Rp. 27,602,370.51 SATUAN PEMBAYARAN : M3 THD. BIAYA PROYEK 0.66 PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA Rp. Rp A. TENAGA 1. Pekerja Biasa L01 jam 5.3012 1,800.00 9,542.17 2. Tukang L02 jam 1.7671 2,500.00 4,417.67 3. Mandor L03 jam 0.4418 2,750.00 1,214.86 JUMLAH HARGA TENAGA 15,174.70

B. BAHAN

1. Semen M12 Kg 354.8077 575.00 204,014.42 2. Pasir M01 M3 0.4435 33,800.00 14,990.63 3. Agregat Kasar M03 M3 0.6406 57,676.45 36,948.97 4. Kayu Perancah M19 M3 0.1000 650,000.00 65,000.00 5. Paku M18 Kg 1.0000 4,000.00 4,000.00 JUMLAH HARGA BAHAN 324,954.02

C. PERALATAN

1. Conc. Mixer E06 jam 0.4418 12,290.01 5,429.32 2. Water Tanker E23 jam 0.0534 29,327.95 1,567.14 3. Con. Vibrator E20 jam 0.4418 7,304.22 3,226.76 4. Alat Bantu Ls 1.0000 600.00 600.00 JUMLAH HARGA PERALATAN 10,823.22 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN A + B + C 350,951.94 E. OVERHEAD PROFIT 10.0 x D 35,095.19 F. HARGA SATUAN PEKERJAAN D + E 386,047.14 Universitas Kristen Maranatha Lampiran 6 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK : No. PAKET KONTRAK : NAMA PAKET : PROP KAB KODYA : ITEM PEMBAYARAN NO. : 7.1 6 PERKIRAAN VOL. PEK. 71.60 JENIS PEKERJAAN : Beton K-175 TOTAL HARGA Rp. 24,723,011.74 SATUAN PEMBAYARAN : M3 THD. BIAYA PROYEK 0.59 PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA Rp. Rp A. TENAGA 1. Pekerja L01 jam 5.3012 1,800.00 9,542.17 2. Tukang L02 jam 1.7671 2,500.00 4,417.67 3. Mandor L03 jam 0.4418 2,750.00 1,214.86 JUMLAH HARGA TENAGA 15,174.70 B. BAHAN 1. Semen M12 Kg 318.1034 575.00 182,909.48 2. Pasir M01 M3 0.3976 33,800.00 13,439.87 3. Agregat Kasar M03 M3 0.7069 57,676.45 40,771.28 4. Kayu Perancah M19 M3 0.0750 650,000.00 48,750.00 5. Paku M18 Kg 0.5000 4,000.00 2,000.00 JUMLAH HARGA BAHAN 287,870.64 C. PERALATAN 1. Conc. Mixer E06 jam 0.4418 12,290.01 5,429.32 2. Water Tanker E23 jam 0.0546 29,327.95 1,601.72 3. Con. Vibrator E20 jam 0.4418 7,304.22 3,226.76 4. Alat Bantu Ls 1.0000 600.00 600.00 JUMLAH HARGA PERALATAN 10,857.81 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN A + B + C

Dokumen yang terkait

Evaluasi Mekanistik Desain Perkerasan Lentur Bina Marga Nomor 02/M/Bm/2013 Terhadap Pembebanan Dan Modulus Lapisan

13 102 142

Evaluasi Perencanaan Tebal Perkerasan Lentur Metode Bina Marga Pt T-01-2002-B Dengan Menggunakan Program Kenpave

16 143 118

STUDI KOMPARASI PERENCANAAN TEBAL PERKERASAN KAKU JALAN TOL MENGGUNAKAN Studi Komparasi Perencanaan Tebal Perkerasan Kaku Jalan Tol Menggunakan Metode Bina Marga 2002 Dan Aashto 1993 ( Studi Kasus : Ruas Jalan Tol Solo – Kertosono ).

0 2 17

PENDAHULUAN Studi Komparasi Perencanaan Tebal Perkerasan Kaku Jalan Tol Menggunakan Metode Bina Marga 2002 Dan Aashto 1993 ( Studi Kasus : Ruas Jalan Tol Solo – Kertosono ).

0 4 4

STUDI KOMPARASI PERENCANAAN TEBAL PERKERASAN KAKU JALAN TOL MENGGUNAKAN METODE BINA MARGA 2002 DAN AASHTO 1993 Studi Komparasi Perencanaan Tebal Perkerasan Kaku Jalan Tol Menggunakan Metode Bina Marga 2002 Dan Aashto 1993 ( Studi Kasus : Ruas Jalan Tol

0 2 11

Evaluasi Perencanaan Tebal Perkerasan Lentur Metode Bina Marga Pt T-01-2002-B Dengan Menggunakan Program Kenpave

1 1 14

Evaluasi Perencanaan Tebal Perkerasan Lentur Metode Bina Marga Pt T-01-2002-B Dengan Menggunakan Program Kenpave

0 0 1

Evaluasi Perencanaan Tebal Perkerasan Lentur Metode Bina Marga Pt T-01-2002-B Dengan Menggunakan Program Kenpave

0 0 8

Evaluasi Perencanaan Tebal Perkerasan Lentur Metode Bina Marga Pt T-01-2002-B Dengan Menggunakan Program Kenpave

0 0 31

Evaluasi Perencanaan Tebal Perkerasan Lentur Metode Bina Marga Pt T-01-2002-B Dengan Menggunakan Program Kenpave

0 1 2