Preparing for First Test Cycle It is desirable to understand the following concepts in order to get ready for the first

12.7.3 Preparing for First Test Cycle It is desirable to understand the following concepts in order to get ready for the first

test cycle: (i) the different states of a known defect in the form of a life cycle from the new state to the closed state, (ii) assignment of test cases to test engineers, and (iii) an entry criterion telling us when to start the first test cycle. These concepts are explained below.

Life Cycle of a Defect The idea behind giving a life-cycle model to defects is to be able to track them from the time they are detected to the time they are closed. The life cycle of a defect is represented by a state transition diagram with five states: new, assigned, open, resolved, and closed. The states of defects are used in the description of individual test cycles. A defect is put in the new state by

a test engineer, called a submitter, as soon as it is revealed by a failed test case. After a defect in the new state is reviewed and presumed to be a true defect, it is moved to the assigned state, which means that the defect has been assigned to

a software developer. The software developer moves the defect from the assigned state to the open state as soon as he or she starts working on the defect. Once the developer is satisfied by means of unit testing that the defect has been fixed, the defect is moved to the resolved state. The submitter verifies the fix by executing

367 the associated failed test cases against the new build prepared by the development

12.7 TEST EXECUTION STRATEGY

team after a defect moves to the resolved state. If the submitter is satisfied by means of system testing that a defect in the resolved state has been truly fixed, the defect is moved to the closed state, and the associated test cases are declared as passed. Otherwise, the defect is moved back to the open state, and the associated test cases are still considered to have failed. A detailed model of a defect life-cycle is discussed in Chapter 13.

Assignment of Test Cases Since no single engineer is going to execute all the test cases all by themselves, it is desirable to assign test cases to appropriate test engineers by considering their expertise and interest. Assignment of test cases to test engineers may be changed from test cycle to test cycle for three reasons: (i) when a test case is assigned to a different engineer, the test case is likely to

be executed from a different perspective; (ii) an opportunity to learn something new makes a positive impact on employee morale; and (iii) knowledge about test cases is distributed throughout the test group, so if a test engineer is temporarily unavailable for the task, it is easy to find a competent replacement.

Entry Criteria for First Test Cycle The entry criteria for the first test cycle, given in Table 12.3, tell us when we should start executing system tests. The criteria consist of five groups which depend on five cross-functional groups: marketing, hardware, software, technical publication, and system testing. Each group has one or more condition items to be satisfied. System testing should not start until all the groups of the entry criteria are satisfied. Otherwise, a revert criterion may be triggered sooner during system test execution.

The first group of the entry criteria concerns the completion of the project plan. The marketing team provides a business justification for the proposed product and its requirements. The engineering team defines a development approach, an exe- cution environment, a schedule of the milestones, and the possible risks involved, identifying the dependencies of the product on other elements. The software project plan must be reviewed and approved by the software, hardware, marketing, and technical publication groups before system testing is initiated.

System testing may include new hardware, and, therefore, the second group of the entry criteria is about adequate testing of any new hardware system or subsystem used by the software system. The pass-and-fail results obtained from executing test cases cannot be considered to be dependable without a stable hardware base. It is important to ensure that the hardware has gone through the following three phases: (i) planning and specification; (ii) design, prototype implementation, and testing; and (iii) integration with the software system.

The third group of the entry criteria is about completion of the development and testing work by the software development group. It consists of seven criteria, which provides evidence that the system is sufficiently stable to withstand the rigor of system testing. The stability of a system should be based on metrics and evidence, rather than statements from software managers to start system testing. For example, documentation of weekly passed-and-failed status of all the unit and integration test cases should be available for review. The unit test and system

368 CHAPTER 12 SYSTEM TEST PLANNING AND AUTOMATION

TABLE 12.3 Entry Criteria for First System Test Cycle Group

Criteria

1. Marketing 1. Project plan and/or system requirements document is complete and updated.

2. Hardware 2. All approved hardware versions for field deployment are available in-house. A list of these hardware versions should be provided.

3. Hardware version control process is in place and documented. 4. Hardware DVT plan is completed and results are available.

3. Software 5. All functional specifications (FSs) are complete and have been updated to be in sync with the implementation. A list of individual FSs, including version number and status, must be provided.

6. All design specifications (DSs) are complete and have been updated to be in sync with the implementation. A list of DSs, including version number and status, must be provided.

7. All code complete and frozen; code changes allowed for only defect fixing but not features.

8. A software version control is in place. 9. 100% unit tests are executed and passed.

10. 100% system integration tests are executed and passed. 11. Not more than two unique crashes have been observed during

the last two weeks of integration testing. 4. Technical publication

12. A draft version of the user guide is available. 5. System testing

13. The system test plan is in place (reviewed and approved). 14. Test execution working document is in place and complete.

integration test reports must be thoroughly reviewed by the system test team before the start of the first test cycle.

The fourth group of the entry criteria concerns the readiness of the user guides written by technical writers. Unless the user guides are ready, the system test engineers will not be able to verify the accuracy and usability.

The fifth group of the entry criteria relates to a system test plan. Detailed test cases are included in the test plan. One can estimate the quality of the software early in the system testing phase [11] by documenting the test cases. The system test plan must be reviewed and approved by the software, hardware, marketing, and technical publication groups before the start of system testing.

Cross-functional review meetings must be conducted to track the status of the readiness criteria, outlined in Table 12.3, at least four weeks prior to the start of the first test cycle. Representatives from the five groups must attend the cross-functional review meeting to provide the status in their respective areas. Any exceptions to these criteria must be documented, discussed, and agreed upon at the final cross-functional status review meeting.

12.7 TEST EXECUTION STRATEGY

Dokumen yang terkait

ANALISIS DANA PIHAK KETIGA PADA PERBANKAN SYARIAH DI INDONESIA PERIODE TRIWULAN I 2002 – TRIWULAN IV 2007

40 502 17

ANALISIS KEMAMPUAN SISWA SMP DALAM MENYELESAIKAN SOAL PISA KONTEN SHAPE AND SPACE BERDASARKAN MODEL RASCH

69 778 11

Analisis Komparasi Internet Financial Local Government Reporting Pada Website Resmi Kabupaten dan Kota di Jawa Timur The Comparison Analysis of Internet Financial Local Government Reporting on Official Website of Regency and City in East Java

19 819 7

STUDI PENJADWALAN DAN RENCANA ANGGARAN BIAYA (RAB) PADA PROYEK PEMBANGUNAN PUSAT PERDAGANGAN CIREBON RAYA (PPCR) CIREBON – JAWA BARAT

34 235 1

PENGARUH PENGGUNAAN BLACKBERRY MESSENGER TERHADAP PERUBAHAN PERILAKU MAHASISWA DALAM INTERAKSI SOSIAL (Studi Pada Mahasiswa Jurusan Ilmu Komunikasi Angkatan 2008 Universitas Muhammadiyah Malang)

127 505 26

AN ANALYSIS OF DESCRIPTIVE TEXT WRITING COMPOSED BY THE HIGH AND THE LOW ACHIEVERS OF THE EIGHTH GRADE STUDENTS OF SMPN SUKORAMBI JEMBER

11 83 16

AN ANALYSIS OF LANGUAGE CONTENT IN THE SYLLABUS FOR ESP COURSE USING ESP APPROACH THE SECRETARY AND MANAGEMENT PROGRAM BUSINESS TRAINING CENTER (BTC) JEMBER IN ACADEMIC YEAR OF 2000 2001

3 95 76

A DISCOURSE ANALYSIS ON “SPA: REGAIN BALANCE OF YOUR INNER AND OUTER BEAUTY” IN THE JAKARTA POST ON 4 MARCH 2011

9 161 13

Improving the Eighth Year Students' Tense Achievement and Active Participation by Giving Positive Reinforcement at SMPN 1 Silo in the 2013/2014 Academic Year

7 202 3

THE INTEGRATION BETWEEN INDONESIA AND WORLD RICE MARKET

1 88 12