No. U R A I A N
KODE KOEF.
SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan
VIBRATORY ROLLER 5-8 T. E19
2. Tenaga
Pw 60,0
HP 3.
Kapasitas Cp
8,0 Ton
4. Umur Ekonomis
A 5,0
Tahun 5.
Jam Kerja Dalam 1 Tahun W
1.800,0 Jam
6. Harga Setempat
B 543.229.500
Rupiah 7.
Harga Ban 2,00
Bh b1
9.000.000 Rupiah
B 534.229.500
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat
= 10 x B C
53.422.950 Rupiah
2. Faktor Angsuran Modal =
i x 1 + iA D
0,26380 -
1 + iA - 1 3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
B - C x D E
70.464,20 Rupiah
W b. Asuransi dan Lain-lain =
0.20 x C F
5.935,88 Rupiah
W
Biaya Pasti per Jam = E + F
G 76.400,08
Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = 0.125-0.175 LtrHPJam x Pw x Ms
H 0,00
Rupiah 2.
Pelumas = 0.0035-0.006 LtrHPJam x Pw x Mp I
0,00 Rupiah
3. Workshop =
6,25 - 8,75 x B J
22.634,56 Rupiah
W 4.
Sparepart = 12,5 - 17,5 x B
K 37.724,27
Rupiah W
5. Biaya Ban =
Jml Ban x Hrg Ban L
7.500,00 Rupiah
1200 6.
Operator = 1 Orang Jam x U1
L 0,00
Rupiah 7.
Pembantu Operator = 1 Orang Jam x U2
M 0,00
Rupiah
Biaya Operasi per Jam = H+I+J+K+L+M
P 67.858,83
Rupiah
D. TOTAL BIAYA SEWA ALAT JAM = G + P
S 144.258,91
Rupiah E.
LAIN - LAIN
1. Tingkat Suku Bunga
i 10,00 Tahun
2. Upah Operator
U1 0,00
Rp.Jam 3.
Upah Pembantu Operator U2
0,00 Rp.Jam
4. Bahan Bakar Bensin
Mb 0,00
Liter 5.
Bahan Bakar Solar Ms
0,00 Liter
6. Minyak Pelumas
Mp 0,00
Liter 7.
PPN diperhitungkan pada lembar Rekapitulasi PPN
10,00 Biaya Pekerjaan
Note : = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi dengan declining methode.
ANALISA BIAYA SEWA ALAT PER JAM KERJA
No. U R A I A N
KODE KOEF.
SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan
CONCRETE VIBRATOR E20
2. Tenaga
Pw 3,0
HP 3.
Kapasitas Cp
- -
4. Umur Ekonomis
A 5,0
Tahun 5.
Jam Kerja Dalam 1 Tahun W
1.500,0 Jam
6. Harga Setempat
B 15.000.000
Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat
= 10 x B C
1.500.000 Rupiah
2. Faktor Angsuran Modal =
i x 1 + iA D
0,26380 -
1 + iA - 1 3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
B - C x D E
2.374,18 Rupiah
W b. Asuransi dan Lain-lain =
0.20 x C F
200,00 Rupiah
W
Biaya Pasti per Jam = E + F
G 2.574,18
Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = 0.125-0.175 LtrHPJam x Pw x Ms
H 0,00
Rupiah 2.
Pelumas = 0.0035-0.006 LtrHPJam x Pw x Mp I
0,00 Rupiah
3. Workshop =
6,25 - 8,75 x B J
750,00 Rupiah
W 4.
Sparepart = 12,5 - 17,5 x B
K 1.250,00
Rupiah W
5. Operator
= 1 Orang Jam x U1 L
- Rupiah
6. Pembantu Operator
= 1 Orang Jam x U2 M
0,00 Rupiah
Biaya Operasi per Jam =
H+I+J+K+L+M P
2.000,00
Rupiah
D. TOTAL BIAYA SEWA ALAT JAM = G + P
S 4.574,18
Rupiah E.
LAIN - LAIN
1. Tingkat Suku Bunga
i 10,00 Tahun
2. Upah Operator Sopir
U1 -
Rp.Jam 3.
Upah Pembantu Operator Pmb.Sopir U2
0,00 Rp.Jam
4. Bahan Bakar Bensin
Mb 0,00
Liter 5.
Bahan Bakar Solar Ms
0,00 Liter
6. Minyak Pelumas
Mp 0,00
Liter 7.
PPN diperhitungkan pada lembar Rekapitulasi PPN
10,00 Biaya Pekerjaan
Note : = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi dengan declining methode.
ANALISA BIAYA SEWA ALAT PER JAM KERJA
No. U R A I A N
KODE KOEF.
SATUAN KET.
A. URAIAN PERALATAN