PROYEK PENGEMBANGAN BANDARA AHMAD YANI SEMARANG (PPSRG) PAKET – 1
Disusun Oleh :
Daniel Managam Napitupulu
12.12.0047
Laporan Praktik Kerja
PROYEK PENGEMBANGAN BANDARA AHMAD YANI
SEMARANG (PPSRG) PAKET
- – 1
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS KATOLIK SOEGIJAPRANATA
SEMARANG
2016
Disusun Oleh :
Daniel Managam Napitupulu
12.12.0047
Laporan Praktik Kerja
PROYEK PENGEMBANGAN BANDARA AHMAD YANI
SEMARANG (PPSRG) PAKET
- – 1
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS KATOLIK SOEGIJAPRANATA
SEMARANG
2016
Lembar Pengesahan Praktik Kerja
PROYEK PENGEMBANGAN BANDARA AHMAD YANI
(PPSRG) PAKET SEMARANG – 1
Disusun Oleh :
Daniel Managam Napitupulu
12.12.0047
Telah diperiksa dan disetujui, Semarang,……………………………….
Ketua Program Studi Dosen Pembimbing Daniel Hartanto, S.T., M.T. Ir. Widija Suseno, MT
LAMPIRAN KEPUTUSAN REKTOR
UNIVERSITAS KATOLIK SOEGIJAPRANATA
Nomor : 0047/SK.rek/X/2013 Tanggal : 07 Oktober 2013
Tentang : PERNYATAAN KEASLIAN LAPORAN PRAKTIK KERJA PROYEK PROYEK PENGEMBANGAN BANDARA AHMAD
YANI SEMARANG (PPSRG) PAKET
- – 1
PERNYATAAN KEASLIAN PRAKTIK KERJA
Dengan ini kami menyatakan bahwa dalam laporan praktik kerja yang berjudul
“Proyek Pengembangan Bandara Ahmad Yani Semarang (PPSRG) Paket- 1” ini tidak terdapat karya yang pernah diajukan untuk
memperoleh nilai mata kuliah praktik kerja, dan sepanjang pengetahuan saya juga tidak terdapat karya atau pendapat yang pernah ditulis atau diterbitkan oleh orang lain kecuali yang tertulis diacu dalam naskah ini dan disebutkan dalam daftar pustaka. Apabila dikemudian hari ternyata terbukti bahwa laporan praktik kerja ini sebagian atau seluruhnya hasil plagiasi, maka saya rela untuk dibatalkan, dengan segera akibat hukumnya sesuai peraturan yang berlaku pada
- – Universitas Katolik Soegijapranata dan/atau peraturan perundang undangan yang berlaku.
Semarang, (Daniel Managam Napitupulu)
NIM : 12.12.0047
KATA PENGANTAR
Puji dan syukur saya ucapkan atas kehadirat Tuhan yang Maha Esa, karena berkat-NYA saya dapat menyelesaikan laporan praktik kerja megenai Pembangunan Proyek Pengembangan Bandara Ahmad Yani Semarang (PPSRG) Paket-1 dengan konsentrasi Peralatan. Laporan praktik kerja ini dibuat sebagai laporan pertanggungjawaban selama 90 (Sembilan Puluh) hari kalender atas apa yang dilakukan selama berada di lokasi proyek / lapangan. Selain itu, laporan ini dibuat untuk memenuhi penilaian mata kuliah praktik kerja serta sebagai salah satu syarat mengikuti Tugas Akhir (TA).
Saya juga mengucapkan terima kasih kepada pihak
- – pihak yang telah membantu saya dalam proses praktik kerja serta pembuatan laporan ini.
1. PT. Angkasa Pura 1 selaku owner Proyek Pengembangan Bandara Ahmad
Yani Semarang (PPSRG) yang telah mengijinkan saya untuk praktik kerja di proyek beliau.
2. Para Satuan Kerja angkasa pura 1 yang membimbing saya selama proses praktik kerja berlangsung, serta pengetahuan – pengetahuan dari beliau yang disampaikan secara lisan. Baik pengetahuan berupa akademik ataupun non akademik (moral).
3. Ir. Widija Suseno, MT selaku dosen pembimbing praktik kerja yang membimbing saya baik selama proses praktik kerja serta penyusunan laporan, serta banyak memberikan masukkan
- – masukkan untuk saya ketika berada di lokasi proyek.
Mohon maaf bila ada kata – kata yang salah atau keliru di dalam laporan pratik kerja ini. Saya sebagai penyusun menyadari masih banyak kekurangan
- – kekurangan dalam hal penyusunan laporan praktik kerja ini, baik dari segi teori, gambar, ataupun informasi – informasi mengenai pelaksanaan Proyek Pengembangan Bandara Ahmad Yani Semarang (PPSRG) Paket-1. Maka kritik dan saran saya harapkan agar laporan ini menjadi lebih baik lagi.
Hormat Saya, Penyusun
KARTU ASISTENSI
PERMOHONAN IJIN KERJA PRAKTEK
SURAT PERINTAH KERJA
BIMBINGAN KERJA PRAKTEK
KETERANGAN SELESAI KERJA PRAKTEK
UCAPAN TERIMA KASIH
DAFTAR ISI HALAMAN JUDUL ······························································· i HALAMAN PENGESAHAN ···················································· ii SURAT PERNYATAAN ························································· iii KATA PENGANTAR ····························································· iv KARTU ASISTENSI ······························································ v
SURAT PERMOHONAN IJIN KERJA PRAKTEK ······················· vii
SURAT PERINTAH KERJA···················································· viii
SURAT BIMBINGAN KERJA PRAKTEK ·································· ix SURAT KETERANGAN SELESAI KERJA PRAKTEK ················· x SURAT UCAPAN TERIMA KASIH ·········································· xiDAFTAR ISI ········································································ xii
DAFTAR GAMBAR ······························································ xv
DAFTAR TABEL ·································································· xvii
DAFTAR LAMPIRAN ··························································· xviii
1.1 Latar Belakang Proyek ······················································· 1
1.2 Lokasi Proyek ·································································· 2
1.3 Fungsi Bangunan ······························································ 3
1.4 Data Proyek ···································································· 6
2.1 Pemilik Proyek (Owner)······················································ 7
2.1.1 Tugas Pemilik Proyek ······················································ 7
2.2 Konsultan ······································································· 8
2.2.1 Tugas Konsultan ···························································· 8
2.3 Kontraktor ······································································ 9
2.3.1 Tugas Kontraktor···························································· 9
3.1 Struktur Bangunan ···························································· 14 a.
Tiang Pancang ····························································· 14
b.
Caping Beam ······························································ 15 c. Mortar ······································································ 15 d.
Bearing Pad ······························································· 16 e. Balok Girder ······························································· 17 f. Diafragma ·································································· 17 g.
Balok Joint ································································· 18 h. Slab Deck ·································································· 19 i. Slab Lantai ································································· 19 j. Berrier atau Parapet······················································· 20
3.2 Metode Pelaksanaan ························································· 21
3.2.1 Metode Pelaksanaan Pembesian ········································ 25
3.2.2 Metode Pelaksanaan Bekisting·········································· 28
3.2.3 Metode Pelaksanaan Pengecoran ······································· 34
3.3 Peralatan dan Alat Berat ····················································· 35
3.3.2 Peralatan ··································································· 37 a.
Concrete Vibrator ···················································· 38 b. Genset ·································································· 39 c. Gerinda Potong ······················································· 41 d. Bar Cutter ····························································· 44 e. Alat Ukur (TS/Theodolite) ·········································· 46 f. Waterpass······························································ 50 g.
Steel Bar Bending Machine ········································· 52 h. Genset Diesel ························································· 53
3.3.2 Alat Berat ·································································· 55 a.
Crawler Crane ························································ 55 b. Conrete Pump Truck ················································· 58 c. Excavator ······························································ 60 d. Mobil Crane ··························································· 62 e. Truck Mixer ··························································· 63 f. Flat Bed Truck ························································ 64 g.
Bulldozer······························································· 65 h.
Dump Truck ··························································· 67
3.4 Metode Pelaksanaan Pekerjaan ············································· 68
3.4.1 Rencana kerja ······························································ 68 a.
Network Planning ··················································· 69 b. Kurva S ······························································· 69
3.5 Administrasi proyek ·························································· 70
3.5.1 Sistem Kerja proyek ························································ 70
3.5.2 Keamanan dan Keselamatan Kerja(K3) ·································· 70
3.6 Pengendalian Proyek ························································· 72
3.6.1 Pengendalian Mutu (Quality Control)···································· 72
3.6.2 Pengendalian Biaya ························································· 75
3.4.3 Pengendalian Waktu ························································ 76
BAB IV PENUTUP ································································ 80
4.1 Kesimpulan ······································································ 80
4.2 Saran ·············································································· 81
DAFTAR PUSTAKA ······························································ 82
LAMPIRAN ········································································· 84
DAFTAR GAMBAR