KEBERHASILAN PROYEK DITINJAU DARI ASPEK WAKTU (Studi Kasus pada Proyek Pembangunan Gedung) KEBERHASILAN PROYEK DITINJAU DARI ASPEK WAKTU (Studi Kasus pada Proyek Pembangunan Gedung).

KEBERHASILAN PROYEK DITINJAU DARI ASPEK WAKTU
(Studi Kasus pada Proyek Pembangunan Gedung)

Laporan Tugas Akhir
Sebagai salah satu syarat untuk memperoleh gelar Sarjana dari
Universitas Atma Jaya Yogyakarta

Oleh :
GRACE CHRISNAWATI CHRISTIANTO
NPM. : 11 02 13793

P R OGR AM S T U DI T E K N I K S I P I L
F AK U L T AS T E K N I K
U N I VE R S I T AS AT MA J AY A Y OGY AK AR T A
Y OGY AK AR T A
JU L I 2 0 1 5

Kawula mung saderma, mobah-mosik kersaning Hyang sukmo –
Anonymous

T he on ly way to do gr eat wor k is to love what y ou do  Steve Jobs


Ka r en a i t u Ak u ber k a t a k epa d a m u : a pa sa j a
y a n g k a m u m i n t a d a n d o a k a n , per c a y a l a h
ba hwa k a m u t el a h m en er i m a n y a , m a k a ha l i t u
a k a n d i ber i k a n k epa d a m u – Ma r k u s 11:24

You become what you believe – Oprah Winfrey


 

 







 




 




 –


Tugas Akhir ini aku persembahkan untuk
Tuhan Yesus Kristus, orang tuaku tercinta, kakakku tersayang, kekasihku,
sahabat-sahabatku dan teman-temanku.

DAFTAR ISI

HALAMAN JUDUL .....................................................................................
HALAMAN PERNYATAAN .......................................................................
HALAMAN PENGESAHAN ........................................................................

HALAMAN PENGESAHAN PENGUJI ....................................................
HALAMAN MOTTO DAN PERSEMBAHAN .........................................
KATA PENGANTAR ....................................................................................
DAFTAR ISI ...................................................................................................
DAFTAR TABEL .........................................................................................
DAFTAR GAMBAR .....................................................................................
DAFTAR PERSAMAAAN ...........................................................................
DAFTAR LAMPIRAN .................................................................................
INTISARI ......................................................................................................

i
ii
iii
iv
v
vi
viii
x
xi
xii

xiii
xiv

BAB I
1.1
1.2
1.3
1.4
1.5
1.6
1.7

PENDAHULUAN........................................................................
Latar Belakang .............................................................................
Rumusan Masalah .........................................................................
Batasan Masalah ...........................................................................
Keaslian Tugas Akhir ...................................................................
Tujuan Penelitian .........................................................................
Manfaat Penelitian .......................................................................
Sistematika Penulisan ...................................................................


1
1
3
3
3
3
4
4

BAB II
2.1
2.2
2.3
2.4

TINJAUAN PUSTAKA ..............................................................
Teori Penjadwalan ........................................................................
Proyek Konstruksi .........................................................................
Manajemen Proyek Konstruksi .....................................................

Keberhasilan Proyek ....................................................................
2.4.1 Definisi ................................................................................
2.4.2 Faktor-faktor yang Mempengaruhi Keberhasilan Proyek
dan Kegagalan Proyek ........................................................

6
6
6
6
7
7
10

METODOLOGI PENELITIAN ...............................................
Obyek dan Subyek Penelitian ......................................................
Data dan Variabel ..........................................................................
Cara Pengambilan Data .................................................................
Metode Analisis ...........................................................................
Metode Analisis Data ....................................................................
Bagan Alir Penelitian ....................................................................


16
16
16
17
17
17
20

BAB IV ANALISIS DATA DAN PEMBAHASAN ...............................
4.1 Hasil Penelitian ............................................................................
4.1.1 Kesahihan dan Keandalan Angket Penelitian ....................

21
21
21

BAB III
3.1
3.2

3.3
3.4
3.5
3.6

viii

4.1.2 Karakteristik Responden .....................................................
4.2 Analisis Data .................................................................................
4.2.1 Analisis Time Variation ......................................................
4.2.2 Analisis Keberhasilan Proyek .............................................

22
27
27
27

BAB V
KESIMPULAN DAN SARAN ...................................................
5.1 Kesimpulan ...................................................................................

5.2 Saran..............................................................................................

40
40
40

DAFTAR PUSTAKA .....................................................................................
LAMPIRAN

42

ix

DAFTAR TABEL
No.
4.1
4.2
4.3
4.4
4.5

4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
4.14
4.15
4.16
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24


NAMA TABEL
Hasil Uji Validitas Keberhasilan Proyek
Hasil Uji Reliabilitas Keberhasilan Proyek
Distribusi Frekuensi Berdasarkan Jenis Kelamin
Distribusi Frekuensi Berdasarkan Usia
Distribusi Frekuensi Berdasarkan Jabatan
Distribusi Frekuensi Berdasarkan Pengalaman Kerja
Distribusi Frekuensi Berdasarkan Pendidikan
Distribusi Frekuensi Berdasarkan Penghasilan
Hasil Analisis Time Variation
Keberhasilan dari Faktor Bahan
Keberhasilan dari Faktor Pekerja
Keberhasilan dari Faktor Peralatan
Keberhasilan dari Faktor Keuangan
Keberhasilan dari Faktor Situasi
Keberhasilan dari Faktor Perubahan
Keberhasilan dari Faktor Hubungan dengan Pemerintah
Keberhasilan dari Faktor Kontrak
Keberhasilan dari Faktor Waktu dan Kontrol
Faktor-faktor Keberhasilan Proyek
Faktor-faktor Keberhasilan pada Proyek A
Faktor-faktor Keberhasilan pada Proyek B
Faktor-faktor Keberhasilan pada Proyek C
Faktor-faktor Keberhasilan pada Proyek D
Faktor-faktor Keberhasilan pada Proyek E

x

HAL.
21
22
23
23
24
25
25
26
27
28
28
29
29
30
31
31
32
32
33
36
36
36
37
37

DAFTAR GAMBAR
No.
2.1
3.1

NAMA GAMBAR
Sasaran Proyek dan Tiga Kendala
Bagan Alir Penelitian

xi

HAL.
8
20

DAFTAR PERSAMAAN
PERSAMAAN
KETERANGAN
Time variation (variasi waktu)
3.1
3.2
Mean
3.3
Deviasi Standar

xii

HAL.
17
18
19

DAFTAR LAMPIRAN
No
1
2
3
4
5

NAMA LAMPIRAN
Data Responden
Daftar Pertanyaan Responden
Rekap Hasil Kuesioner (Input SPSS)
Rekap Hasil Kuesioner Masing-masing Proyek
Output SPSS

xiii

HAL.
43
44
46
48
51

INTISARI
KEBERHASILAN PROYEK DITINJAU DARI ASPEK WAKTU (Studi
Kasus Proyek Pembangunan Gedung), Grace Chrisnawati Christianto, NPM
11.02.13793, tahun 2015, Bidang Peminatan Manajemen Konstruksi, Program
Studi Teknik Sipil, Fakultas Teknik, Universitas Atma Jaya Yogyakarta.
Kunci utama keberhasilan melaksanakan proyek tepat waktu adalah
perencanaan dan penjadwalan proyek yang lengkap dan tepat. Proyek dikatakan
berhasil jika proyek yang dilaksanakan dapat selesai tepat waktu, tepat guna, dan
tepat biaya. Setiap proyek memiliki karakteristik yang berbeda-beda sehingga
faktor-faktor yang mempengaruhi keberhasilan juga berbeda. Faktor-faktor yang
mempengaruhi keberhasilan proyek yaitu bahan, pekerja, peralatan, keuangan,
situasi, perubahan, hubungan dengan pemerintah, kontrak, waktu dan jadwal.
Penelitian ini mengenai keberhasilan proyek ditinjau dari aspek waktu dan
faktor-faktor yang mempengaruhi keberhasilan proyek tersebut. Penelitian
dilaksanakan dengan mendapatkan data kurva S, laporan mingguan, atau laporan
bulanan, melakukan wawancara serta menyebarkan kuesioner sejumlah 50 pada
pelaksana proyek. Kuesioner yang kembali untuk dianalisis sejumlah 48. Analisis
data dilakukan dengan menghitung time variation (variasi waktu) untuk
mengetahui keberhasilan proyek tersebut dan analisis ranking untuk mengetahui
faktor-faktor yang mempengaruhi keberhasilan tiap proyek.
Hasil dari analisis data dengan time variation, kelima proyek menunjukkan
nilai negatif yang berarti proyek-proyek tersebut tidak mengalami keterlambatan.
Sedangkan hasil dari analisis ranking menunjukkan faktor yang mempengaruhi
keberhasilan proyek pembangunan gedung yaitu faktor keuangan dengan mean
3.32 dan standar deviasi 0.69, faktor bahan dengan mean 3.30 dan standar deviasi
0.58, faktor peralatan dengan mean 3.29 dan standar deviasi 0.59, faktor kontrak
dengan mean 3.27 dan standar deviasi 0.63, faktor pekerja dengan mean 3.24 dan
standar deviasi 0.83, faktor hubungan dengan pemerintah dengan mean 3.22 dan
standar deviasi 0.61, faktor waktu dan kontrol dengan mean 3.22 dan standar
deviasi 0.67, faktor perubahan dengan mean 3.18 dan standar deviasi 0.73, serta
faktor situasi dengan mean 3.06 dan standar deviasi 0.73.

Kata Kunci: faktor keberhasilan, time variation, analisis ranking, mean, standar
deviasi, faktor keuangan

xiv