TOTAL BIAYA SEWA ALAT JAM = G + P URAIAN PERALATAN BIAYA PASTI PER JAM KERJA BIAYA OPERASI PER JAM KERJA TOTAL BIAYA SEWA ALAT JAM = G + P

No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN

1. Jenis Peralatan VIBRATORY ROLLER 5-8 T. E19 2. Tenaga Pw 60,0 HP 3. Kapasitas Cp 8,0 Ton 4. Umur Ekonomis A 5,0 Tahun 5. Jam Kerja Dalam 1 Tahun W 1.800,0 Jam 6. Harga Setempat B 543.229.500 Rupiah 7. Harga Ban 2,00 Bh b1 9.000.000 Rupiah B 534.229.500

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 x B C 53.422.950 Rupiah 2. Faktor Angsuran Modal = i x 1 + iA D 0,26380 - 1 + iA - 1 3. Biaya Pasti per Jam : a. Biaya Pengembalian Modal = B - C x D E 70.464,20 Rupiah W b. Asuransi dan Lain-lain = 0.20 x C F 5.935,88 Rupiah W Biaya Pasti per Jam = E + F G 76.400,08 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = 0.125-0.175 LtrHPJam x Pw x Ms H 0,00 Rupiah 2. Pelumas = 0.0035-0.006 LtrHPJam x Pw x Mp I 0,00 Rupiah 3. Workshop = 6,25 - 8,75 x B J 22.634,56 Rupiah W 4. Sparepart = 12,5 - 17,5 x B K 37.724,27 Rupiah W 5. Biaya Ban = Jml Ban x Hrg Ban L 7.500,00 Rupiah 1200 6. Operator = 1 Orang Jam x U1 L 0,00 Rupiah 7. Pembantu Operator = 1 Orang Jam x U2 M 0,00 Rupiah Biaya Operasi per Jam = H+I+J+K+L+M P 67.858,83 Rupiah D. TOTAL BIAYA SEWA ALAT JAM = G + P S 144.258,91 Rupiah E. LAIN - LAIN 1. Tingkat Suku Bunga i 10,00 Tahun 2. Upah Operator U1 0,00 Rp.Jam 3. Upah Pembantu Operator U2 0,00 Rp.Jam 4. Bahan Bakar Bensin Mb 0,00 Liter 5. Bahan Bakar Solar Ms 0,00 Liter 6. Minyak Pelumas Mp 0,00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi PPN 10,00 Biaya Pekerjaan Note : = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi dengan declining methode. ANALISA BIAYA SEWA ALAT PER JAM KERJA No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN

1. Jenis Peralatan CONCRETE VIBRATOR E20 2. Tenaga Pw 3,0 HP 3. Kapasitas Cp - - 4. Umur Ekonomis A 5,0 Tahun 5. Jam Kerja Dalam 1 Tahun W 1.500,0 Jam 6. Harga Setempat B 15.000.000 Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 x B C 1.500.000 Rupiah 2. Faktor Angsuran Modal = i x 1 + iA D 0,26380 - 1 + iA - 1 3. Biaya Pasti per Jam : a. Biaya Pengembalian Modal = B - C x D E 2.374,18 Rupiah W b. Asuransi dan Lain-lain = 0.20 x C F 200,00 Rupiah W Biaya Pasti per Jam = E + F G 2.574,18 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = 0.125-0.175 LtrHPJam x Pw x Ms H 0,00 Rupiah 2. Pelumas = 0.0035-0.006 LtrHPJam x Pw x Mp I 0,00 Rupiah 3. Workshop = 6,25 - 8,75 x B J 750,00 Rupiah W 4. Sparepart = 12,5 - 17,5 x B K 1.250,00 Rupiah W 5. Operator = 1 Orang Jam x U1 L - Rupiah 6. Pembantu Operator = 1 Orang Jam x U2 M 0,00 Rupiah Biaya Operasi per Jam = H+I+J+K+L+M P 2.000,00 Rupiah D. TOTAL BIAYA SEWA ALAT JAM = G + P S 4.574,18 Rupiah E. LAIN - LAIN 1. Tingkat Suku Bunga i 10,00 Tahun 2. Upah Operator Sopir U1 - Rp.Jam 3. Upah Pembantu Operator Pmb.Sopir U2 0,00 Rp.Jam 4. Bahan Bakar Bensin Mb 0,00 Liter 5. Bahan Bakar Solar Ms 0,00 Liter 6. Minyak Pelumas Mp 0,00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi PPN 10,00 Biaya Pekerjaan Note : = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi dengan declining methode. ANALISA BIAYA SEWA ALAT PER JAM KERJA No. U R A I A N KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN