BAB VI PENGGALIAN, LISTRIK, DAN AIR BERSIH
6.3.2 Jumlah Perusahaan Air Minum, kapasitas Produksi, Kapasitas Distribusi dan
Produksi Air Minum menurut Sumber Air yang Dipakai di PDAM, 2012-2014 Tabel
Table
Number of Water Supply Enterprise, Production Capacity, Distribution Capacity, and Water Production by Water Resources, 2012-2014
No. Uraian
2012 2013
2014 Descrpition
1 2
3 4
5 1
Jumlah Perusahaan 1
1 1
Number of Company 2
Jumlah Kapasitas Produksi Potensial literdetik 240
260 310
Number of Potential Production Capacity litersecond 3
Jumlah Kapasitas Produksi Efektif literdetik 193
202 223
Number of Effective Production Capacity litersecond 4
Produksi Air m3 6 082 900
6 360 114 7 021 175
Water Production m3 5
Distribusi Air m3 5 643 436
5 984 085 6 107 523
Water Distribution m3 6
Sumber Air Water Resources
a. Sungai River V
V V
b. Danau Lake -
- -
c. Mata Air Spring -
- -
d. Lainnya Others -
- -
Sumber: Kantor PDAM kabupaten Lebak Source : Office of Local Waterwork in Lebak Regency
Keterangan Notes : Cabang Rangkasbitung - Sungai Ciujung Rangkasbitung Branch - Ciujung River
Cabang Malingping - Sungai Cilangkahan Malingping Branch - Cilangkahan River Cabang Sajira - Sungai Ciberang Sajira Branch - Ciberang River
Cabang Warunggunung - Air Tanah Dalam Warunggunung Branch - Artesian
Lebak Dalam Angka 2015 187
le ba
kka b.
bp s.
go .id
QUARRYING, ELECTRICITY, AND WATER SUPPLY CHAPTER VI
Tabel 6.3.3
Jumlah Pekerja Teknis dan Administrsi PDAM, 2012-2014 Table
Number of Technical and Administration Worker of Local Waterwork, 2012-2014
No. Uraian
2012 2013
2014 Descrpition
1 2
3 4
5 I
Jumlah Pekerja Teknik Number of Technical Worker
a. Sekolah Dasar 11
10 9
Primary School b. Sekolah Lanjutan Tingkat Pertama
8 7
7 Junior High School
c. Sekolah Lanjutan Tinggat Atas 44
49 50
Senior High School d. Akademi
4 4
4 Bachelor Degree
e. Universitas 6
5 5
University Graduate
II Jumlah Pekerja Administrasi
Number of Administration Worker a. Sekolah Dasar
4 5
3 Primary School
b. Sekolah Lanjutan Tingkat Pertama 2
3 3
Junior High School c. Sekolah Lanjutan Tinggat Atas
61 67
60 Senior High School
d. Akademi 2
2 4
Bachelor Degree e. Universitas
13 18
20 University Graduate
Jumlah Total 155
170 165
Sumber: Kantor PDAM kabupaten Lebak Source : Office of Local Waterwork in Lebak Regency
188
Lebak in Figures 2015
le ba
kka b.
bp s.
go .id
BAB VI PENGGALIAN, LISTRIK, DAN AIR BERSIH
Tabel 6.3.4
Jumlah pelanggan Air Minum menurut Jenis Konsumen, 2012-2014 Table
Number of Water Costumer by Type of Consumer Group, 2012-2014
No. Uraian
2012 2013
2014 Descrpition
1 2
3 4
5 1
RUMAH TANGGA 16 202
16 474 20 171
Household 2
NIAGAPERDAGANGAN DAN INDUSTRI 362
350 355
Trading and Industry 3
BADAN SOSIAL 348
343 360
Social Institution 4
UMUM -
- -
Public 5
INSTANSI PEMERINTAH 163
166 172
Government Institution 6
LAINNYA Terminal Air 8
8 Others
Jumlah Total 17 083
17 341 21 058
Sumber: Kantor PDAM kabupaten Lebak Source : Office of Local Waterwork in Lebak Regency
Lebak Dalam Angka 2015 189
le ba
kka b.
bp s.
go .id
QUARRYING, ELECTRICITY, AND WATER SUPPLY CHAPTER VI
Tabel 6.3.5
Volume Air Minum yang Didistribusikan menurut Jenis Konsumen, 2012-2014 Table
Volume of Water Distributed by Type of Consumer Group, 2012-2014
No. Uraian
2012 2013
2014 Descrpition
1 2
3 4
5 1
RUMAH TANGGA 3 247 691
3 199 245 3 398 685
Household 2
NIAGAPERDAGANGAN DAN INDUSTRI 74 299
67 352 64 114
Trading and Industry 3
BADAN SOSIAL 105 763
105 962 94 701
Social Institution 4
UMUM -
- -
Public 5
INSTANSI PEMERINTAH 89 674
93 283 112 602
Government Institution 6
LAINNYA Terminal Air 47 926
20 Others
Jumlah Total 3 565 353
3 465 862 3 670 102
Sumber: Kantor PDAM kabupaten Lebak Source : Office of Local Waterwork in Lebak Regency
190
Lebak in Figures 2015
le ba
kka b.
bp s.
go .id
BAB VI PENGGALIAN, LISTRIK, DAN AIR BERSIH
Tabel 6.3.6
Nilai Air Minum yang Didistribusikan menurut Jenis Konsumen, 2012-2014 Table
Value of Water Distributed by Type of Consumer Group, 2012-2014
No. Uraian
2012 2013
2014 Descrpition
1 2
3 4
5 1
RUMAH TANGGA 13 169 797 950
13 216 376 790 14 072 673 840
Household 2
NIAGAPERDAGANGAN DAN INDUSTRI
720 289 070 637 427 240
599 219 080 Trading and Industry
3 BADAN SOSIAL
243 270 060 243 476 500
221 026 310 Social Institution
4 UMUM
- -
- Public
5 INSTANSI PEMERINTAH
560 963 630 592 315 760
707 981 570 Government Institution
6 LAINNYA Terminal Air
271 820 500 3 019 000
Others
Jumlah Total 14 966 141 210
14 692 615 290 15 600 900 800
Sumber: Kantor PDAM kabupaten Lebak Source : Office of Local Waterwork in Lebak Regency
Lebak Dalam Angka 2015 191
le ba
kka b.
bp s.
go .id
QUARRYING, ELECTRICITY, AND WATER SUPPLY CHAPTER VI
Tabel 6.3.7
Jumlah Pelanggan PDAM menurut Golongan Tarip, 2014 Table
Number of Customers of Local Waterwork by Kind of Tarif, 2014
No. Uraian
Sosial Khusus Sosial Umum
Rumah tangga Instansi
Pemerintah Descrpition
Social Special Publik Social
Household Goverment
Instution 1
2 3
4 5
6 1
Malingping 8
61 1.777
26
2 Wanasalam
- -
- -
3 Panggarangan
- -
218 -
4 Cihara
- -
125 -
5 Bayah
- 19
2.106 17
6 Cilograng
- -
- -
7 Cibeber
- -
- -
8 Cijaku
- 5
154 4
9 Cigemblong
- -
- -
10 Banjarsari
- -
- -
11 Cileles
- -
- -
12 Gunungkencana
- -
- -
13 Bojongmanik
- -
- -
14 Cirinten
- -
- -
15 Leuwidamar
- 5
928 -
16 Muncang
- -
- -
17 Sobang
- -
- -
18 Cipanas
- 43
1.301 17
19 Lebakgdong
- 4
79 1
20 Sajira
- 14
814 7
21 Cimarga
- -
602 -
22 Cikulur
- -
- -
23 Warunggunung
- 12
335 12
24 Cibadak
- 21
1.168 1
25 Rangkasbitung
- 164
9.106 79
26 Kalanganyar
- 9
1.400 6
27 Maja
- -
- -
28 Curugbitung
- -
60 -
Jumlah Total 8
357 20.173
170
Sumber: Kantor PDAM kabupaten Lebak Source : Office of Local Waterwork in Lebak Regency
192
Lebak in Figures 2015
le ba
kka b.
bp s.
go .id
BAB VI PENGGALIAN, LISTRIK, DAN AIR BERSIH
Lanjutan Tabel Continued Table 6.3.7
No Uraian
Niaga Kecil Niaga Besar
Industri Kecil Industri Besar
Descrpition Small Scale
Business Large Scale
Small Scale Industry
Large Scale Industry 1
2 7
8 9
10 1
Malingping 25
4 -
-
2 Wanasalam
- -
- -
3 Panggarangan
- -
- -
4 Cihara
- -
- -
5 Bayah
5 -
- -
6 Cilograng
- -
- -
7 Cibeber
- -
- -
8 Cijaku
- -
- -
9 Cigemblong
- -
- -
10 Banjarsari
- -
- -
11 Cileles
- -
- -
12 Gunungkencana
- -
- -
13 Bojongmanik
- -
- -
14 Cirinten
- -
- -
15 Leuwidamar
- -
- -
16 Muncang
- -
- -
17 Sobang
- -
- -
18 Cipanas
6 3
- 1
19 Lebakgdong
- -
- -
20 Sajira
- -
- -
21 Cimarga
- -
- -
22 Cikulur
- -
- -
23 Warunggunung
- -
- -
24 Cibadak
12 -
- 2
25 Rangkasbitung
273 14
1 1
26 Kalanganyar
3 -
- -
27 Maja
- -
- -
28 Curugbitung
- -
- -
Jumlah Total 324
21 1
4
Sumber: Kantor PDAM kabupaten Lebak Source : Office of Local Waterwork in Lebak Regency
Lebak Dalam Angka 2015 193
le ba
kka b.
bp s.
go .id
le ba
kka b.
bp s.
go .id
Perdagangan, Hotel, Seni dan Pariwisata
Trade, Accomodation, Art and Tourism
7
le ba
kka b.
bp s.
go .id
le ba
kka b.
bp s.
go .id
BAB VII PERDAGANGAN, HOTEL, SENI DAN PARIWISATA
Tabel 7.1.1
Daftar Penerimaan Biaya Administrasi Retribusi Perusahaan Wajib SIGASITU, 2014
Table List of Receiped Company Administration Fee Retribution SIGASITU, 2014
Bulan PT
Kopera si
Coopera tive
CV PO
Badan Usaha
Lain Others
Jumlah Total
No. Limited
Company Limited
Partner
ship Month
1 2
3 4
5 6
7 8
1 Januari
9 050 000 -
- 4 530 350
- 13 580 350
January 2
Februari 1 875 000
- 500 000
7 509 300 -
9 884 300 February
3 Maret
6 828 000 -
- 10 791 550
- 17 619 550
March 4
April 27 581 000
- -
25 568 750 -
53 149 750 April
5 Mei
115 479 825 -
3 460 000 480 000
- 119 419 825
May 6
Juni -
- -
3 165 000 -
3 165 000 June
7 Juli
6 876 900 -
492 000 1 252 500
- 8 621 400
July 8
Agustus 871 200
- 250 000
898 000 -
2 019 200 August
9 September
69 866 950 -
- 1 612 500
- 71 479 450
September 10
Oktober 27 355 900
- 3 394 000
1 851 500 -
32 601 400 October
11 Nopember
1 691 750 -
813 000 1 937 500
- 4 442 250
November 12
Desember 5 063 000
125 000 1 080 000 4 136 400
- 10 404 400
December
Jumlah Total 272 539 525 125 000 9 989 000 63 733 350
- 346 386 875
Sumber: BPMPPT Kabupaten Lebak Source : BPMPPT Affair of Lebak Regency
Lebak Dalam Angka 2015 197
le ba
kka b.
bp s.
go .id
TRADE, ACCOMODATION, ART AND TOURISM CHAPTER VII
Tabel 7.1.2
Perkembangan Penerbitan SIUP dan TDUP, 2012-2014 Table
Progress for SIUP and TDUP Publications, 2012-2014 No.
Bulan 2012
2013 2014
Month 1
2 3
4 5
1 Januari
75 58
30 January
2 Februari
52 69
51 February
3 Maret
55 78
82 March
4 April
60 101
115 April
5 Mei
72 84
47 May
6 Juni
51 56
70 June
7 Juli
44 68
38 July
8 Agustus
55 31
43 August
9 September
51 39
51 September
10 Oktober
76 52
61 October
11 Nopember
68 45
55 November
12 Desember
54 54
76 December
Jumlah Total 713
735 719
Sumber: BPMPPT Kabupaten Lebak Source : BPMPPT Affair of Lebak Regency
198
Lebak in Figures 2015
le ba
kka b.
bp s.
go .id
BAB VII PERDAGANGAN, HOTEL, SENI DAN PARIWISATA
Tabel 7.1.3
Penerbitan Tanda Daftar Perusahaan, 2014 Table
Publications of List Sign Company, 2014
Bulan PT
Koperasi Cooperative
CV PO
Badan Usaha
Lain Others
Jumlah Total
No. Limited
Company Limited
Partnership Month
1 2
3 4
5 6
7 8
1 Januari
6 1
12 31
1 51
January 2
Februari 9
- 20
38 -
67 February
3 Maret
5 1
22 75
2 105
March 4
April 7
2 17
101 3
130 April
5 Mei
5 2
19 23
- 49
May 6
Juni 10
1 24
41 3
79 June
7 Juli
7 2
12 25
1 47
July 8
Agustus 9
2 22
27 -
60 August
9 September
20 4
15 31
1 71
September 10
Oktober 23
5 23
38 1
90 October
11 Nopember
7 2
23 32
- 64
November 12
Desember 9
1 28
60 -
98 December
Jumlah Total 117
23 237
522 12
911
Sumber: BPMPPT Kabupaten Lebak Source : BPMPPT Affair of Lebak Regency
Lebak Dalam Angka 2015 199
le ba
kka b.
bp s.
go .id
TRADE, ACCOMODATION, ART AND TOURISM CHAPTER VII
Tabel 7.1.4
Perkembangan Penerbitan Tanda Daftar Perusahaan, 2012-2014 Table
Progress for Publication of List Sign Company TDP, 2012-2014 No.
Bulan 2012
2013 2014
Month 1
2 3
4 5
1 Januari
88 72
51 January
2 Februari
108 89
67 February
3 Maret
73 97
105 March
4 April
68 139
130 April
5 Mei
104 108
49 May
6 Juni
95 84
79 June
7 Juli
41 78
47 July
8 Agustus
79 41
60 August
9 September
81 52
71 September
10 Oktober
93 65
90 October
11 Nopember
94 58
64 November
12 Desember
78 81
98 December
Jumlah Total 1.002
964 911
Sumber: BPMPPT Kabupaten Lebak Source : BPMPPT Affair of Lebak Regency
200
Lebak in Figures 2015
le ba
kka b.
bp s.
go .id
BAB VII PERDAGANGAN, HOTEL, SENI DAN PARIWISATA
Tabel 7.1.5
Banyaknya Penerbitan SIUPTDUP, Tanda Daftar Perusahaan TDPdan Tanda Daftar Gudang TDG, 2014
Table Number of SIUPTDUP, TDP and TDG Publications, 2014
No. Penerbitan
2012 2013
2014 1
2 3
5
1 S I U P
713 735
719 2
T D U P -
- -
3 T D G Gudang
13 26
13 4
T D P 1. PT Limited Company
91 84
117 2. Koperasi Cooperative
27 39
23 3. CV Limited Partnership
168 153
237 4. Firma Firm
- -
- 5. PO
712 685
522 6. Badan Usaha Lain Others
4 3
12
Jumlah Total 1 728
1 725 1 643
Sumber: BPMPPT Kabupaten Lebak Source : BPMPPT Affair of Lebak Regency
Lebak Dalam Angka 2015 201
le ba
kka b.
bp s.
go .id
TRADE, ACCOMODATION, ART AND TOURISM CHAPTER VII
Tabel 7.1.6
Penerbitan TDI dan IUI, 2014 Table
Publication of TDI and IUI, 2014 No.
Bulan T D I
IUI Jumlah
Total Month
1 2
3 4
5
1 Januari
10 -
10 January
2 Februari
4 -
4 February
3 Maret
12 -
12 March
4 April
10 -
10 April
5 Mei
1 -
1 May
6 Juni
8 1
9 June
7 Juli
2 -
2 July
8 Agustus
4 -
4 August
9 September
3 1
4 September
10 Oktober
1 -
1 October
11 Nopember
3 -
3 November
12 Desember
7 -
7 December
Jumlah Total 65
2 67
Sumber: BPMPPT Kabupaten Lebak Source : BPMPPT Affair of Lebak Regency
202
Lebak in Figures 2015
le ba
kka b.
bp s.
go .id
BAB VII PERDAGANGAN, HOTEL, SENI DAN PARIWISATA
Tabel 7.1.7
Banyaknya Penerbitan TDI dan IUI, 2014 Table
Number of TDI and IUI Publications, 2014
No. Bulan
2012 2013
2014 Month
1 2
3 4
5
1 Januari
8 11
10 January
2 Februari
29 11
4 February
3 Maret
9 13
12 March
4 April
8 16
10 April
5 Mei
23 18
1 May
6 Juni
29 19
9 June
7 Juli
3 3
2 July
8 Agustus
22 4
4 August
9 September
13 10
4 September
10 Oktober
10 13
1 October
11 Nopember
17 8
3 November
12 Desember
14 11
7 December
Jumlah Total 185
137 67
Sumber: BPMPPT Kabupaten Lebak Source : BPMPPT Affair of Lebak Regency
Lebak Dalam Angka 2015 203
le ba
kka b.
bp s.
go .id
TRADE, ACCOMODATION, ART AND TOURISM CHAPTER VII
Tabel 7.1.8
Penerbitan Tanda Daftar TDI, 2014 Table
Publication of TDI List Sign, 2014
PT Limited
Company Koperasi
Cooperative CV
Limited Partnership
PO Badan
Usaha
Lain Others
Jumlah Total
No. Bulan
Month 1
2 3
4 5
6 7
8
1 Januari
- -
- 10
- 10
January 2
Februari -
- 1
3 -
4 February
3 Maret
- -
- 12
- 12
March 4
April -
- -
10 -
10 April
5 Mei
- -
- 1
- 1
May 6
Juni -
- -
8 -
8 June
7 Juli
- -
- 2
- 2
July 8
Agustus -
- 1
3 -
4 August
9 September
- -
- 3
- 3
September 10
Oktober -
- 1
- -
1 October
11 Nopember
- -
- 3
- 3
November 12
Desember -
1 -
6 -
7 December
Jumlah Total -
1 3
61 -
65
Sumber: BPMPPT Kabupaten Lebak Source : BPMPPT Affair of Lebak Regency
204
Lebak in Figures 2015
le ba
kka b.
bp s.
go .id
BAB VII PERDAGANGAN, HOTEL, SENI DAN PARIWISATA
Tabel 7.1.9
Penerbitan Tanda Daftar IUI, 2014 Table
Publication of IUI List Sign, 2014
PT Limited
Company Koperasi
Cooperative CV
Limited Partnership
PO Badan
Usaha
Lain Others
Jumlah Total
No. Bulan
Month 1
2 3
4 5
7 8
9
1 Januari
- -
- -
- - January
2 Februari
- -
- -
- - February
3 Maret
- -
- -
- - March
4 April
- -
- -
- - April
5 Mei
- -
- -
- - May
6 Juni
1 -
- -
- 1
June 7
Juli -
- -
- - -
July 8
Agustus -
- -
- - -
August 9
September 1
- -
- -
1 September
10 Oktober
- -
- -
- - October
11 Nopember
- -
- -
- - November
12 Desember
- -
- -
- - December
Jumlah Total 2 - -
- - 2
Sumber: BPMPPT Kabupaten Lebak Source : BPMPPT Affair of Lebak Regency
Lebak Dalam Angka 2015 205
le ba
kka b.
bp s.
go .id
TRADE, ACCOMODATION, ART AND TOURISM CHAPTER VII
Tabel 7.1.10
Jumlah Perusahaan dan Tenaga Kerja Menurut Subsektor Industri di Kabupaten Lebak, 2014
Table Number of Establishment and Workers Engaged by Subsector in Lebak Regency,
2014
Jumlah Perusahaan Total of Company
Jumlah Tenaga Kerja Labour
No. Subsektor Industri
subsector of Industry 1
2 3
4
1 Industri Makanan dan Minuman
6 995 15 118
2 Industri pakaian jadi, tekstil dan barang
dari kulit 76
890 3
Industri kayu, barang dari kayu dan perabot rumahtangga
4 556 11 110
4 Industri kertas, barang dari kertas,
percetakan dan penjilidan -
- 5
Industri kimia, minyak bumi, batu bara, karet dan plastik
93 438
6 Industri barang galian bukan logam
- -
7 Industri barang dari logam
112 192
8 Industri barang dari logam
14 55
9 Industri Pengolahan lainnya
1 686 7 286
10 Industri jasa pengerjaan logam
449 994
Jumlah Total 13 981
36 083
Sumber: Dinas Perindustrian, Perdagangan dan Pasar Kabupaten Lebak Source : Lebak Local Government Office for Market, Trade and Industrial Services
206
Lebak in Figures 2015
le ba
kka b.
bp s.
go .id
BAB VII PERDAGANGAN, HOTEL, SENI DAN PARIWISATA
Tabel 7.2.1
Jumlah Wisatawan Nusantara yang Berkunjung ke Obyek Wisata, 2014 Table
Number of Domestic Tourist who Pay a Visit to Tourism Object, 2014
Baduy Binuangeun
Bagedur Sport Centre
Cibobos No.
Bulan Month
1 2
3 4
5 6
7
1 Januari
479 50
106 -
31 January
2 Februari
99 35
90 -
42 February
3 Maret
60 20
95 -
35 March
4 April
41 25
50 -
48 April
5 Mei
540 15
113 -
24 May
6 Juni
517 100
354 -
30 June
7 Juli
40 1 508
13 517 -
130 July
8 Agustus
80 87
686 -
73 August
9 September
207 91
218 -
25 September
10 Oktober
198 163
2.318 -
19 October
11 Nopember
175 30
36 -
7 November
12 Desember
64 27
60 -
10 December
Jumlah Total 2 500
2 151 17 643 - 474
Sumber: Dinas Informasi, Komunikasi, Budaya dan Pariwisata Kabupaten Lebak Source : Information, Communication, Culture and Tourism Service of Lebak Regency
Lebak Dalam Angka 2015 207
le ba
kka b.
bp s.
go .id
TRADE, ACCOMODATION, ART AND TOURISM CHAPTER VII
Lanjutan Tabel Continued Table 7.2.1
Pulau Manuk
Pemandian Air Panas
Sawarna Arung
Jeram
Jumlah No.
Bulan Month
1 2
3 4
5 6
7
1 Januari
121 1 985
824 -
3 596 January
2 Februari
33 767
828 -
1 894 February
3 Maret
82 585
816 -
1 693 March
4 April
91 457
823 -
1 535 April
5 Mei
80 713
821 -
2 306 May
6 Juni
93 785
811 -
2 690 June
7 Juli
309 7 202
2.819 -
25 525 July
8 Agustus
109 495
802 -
2 332 August
9 September
63 419
405 -
1 428 September
10 Oktober
105 3 792
1.033 -
7 628 October
11 Nopember
25 1 635
525 -
2 433 November
12 Desember
43 989
471 -
1 664 December
Jumlah Total 1 154
19 824 10 978
- 54 724
Sumber: Dinas Informasi, Komunikasi, Budaya dan Pariwisata Kabupaten Lebak Source : Information, Communication, Culture and Tourism Service of Lebak Regency
208
Lebak in Figures 2015
le ba
kka b.
bp s.
go .id
BAB VII PERDAGANGAN, HOTEL, SENI DAN PARIWISATA
Tabel 7.2.2
Jumlah Wisatawan Mancanegara yang Berkunjung ke Obyek Wisata 2014 Table
Number of International Tourist who Pay a Visit to Tourism Object 2014
Baduy Binuangeun
Bagedur Karang Taraje
Cibobos No.
Bulan Month
1 2
3 4
5 6
7
1 Januari
- -
- -
- January
2 Februari
- -
- -
- February
3 Maret
- -
- -
- March
4 April
- -
- -
- April
5 Mei
- -
- -
- May
6 Juni
2 -
- -
- June
7 Juli
6 -
- -
- July
8 Agustus
8 -
- -
- August
9 September
3 -
- -
- September
10 Oktober
1 -
- -
- October
11 Nopember
2 -
- -
- November
12 Desember
- -
- -
- December
Jumlah Total 22
- -
- -
Sumber: Dinas Informasi, Komunikasi, Budaya dan Pariwisata Kabupaten Lebak Source : Information, Communication, Culture and Tourism Service of Lebak Regency
Lebak Dalam Angka 2015 209
le ba
kka b.
bp s.
go .id
TRADE, ACCOMODATION, ART AND TOURISM CHAPTER VII
Lanjutan Tabel Continued Table 7.2.2
Pulau Manuk Pemandian Air
Panas Sawarna
Arung Jeram
Jumlah No.
Bulan Month
1 2
3 4
5 6
7
1 Januari
- - 10
- 10 January
2 Februari
- - 6
- 6 February
3 Maret
- - 10
- 10 March
4 April
- - 10
- 10 April
5 Mei
- - 6
- 6 May
6 Juni
- - 10
- 12 June
7 Juli
- - 20
- 26 July
8 Agustus
- - 32
- 40 August
9 September
- - 25
- 28 September
10 Oktober
- - 30
- 31 October
11 Nopember
- - 9
- 11 November
12 Desember
- - 3
- 3 December
Jumlah Total -
- 171 - 193
Sumber: Dinas Informasi, Komunikasi, Budaya dan Pariwisata Kabupaten Lebak Source : Information, Communication, Culture and Tourism Service of Lebak Regency
210
Lebak in Figures 2015
le ba
kka b.
bp s.
go .id
BAB VII PERDAGANGAN, HOTEL, SENI DAN PARIWISATA
Tabel 7.3
Perkembangan Persediaan Pangan Beras Subdivre Lebak, 2014 Table
Rice Stock in Lebak Regency, 2014
Stok Awal Pre Stock
Pemasukan Input
Stok Dikuasai
Stock Controlled
Pengeluaran Output
Stok Akhir Final Stock
No. Bulan
Month 1
2 3
4 5
6 7
1 Januari
3 172 722 2 998 503
6 171 225 74 740
6 096 485 January
2 Februari
6 096 485 1 999 010
8 095 495 3 288 345
4 807 150 February
3 Maret
4 807 150 1 305 860
6 113 010 4 398 308
1 714 702 March
4 April
1 714 702 4 734 425
6 449 127 3 828 650
2 620 477 April
5 Mei
2 620 477 7 718 980
10 339 457 4 315 110
6 024 347 May
6 Juni
6 024 347 5 469 610
11 493 957 4 006 195
7 487 762 June
7 Juli
7 487 762 2 829 480
10 317 242 4 034 425
6 282 817 July
8 Agustus
6 282 817 4 884 165
11 166 982 3 142 845
8 024 137 August
9 September
8 024 137 3 191 915
11 216 052 4 475 505
6 740 547 September
10 Oktober
6 740 547 2 088 025
8 828 572 4 291 545
4 537 027 October
11 Nopember
4 537 027 2 706 770
7 243 797 2 327 315
4 916 482 November
12 Desember
4 916 482 1 297 815
6 214 297 2 162 295
4 052 002 December
Sumber: Bulog Subdrive Banten Wilayah Lebak Source : Logistic Official Of Banten Lebak Regency
Lebak Dalam Angka 2015 211
le ba
kka b.
bp s.
go .id
le ba
kka b.
bp s.
go .id
Transportasi dan
Komunikasi
Transportation and Communication
8
le ba
kka b.
bp s.
go .id
le ba
kka b.
bp s.
go .id
BAB VIII TRANSPORTASI DAN KOMUNIKASI
Tabel 8.1.1
Daftar Kondisi Jalan, 2014 Table
List of Road Condition, 2014 Panjang
Ruas Jalan
Length of Road
Panjang Tiap Kondisi Long by Condition Km
No. Nama Ruas Jalan
Name of Road Baik
Rusak Ringan
Rusak Sedang
Rusak Berat
km Good
Light Damaged
Moderate Damaged
Heavy Dama
ged 1
2 3
4 5
6 7
I JALAN LUAR KOTA
790,40 108,4
131,4 1
Rangkasbitung -
Kolelet 5,30
1,60 1,20
1,00 1,50
2 Rangkasbitung
- Leuwidamar
21,20 11,50
2,62 2,48
4,60 3
Leuwidamar -
Gajrug 30,40
14,40 6,20
5,10 4,70
4 Sampay
- Gunungkencana
45,20 25,40
4,60 8,80
6,40 5
Gunungkencana -
Malingping 29,90
16,50 4,40
3,50 8,50
6 Gunungkencana
- Banjarsari
10,50 5,25
0,98 2,05
2,23 7
Gunungkencana -
Cirinten 13,70
10,70 0,90
1,50 0,60
8 Lebaksiuh
- Pasarkupa
12,00 4,40
0,50 4,00
3,10 9
Leuwidamar -
Cirinten 22,40
11,85 3,00
4,45 3,10
10 Cirinten
- Pasarkupa
20,50 13,80
1,50 2,00
3,20 11
Rangkasbitung -
Sajir 26,90
13,20 5,40
3,80 4,50
12 Jambubol
- Muaradua
1,80 1,80
- -
- 13
Sajira -
Kalawijo 8,00
5,40 0,50
0,70 0,70
14 Somang
- Simpang
5,80 4,40
0,50 -
- 15
Kopi -
Sangiang 20,20
11,20 3,00
2,60 2,60
16 Sempureun
- Tanjung
5,80 1,50
1,50 1,30
1,30 17
Aweh -
Mekarjaya 4,20
1,50 0,20
2,00 2,00
18 Palayangan
- Cikapek
18,80 6,92
2,68 5,20
5,20 19
Leuwijaksi -
Gununganten 6,20
2,70 0,50
2,00 2,00
20 Cibadak
- Padasuka
6,10 3,40
0,40 -
- 21
Pasirjati -
Cibadak 7,00
1,50 1,00
2,00 2,00
22 Warunggunung
- Pasarkeong
5,10 1,80
1,00 1,00
1,00 23
Ciminyak -
Sobang Cilebang
26,00 9,40
4,10 6,30
6,20 24
Cimerak -
Simpang Pasireurih
9,00 3,20
1,20 2,50
2,10 25
Sobang Cilebang - Cigemblong
25,20 10,40
2,20 4,20
8,40 26
Bantarjaya -
Muncang 20,50
6,40 0,50
2,50 11,10
27 Cibungur Sabagi -
Sindangwangi 21,70
7,10 1,80
3,60 9,20
28 Cibayawak
- Ciawi
20,50 12,00
1,50 2,50
4,50 29
Cikatomas -
Tegallumbu 16,00
8,80 1,50
3,70 2,00
30 Pasirkuray
- Cisitu
10,00 2,80
2,50 1,70
3,00 31
Kerta -
Pasirbuntu 6,60
2,50 1,00
1,00 2,10
32 Cimampang
- Cisero
22,50 13,80
1,50 2,80
4,40 Sumber: Dinas Bina Marga Kabupaten Lebak
Source : Bina Marga Official of Lebak Regency Lebak Dalam Angka 2015
215
le ba
kka b.
bp s.
go .id
TRANSPORTATION AND COMMUNICATION CHAPTER VIII
Lanjutan Tabel Continued Table 8.1.1 Panjang
Ruas Jalan
Length of Road
Panjang Tiap Kondisi Long by Condition km
No. Nama Ruas Jalan
Name of Road Baik
Rusak Ringan
Rusak Sedang
Rusak Berat
km Good
Light Damaged
Moderate Damaged
Heavy Damaged
1 2
3 4
5 6
7
33 Malingping
- Citeureup
5,00 1,00
0,75 1,25
2,00 34
Lingk.Binuangeun -
Tanjungpanto 6,00
2,75 1,25
1,00 1,00
35 Cihara
- Sukahujan
9,00 5,20
0,50 1,80
1,50 36
Sukahujan -
Cigemblong 18,00
7,50 2,00
3,50 5,00
37 Pasarkupa
- Simpang
Cibarengkok 25,00 14,40
3,00 3,40
4,20 38
Situregen -
Gununggede 19,50 10,20
3,00 1,50
4,80 39
Bolang -
Wanasalam 15,00 10,50
1,50 1,00
2,00 40
Bejod -
Katapang 8,00
4,40 0,00
1,10 2,50
41 Keboncau
- Kumpay
12,50 5,20
2,50 1,00
3,80 42
Cipariama -
Kumpay 5,00
1,80 0,00
1,20 2,00
43 Kopi
- Bojongdatar
4,00 1,90
0,50 0,70
0,90 44
Kadubana -
Picung 13,50
6,40 2,00
3,00 2,10
45 Cileles
- Posko
15,20 3,10
3,00 4,70
4,40 46
Simpang -
Ciboleger 7,80
4,60 1,50
1,20 0,50
47 Ciboleger
- Gardu
8,90 4,70
2,00 1,80
0,40 48
Gardubatok -
Candi 7,80
2,80 1,25
1,00 2,75
49 Gedong
- Sekarwangi
10,00 5,50
0,70 1,60
2,20 50
Pasirkacapi -
Curugbitung 10,50
4,50 1,50
2,50 2,00
51 Curugbitung
- Cokel
4,50 3,00
0,00 0,50
1,00 52
Kadubitung -
Bujal 17,00
6,40 3,50
3,00 4,10
53 Pasirkutu
- Jagabaya
10,35 3,80
1,50 1,80
3,25 54
Pasirbedil -
Cilengsir 4,50
2,40 0,50
1,00 0,60
55 Gunungkendeng
- Kerta
14,50 5,40
1,60 2,50
5,00 56
Cibuah -
Mogana Bts Pandeglang
8,00 3,25
2,00 1,00
1,75 57
Sumurbandung -
Sukaharja 3,50
1,00 0,50
1,00 1,00
58 Cigoong
- Cilisung
5,00 2,00
1,00 1,50
0,50 59
Guradog -
Hamberang 3,40
1,40 1,00
0,50 0,50
60 Beyeh
- Simpang
3,45 1,00
0,50 0,60
1,35 61
Rumbut -
Cibadak 4,00
1,00 1,20
1,00 0,80
62 Tajur
- Bojongleles
2,00 1,00
0,00 0,50
0,50 63
Lembursawah -
Nameng 4,50
1,20 0,80
1,00 1,50
Sumber: Dinas Bina Marga Kabupaten Lebak Source : Bina Marga Official of Lebak Regency
216
Lebak in Figures 2015
le ba
kka b.
bp s.
go .id
BAB VIII TRANSPORTASI DAN KOMUNIKASI
Tabel 8.1.2
Daftar Kondisi Jalan Dalam Kota Rangkasbitung, 2014 Table
List of Road Condition, 2014 Panjang
Ruas Jalan
Length of Road
Panjang Tiap Kondisi Long by Condition km No.
Nama Ruas Jalan Name of Road
Baik Rusak
Ringan Rusak
Sedang Rusak Berat
Good Light
Damaged Moderate
Damaged Heavy
Damaged 1
2 3
4 5
6 7
II. JALAN DALAM KOTA
REF REF
II.1 KOTA RANGKASBITUNG
1 KRT Hardiwinangun
1,20 1,20
- -
- 2
Sultan Ageng Tirtayasa 0,30
0,30 -
- -
3 Multatuli
1,20 1,20
- -
- 4
Kitarung 0,40
0,40 -
- -
5 Kimaklum
0,20 -
- 0,20
- 6
KH. Syamun 0,20
0,20 -
- -
7 Sunan Bonang
0,20 0,20
- -
- 8
KH Wasid 1 0,30
0,30 -
- -
9 KH Wasid 2
0,10 0,10
- -
- 10
Patih Derus 0,20
- -
0,20 -
11 Letnan Muharam
0,20 -
- 0,20
- 12
R. Muryani Nataatmadja 0,50
0,40 0,10
- -
13 H.M. Iko Djatmiko
0,60 0,60
- -
- 14
Maulana Yusuf 1,50
0,40 0,10
1,00 -
15 Abdi Negara
0,50 0,50
- -
- 16
Kaum 0,20
0,20 -
- -
17 KH. Mansyur
0,30 0,30
- -
- 18
KH Moch. Hasanudin 0,40
0,40 -
- -
19 KH Atim
0,30 0,30
- -
- 20
Ade Irma Suryani 0,20
0,20 -
- -
21 Stasiun
0,15 0,15
- -
- 22
Ir. H. Juanda 1,60
- 1,60
- -
23 Bakti Manunggal
1,40 1,40
- -
- 23
KH. Hasan Muchtar 0,25
0,25 -
- -
Sumber: Dinas Bina Marga Kabupaten Lebak Source : Bina Marga Official of Lebak Regency
Lebak Dalam Angka 2015 217
le ba
kka b.
bp s.
go .id
TRANSPORTATION AND COMMUNICATION CHAPTER VIII
Tabel 8.2.1
Pendapatan Angkutan Penumpang PT Kereta Api Indonesia di Stasiun Kereta Api Rangkasbitung, 2014
Table Financial Income of public Transportation of Railway on Rangkasbitung
Station, 2014
Jumlah Penumpang Nilai
No. Bulan
Value Month
Number of Passenger Rp
1 2
3 4
1 Januari
172 187 974 554 000
January 2
Februari 173 980
966 977 000 February
3 Maret
209 155 1 134 522 000
Macrh 4
April 198 959
1 156 226 000 April
5 Mei
213 941 1 306 223 000
May 6
Juni 212 672
1 273 397 000 June
7 Juli
196 838 1 163 517 000
July 8
Agustus 219 993
1 332 608 000 August
9 September
180 559 1 097 446 000
September 10
Oktober 210 542
1 231 518 000 October
11 Nopember
188 506 1 121 666 000
November 12
Desember 200 877
1 207 241 500 December
Jumlah Total 2 378 209
13 965 895 500
Sumber: PT Kereta Api Indonesia DAOP I Stasiun Rangkasbitung Source : Rangkasbitung Station of Indonesian Railway Company
218
Lebak in Figures 2015
le ba
kka b.
bp s.
go .id
BAB VIII TRANSPORTASI DAN KOMUNIKASI
Tabel 8.2.1
Pendapatan Angkutan Penumpang PT Kereta Api Indonesia di Stasiun Kereta Api Maja, 2014
Table Financial Income of public Transportation of Railway on Maja
Station, 2014
Jumlah Penumpang Pendapatan
No. Bulan
Receipts Month
Number of Passenger 000 Rp
1 2
3 4
1 Januari
36 321 64 615 000
January 2
Februari 35 785
63 425 000 February
3 Maret
35 921 63 833 000
Macrh 4
April 32 743
66 917 000 April
5 Mei
33 198 68 834 000
May 6
Juni 32 987
67 916 000 June
7 Juli
32 834 67 669 000
July 8
Agustus 32 308
66 617 000 August
9 September
33 862 68 249 000
September 10
Oktober 32 387
66 739 000 October
11 Nopember
32 121 66 418 000
November 12
Desember 33 911
68 326 000 December
Jumlah Total 404 378
801 936 209
Sumber: PT Kereta Api Indonesia DAOP I Stasiun Maja Source : Maja Station of Indonesian Railway Company
Lebak Dalam Angka 2015 219
le ba
kka b.
bp s.
go .id
TRANSPORTATION AND COMMUNICATION CHAPTER VIII
Tabel 8.2.2
Pendapatan Angkutan Penumpang PT Kereta Api Commuter Jabodetabek KCJ di Stasiun Kereta Api Maja, 2014
Table Financial Income of public Transportation of Railway on Maja
Station, 2014
Jumlah Penumpang Pendapatan
No. Bulan
Receipts Month
Number of Passenger 000 Rp
1 2
3 4
1 Januari
12 756 47 704 500
January 2
Februari 11 843
45 145 000 February
3 Maret
14 292 53 130 500
Macrh 4
April 13 907
52 681 500 April
5 Mei
16 010 61 341 000
May 6
Juni 30 713
112 324 500 June
7 Juli
31 571 114 465 500
July 8
Agustus 32 326
119 588 500 August
9 September
28 285 101 934 500
September 10
Oktober 34 466
123 225 500 October
11 Nopember
32 486 118 019 000
November 12
Desember 36 342
132 361 500 December
Jumlah Total 294 997
1 084 299 709
Sumber: PT Kereta Api Indonesia DAOP I Stasiun Maja Source : Maja Station of Indonesian Railway Company
220
Lebak in Figures 2015
le ba
kka b.
bp s.
go .id
BAB VIII TRANSPORTASI DAN KOMUNIKASI
Tabel 8.3
Banyaknya Kiriman Surat Pos menurut Jenis Kiriman Dalam Negeri dan Luar Negeri di Kantor Pos Rangkasbitung, 2014
Table The number of Letter Post by Type of Domestic and Foreign
Post Office Rangkasbitung, 2014
No. Uraian
Satuan Dalam Negeri
Luar Negeri Jumlah
Description Specification
Domestic Foreign
Total 1
2 3
4 5
6
1 Surat Biasa dan Lainnya LN
BPU Pucuk
- 1
1 Mail Letter
2 Surat Kilat PU LN
Pucuk -
180 180
Express Letter 3
Surat Kilat Khusus Pucuk
66 519 -
66 519 Overnight Delivery Letter
4 Surat Dinas
Pucuk -
- -
Official Letter 5
Surat Dinas Pos Terdaftar Pucuk
- -
- Registered Official Mail Letter
6 Surat Dinas Instansi Lain
Terdaftar Pucuk
43 -
43 Registered Institution Official
Letter 7
Surat Tercatat Registered letter - Biasa Ordinary
Pucuk -
- -
- Kilat Express Pucuk
23 075 -
23 075 - Udara Airmail
Pucuk -
- -
8 Pos Wesel Money Order
- Prima Prime 2 181
- 2 181
- Instan Instant 73 938
- 73 938
9 Pos Paket
Buah 2 009
- 2 009
Package 10
Giro Pos 4 838
- 4 838
11 Tabanas
31 400 -
31 400 Sumber: Kantor Pos Rangkasbitung
Source : Post Office, Rangkasbitung
Lebak Dalam Angka 2015 221
le ba
kka b.
bp s.
go .id
TRANSPORTATION AND COMMUNICATION CHAPTER VIII
Tabel 8.4
Jumlah Sambungan Telepon STO di Wilayah Kabupaten Lebak, 2014 Table
Number of Telephone Connections by Lebak Regency, 2014
No. Wilayah
2012 2013
2014 Region
Division
1 2
3 4
5
1 Rangkasbitung
6 822 7 433
8 806 2
Leuwidamar 473
514 595
3 Malingping
973 1 087
1 285 4
Bayah 752
825 984
Jumlah 9 020
9 859 11 670
Sumber: PT.Telkom, Lebak Source : PT. Telkom Lebak Regency
222
Lebak in Figures 2015
le ba
kka b.
bp s.
go .id
Keuangan dan Harga - harga
Finances and Prices
9
le ba
kka b.
bp s.
go .id
le ba
kka b.
bp s.
go .id
BAB IX KEUANGAN DAN HARGA-HARGA
Tabel 9.1.1
Jumlah Pendapatan dan Belanja Keuangan Pemerintah Kabupaten Lebak, 2014 Table
Number of Receipts and Expenditure Finance in Government of Lebak Regency, 2014
Uraian Jumlah
Description Total
Rp 1
2 1
PENDAPATAN Income 1.1 Pendapatan Asli Daerah Actual Revenue
1.1.1 Pajak Daerah 51 035 621 198,00
Region Tax 1.1.2 Retribusi Daerah
140 986 605 640,00 Region Retribution
1.1.3 Hasil PMD Peng.Kekayaan Daerah yang dipisahkan
3 715 635 556,00 1.1.4 Lain-Lain Pendapatan Asli Daerah
48 710 191 263,15 Others of Actual Revenue
1.2 Dana Perimbangan Equilibrium Fund