54
Unit 2013
2014 2015
2016 2017
2018 2019
2020 2021
2022 Kebutuhan
=== Interkoneksi M asohi, Waipia, Liang, Kairatu Piru 2014 === Interkoneksi Kairatu Piru 2017
Produksi Energi GWh
32.4 36.0
41.1 45.0
94.7 110.4
120.7 132.0
144.4 158.0
Load Factor 59.8
59.9 59.9
60.0 46.9
45.4 45.5
45.6 45.6
45.7 Beban Puncak
MW 6.2
6.9 7.8
8.6 23.0
27.8 30.3
33.1 36.1
39.5
Pasokan
Kapasitas Terpasang MW
15.3 15.3
15.3 15.3
15.3 15.3
Daya Mampu 8.9
9.8 9.8
10.1 4.7
4.7 -
- -
- Derating Capacity
MW 6.4
5.5 5.5
5.2 10.6
10.6
Pembangkit PLN
Manufacture Thn Opr
Size PLTD Masohi
6.7 4.7
4.7 4.7
4.7 4.7
4.7 PLTD Liang
0.9 0.3
0.3 0.3
PLTD Waipia 0.8
0.5 0.5
0.5 0.5
PLTD Kairatu 3.9
2.6 2.6
2.6 2.7
- -
PLTD Piru 3.0
1.2 1.8
1.8 1.9
Pembangkit Sewa
PLTD Sewa HSD 5.0
5.0 5.0
- -
- -
- -
- Masohi Comiko
2.3 PLTD
2.0 2.0
2.0 Kairatu Sakabaja
3.4 PLTD
2.0 2.0
2.0 Liang MEP
1.68 PLTD
1.0 1.0
1.0
PLN ON GOING COMMITTED IPP ON GOING COMMITTED
Sapalewa PLTM
8.0
RENCANA TAMBAHAN KAPASITAS
Seram Peaker PLTMG
10.0 Kairatu
PTMPD 1.2
Masohi PTMPD
1.2 Wai Tala
PLTA 13.5
40.5 Nua Masohi
PLTA 8.0
Wae Mala PLTM
2.0 Makariki
PLTM 4.0
Isal PLTM
6.0 2.0
Tene PLTM
4.0
Jumlah Efektif MW
13.9 14.8
17.2 26.5
43.1 49.1
59.9 100.4
100.4 100.4
Cadangan MW
2.1 2.1
2.1 6.2
9.0 9.0
18.5 18.5
18.5 18.5
Pemeliharaan MW
1.1 1.1
1.1 5.0
5.0 5.0
13.5 13.5
13.5 13.5
Operasi MW
1.0 1.0
1.0 1.2
4.0 4.0
5.0 5.0
5.0 5.0
SurplusDefisit N-2 MW
5.6 5.9
7.3 11.7
11.1 12.3
11.1 48.8
45.8 42.4
PasokanKebutuhan
55
55
Unit 2013
2014 2015
2016 2017
2018 2019
2020 2021
2022 Kebutuhan
Produksi Energi GWh
166.3 192.7
216.3 245.2
274.2 304.4
335.9 370.9
409.5 452.3
Load Factor 72.6
73.3 74.1
74.8 75.6
76.3 77.1
77.9 78.6
79.4 Beban Puncak
MW 26.2
30.0 33.3
37.4 41.4
45.5 49.7
54.4 59.4
65.0
Pasokan
Kapasitas Terpasang MW
15.5 15.5
15.5 15.5
15.5 15.5
15.5 15.5
15.5 15.5
Daya Mampu MW
13.0 13.0
13.0 13.0
13.0 13.0
13.0 13.0
13.0 10.4
Derating Capacity MW
2.5 2.5
2.5 2.5
2.5 2.5
2.5 2.5
2.5 5.1
Pembangkit PLN
Manufacture Size
PLTD Kayu Merah 11.5
10.4 10.4
10.4 10.4
10.4 10.4
10.4 10.4
10.4 10.4
PLTD Soa Siu 3.9
2.6 2.6
2.6 2.6
2.6 2.6
2.6 2.6
2.6
Pembangkit Sewa
PLTD Sewa HSD PLTD
24.0 15.0
17.0 -
- -
- -
- Kayu Merah Sewatama 1
5.75 MW
6.0 4.0
6.0 Kayu Merah Sewatama 2
6.69 MW
7.0 4.0
4.0 Kayu Merah Bima Golten
7.2 MW
7.0 5.0
5.0 Soa Siu Triagung JA
2.5 MW
4.0 2.0
2.0
PLN ON GOING COMMITTED
Tidore FTP1 PLTU
14
IPP ON GOING COMMITTED RENCANA TAMBAHAN KAPASITAS
Tidore 2 Merah Putih PLTU
14 Tidore 3
PLTU 14
Ternate Peaker PLTMG
20 10
10
Jumlah Efektif MW
37.0 42.0
44.0 61.0
61.0 71.0
71.0 85.0
85.0 92.4
Cadangan MW
10.6 10.6
10.6 17.0
17.0 17.0
17.0 17.0
17.0 17.0
Pemeliharaan MW
7.0 7.0
7.0 10.0
10.0 10.0
10.0 10.0
10.0 10.0
Operasi MW
3.6 3.6
3.6 7.0
7.0 7.0
7.0 7.0
7.0 7.0
SurplusDefisit N-2 MW
0.24 1.39
0.06 6.59
2.6 8.5