PERUSAHAAN PERSEROAN PERSERO PT TELEKOMUNIKASI INDONESIA Tbk AND ITS SUBSIDIARIES
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS As of March 31, 2014 and for three months period then ended unaudited
Figures in tables are expressed in billions of rupiah, unless otherwise stated
98
40. TELECOMMUNICATIONS SERVICE TARIFFS continued b. Mobile cellular telephone tariffs continued
Under MoCI Decree No. 09PERM.KOMINFO042008 dated April 7, 2008, the cellular tariffs of operating telecommunication services connected through mobile cellular network consist of the
following: •
Basic telephony services tariff •
Roaming tariff, andor •
Multimedia services tariff, with the following traffic structure:
• Activation fee
• Monthly subscription charges
• Usage charges
• Additional facilities fee.
c. Interconnection tariffs
The Indonesian Telecommunication Regulatory Body “ITRB”, in its letter No. 227BRTIXII2010 dated December 31, 2010, decided to implement new interconnection tariffs effective from
January 1, 2011 for cellular mobile network, satellite mobile network and fixed local network, and effective from July 1, 2011 for fixed wireless local network with a limited mobility.
Based on Decree No. 201KEPDJPPIKOMINFO72011 dated July 29, 2011 of the Director General of Post and Informatics, ITRB approved the Company’s revision of Reference
Interconnection Offer “RIO” regarding the interconnection tariff. ITRB, in its letter No. 262BRTIXII2011 dated December 12, 2011, decided to change the basis
for interconnection SMS tariff to cost basis with a maximum tariff of Rp23 per SMS effective from June 1, 2012, for all telecommunication provider operators.
ITRB, in its letter No. 118KOMINFODJPPIPI.02.042014 dated January 31, 2014, decided to change the basis for new interconnection tariff effective from February 2014 to December 2016
that will be evaluated each year.
d. Network lease tariffs
Through MoCI Decree No. 03PERM.KOMINFO12007 dated January 26, 2007 concerning “Network Lease”, the Government regulated the form, type, tariff structure, and tariff formula for
services of network lease. Pursuant to the MoCI Decree, the Director General of Post and Telecommunication issued its Letter No. 115 Year 2008 dated March 24, 2008 which stated “The
Agreement on Network Lease Service Type Document, Network Lease Service Tariff, Available Capacity of Network Lease Service, Quality of Network Lease Service, and Provision Procedure of
Network Lease Service in 2008 Owned by Dominant Network Lease Service Provider”, in conformity with the Company’s proposal.
e. Tariff for other services
The tariffs for satellite lease, telephony services, and other multimedia are determined by the service provider by taking into account the expenditures and market price. The Government only
determines the tariff formula for basic telephony services. There is no stipulation for the tariff of other services.
PERUSAHAAN PERSEROAN PERSERO PT TELEKOMUNIKASI INDONESIA Tbk AND ITS SUBSIDIARIES
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS As of March 31, 2014 and for three months period then ended unaudited
Figures in tables are expressed in billions of rupiah, unless otherwise stated
99
41. SIGNIFICANT COMMITMENTS AND AGREEMENTS
a. Capital expenditures As of March 31, 2014, capital expenditures committed under the contractual arrangements,
principally relating to procurement and installation of switching equipment, transmission equipment and cable network are as follows:
Amounts in foreign currencies Equivalent
Currencies in millions
in rupiah
Rupiah -
11,874 U.S. dollar
670 7,634
Euro 0.3
5
Total 19,513
The above balance includes the following significant agreements: i
The Company
Contracting parties Initial date of
agreement Significant provisions of the
agreement
The Company and Sansaine Huawei Consortium August 3, 2009
Procurement and installation agreement for softswitch and modernization of
MSAN Divre I, Divre II, Divre III and Divre IV
The Company and PT ZTE Indonesia September 4, 2009
Procurement and installation agreement for modernization of MSAN softswitch
Divre VI and Divre VII The Company and PT ZTE Indonesia
October 6, 2010 Procurement and installation agreement
for Gigabit Capable Passive Optical Network G-PON
The Company and PT Industri Telekomunikasi Indonesia
December 30, 2010 Procurement and installation agreement
for copper wire access modernization through Trade InTrade Off method
The Company and PT Lintas Teknologi Indonesia June 8, 2011
Procurement and installation agreement for DWDM Alcatel Lucent ALU
The Company and G-Pas Consortium June 14, 2011
Procurement and installation agreement for Outside Plant Fiber Optic OSP-FO
Access and RMJ GPAS The Company and Mandiri Maju Consortium
June 14, 2011 Procurement and installation agreement
for OSP-FO Access and RMJ The Company and PT QDC Technologies
June 14, 2011 Procurement and installation agreement
for OSP-FO Access and RMJ The Company and TEKKEN-DMT Consortium
June 14, 2011 Procurement and installation agreement
for OSP-FO Access and RMJ The Company and DJAFa Consortium
June 14, 2011 Procurement and installation agreement
for OSP-FO Access and RMJ The Company and PT Telekomindo Primakarya
June 14, 2011 Procurement and installation agreement
for OSP-FO Access and RMJ The Company and PT Nasio Karya Pratama
June 14, 2011 Procurement and installation agreement
for OSP-FO Access and RMJ The Company and Jembo Kabel-Tridayasa
Consortium June 14, 2011
Procurement and installation agreement for OSP-FO Access and RMJ
The Company and Pancamas Consortium June 14, 2011
Procurement and installation agreement for OSP-FO Access and RMJ